D12-PPM FY2024
D12 County · est $1.4M
Bid dateThursday, March 21—
D12 County · est $1.4M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 54 more items below.
| Item | Quantity | R1Phillips Paving LLC | R2Karvo Companies INC | R3Ronyak Paving INC | % of bid |
|---|---|---|---|---|---|
| 442E22101 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 908 CY | $320 | $475 | $400 | 17% |
| 253E02001 PAVEMENT REPAIR, AS PER PLAN | 110 CY | $2,400 | $1,800 | $3,125 | 15% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $195,000 | $250,000 | $158,000 | 11% |
| 252E01001 FULL DEPTH RIGID PAVEMENT REMOVAL AND FLEXIBLE REP | 750 SY | $250 | $190 | $440 | 11% |
| 624E10000 MOBILIZATION | 1 LS | $135,610 | $231,200 | $111,100 | 8% |
| 442E22101 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 235 CY | $405 | $475 | $425 | 6% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 268 CY | $325 |
| Item | Quantity | R1Phillips Paving LLC | R2Karvo Companies INC | R3Ronyak Paving INC |
|---|---|---|---|---|
| 623E39501 MONUMENT ASSEMBLY ADJUSTED TO GRADE, AS PER PLAN | 1 EACH | $1,500 | $1,000 | $1,075 |
| 623E39601 MONUMENT ASSEMBLY RECONSTRUCTED TO GRADE, AS PER P | 1 EACH | $2,000 | $1,250 | $1,325 |
| 209E60201 LINEAR GRADING, AS PER PLAN | 128.04 STA | $25.00 | $25.00 | $20.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 |
| 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN | 1 EACH | $2,000 | $1,750 | $1,050 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $305 |
| $225 |
| 5% |
| 252E01001 FULL DEPTH RIGID PAVEMENT REMOVAL AND FLEXIBLE REP | 150 SY | $500 | $400 | $600 | 4% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (2.5") | 13,072 SY | $5.00 | $12.00 | $7.00 | 4% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 450 HOUR | $100 | $75.00 | $100 | 3% |
| 441E70101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), AS | 139 CY | $320 | $355 | $265 | 3% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (162 CY | $250 | $255 | $200 | 2% |
| 252E01001 FULL DEPTH RIGID PAVEMENT REMOVAL AND FLEXIBLE REP | 75 SY | $500 | $350 | $550 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $30,000 | $20,000 | $14,998 | 2% |
| 621E00100 RPM | 811 EACH | $36.00 | $36.00 | $60.00 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (1.5") | 6,441 SY | $4.00 | $3.00 | $2.00 | 1% |
| 254E01010 PAVEMENT PLANING, PORTLAND CEMENT CONCRETE, (1.5") | 5,646 SY | $4.00 | $10.00 | $8.00 | 1% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (3.25") | 3,341 SY | $6.00 | $6.00 | $3.50 | 1% |
| 630E97800 SIGNING, MISC.:ADDITIONAL SIGNS, GROUND MOUNTED, A | 600 SF | $30.00 | $30.00 | $30.00 | 1% |
| 614E20110 WORK ZONE LANE LINE, CLASS I, 6", 642 PAINT | 11.89 MILE | $980 | $980 | $3,500 | 1% |
| 1 EACH |
| $3,000 |
| $2,125 |
| $1,600 |
| 611E99151 INLET ADJUSTED TO GRADE, AS PER PLAN | 1 EACH | $2,000 | $4,000 | $1,050 |
| 611E99154 INLET RECONSTRUCTED TO GRADE | 1 EACH | $3,000 | $5,000 | $1,600 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 1,000 LB | $3.00 | $1.00 | $6.00 |
| 203E10000 EXCAVATION | 15 CY | $75.00 | $15.00 | $70.00 |
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 25 SY | $150 | $65.00 | $150 |
| 304E20000 AGGREGATE BASE | 15 CY | $225 | $50.00 | $70.00 |
| 407E13900 TACK COAT, 702.13 | 452 GAL | $3.00 | $3.00 | $20.00 |
| 407E20000 NON-TRACKING TACK COAT | 2,256 GAL | $3.00 | $3.00 | $10.00 |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 367 LB | $10.00 | $1.00 | $10.00 |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 34 CY | $300 | $225 | $150 |
| 638E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN | 8 EACH | $1,250 | $1,000 | $725 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 593 EACH | $1.00 | $2.00 | $1.00 |
| 642E00100 EDGE LINE, 4", TYPE 1 | 3.08 MILE | $910 | $910 | $1,500 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.91 MILE | $950 | $950 | $5,000 |
| 642E00204 LANE LINE, 6", TYPE 1 | 11.89 MILE | $750 | $750 | $1,500 |
| 642E00300 CENTER LINE, TYPE 1 | 0.32 MILE | $1,200 | $1,200 | $1,500 |
| 642E00400 CHANNELIZING LINE, 8", TYPE 1 | 450 FT | $2.00 | $2.00 | $2.50 |
| 642E00404 CHANNELIZING LINE, 12", TYPE 1 | 84 FT | $2.25 | $2.25 | $5.00 |
| 642E00500 STOP LINE, TYPE 1 | 39 FT | $6.00 | $6.00 | $10.00 |
| 642E00620 CROSSWALK LINE, 12", TYPE 1 | 128 FT | $5.00 | $5.00 | $7.50 |
| 642E00700 TRANSVERSE/DIAGONAL LINE, TYPE 1 | 74 FT | $7.00 | $7.00 | $10.00 |
| 642E01300 LANE ARROW, TYPE 1 | 6 EACH | $70.00 | $70.00 | $100 |
| 642E01400 WORD ON PAVEMENT, 72", TYPE 1 | 3 EACH | $120 | $120 | $150 |
| 642E01500 DOTTED LINE, 4", TYPE 1 | 217 FT | $1.00 | $1.00 | $2.00 |
| 642E01650 BIKE LANE ARROW, TYPE 1 | 8 EACH | $60.00 | $60.00 | $100 |
| 642E50010 PAVEMENT MARKING, MISC.:BIKE LANE WORD ON PAVEMENT | 16 EACH | $60.00 | $60.00 | $300 |
| 690E98400 SPECIAL - INVENTORY EXISTING PAVEMENT MARKINGS | 1 LS | $3,000 | $3,000 | $1,500 |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 2 EACH | $1,400 | $1,400 | $1,900 |
| 614E12460 WORK ZONE MARKING SIGN | 4 EACH | $150 | $150 | $150 |
| 614E12484 WORK ZONE INCREASED PENALTIES SIGN | 34 EACH | $250 | $250 | $250 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 50 CY | $150 | $200 | $100 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 8 SNMT | $1,000 | $1,000 | $1,000 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 0.32 MILE | $1,260 | $1,260 | $1,500 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.32 MILE | $1,180 | $1,180 | $1,500 |
| 614E22100 WORK ZONE EDGE LINE, CLASS I, 4", 642 PAINT | 0.88 MILE | $900 | $900 | $650 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 0.91 MILE | $900 | $900 | $10,000 |
| 614E22350 WORK ZONE EDGE LINE, CLASS III, 4", 642 PAINT | 3.08 MILE | $900 | $900 | $775 |
| 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 642 PAIN | 450 FT | $0.50 | $0.50 | $2.50 |
| 614E23210 WORK ZONE CHANNELIZING LINE, CLASS I, 12", 642 PAI | 84 FT | $0.50 | $0.50 | $5.00 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 450 FT | $0.50 | $0.50 | $2.50 |
| 614E24200 WORK ZONE DOTTED LINE, CLASS I, 4", 642 PAINT | 217 FT | $0.50 | $0.50 | $2.00 |
| 614E24610 WORK ZONE DOTTED LINE, CLASS III, 4", 642 PAINT | 217 FT | $0.50 | $0.50 | $2.00 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 39 FT | $5.00 | $5.00 | $10.00 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 39 FT | $5.00 | $5.00 | $10.00 |
| 614E30200 WORK ZONE ARROW, CLASS I, 642 PAINT | 6 EACH | $60.00 | $60.00 | $100 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 6 EACH | $60.00 | $60.00 | $100 |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 12 SNMT | $625 | $625 | $750 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $100 | $6,000 | $4,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E22101 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 908 CY | $320 | $291k | 16% |
| 253E02001 PAVEMENT REPAIR, AS PER PLAN | 110 CY | $2,400 | $264k | 14% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $195,000 | $195k | 11% |
| 252E01001 FULL DEPTH RIGID PAVEMENT REMOVAL AND FLEXIBLE REP | 750 SY | $250 | $188k | 10% |
| 624E10000 MOBILIZATION | 1 LS | $135,610 | $136k | 7% |
| 442E22101 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 235 CY | $405 | $95k | 5% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 268 CY | $325 | $87k | 5% |
| 252E01001 FULL DEPTH RIGID PAVEMENT REMOVAL AND FLEXIBLE REP | 150 SY | $500 | $75k | 4% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (2.5") | 13,072 SY | $5 | $65k | 4% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 450 HOUR | $100 | $45k | 2% |