VIN-US 50-28.74
VIN County · est $0.7M
Bid dateThursday, March 21—
VIN County · est $0.7M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 33 more items below.
| Item | Quantity | R1Parker Corporation | R2R C Construction Company And Son INC | R3D G M INC | R4Axis Civil Construction LLC | R5Alan Stone CO INC | % of bid |
|---|---|---|---|---|---|---|---|
| 611E95501 10' X 8' CONDUIT, TYPE A, 706.05, AS PER PLAN | 57 FT | $1,469 | $1,350 | $3,100 | $2,200 | $2,200 | 18% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 115 CY | $276 | $285 | $290 | $400 | $364 | 7% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 54 CY | $550 | $750 | $700 | $550 | $594 | 6% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 106 CY | $276 | $385 | $290 | $480 | $378 | 6% |
| 624E10000 MOBILIZATION | 1 LS | $28,750 | $15,000 | $10,000 | $30,000 | $64,600 | 6% |
| 614E11000 MAINTAINING TRAFFIC |
| Item | Quantity | R1Parker Corporation | R2R C Construction Company And Son INC | R3D G M INC | R4Axis Civil Construction LLC | R5Alan Stone CO INC |
|---|---|---|---|---|---|---|
| 202E38000 GUARDRAIL REMOVED | 700 FT | $2.00 | $5.00 | $1.00 | $7.00 | $3.77 |
| 203E10000 EXCAVATION | 420 CY | $20.00 | $10.00 | $27.50 | $29.00 | $33.98 |
| 204E10000 SUBGRADE COMPACTION | 567 SY | $0.50 | $2.00 | $7.00 | $4.00 | $4.62 |
| 606E17360 GUARDRAIL, TYPE MGS, LONG-SPAN | 87.5 FT | $25.28 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1 LS |
| $27,250 |
| $25,000 |
| $32,000 |
| $30,000 |
| $45,000 |
| 6% |
| 613E41300 LOW STRENGTH MORTAR BACKFILL (TYPE 2) | 172 CY | $155 | $250 | $165 | $189 | $170 | 6% |
| 202E11000 STRUCTURE REMOVED | 1 LS | $23,250 | $10,000 | $25,000 | $40,000 | $20,000 | 5% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $23,250 | $1,000 | $35,000 | $24,000 | $55,000 | 5% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $22,950 | $20,000 | $15,000 | $6,000 | $10,000 | 5% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $20,250 | $10,000 | $4,500 | $10,000 | $15,000 | 4% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $19,250 | $1,000 | $18,000 | $25,000 | $20,000 | 4% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $18,250 | $6,500 | $3,000 | $13,500 | $35,000 | 4% |
| 606E15050 GUARDRAIL, TYPE MGS | 612.5 FT | $25.18 | $29.00 | $27.00 | $25.18 | $30.00 | 3% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 22 CY | $650 | $750 | $1,200 | $1,600 | $1,427 | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE | — | $8.00 | $30.00 | $10.00 | $9.00 | $10.00 | 3% |
| 203E20000 EMBANKMENT | 527 CY | $20.00 | $20.00 | $27.50 | $29.00 | $32.20 | 2% |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $8,950 | $5,500 | $1,000 | $5,000 | $15,000 | 2% |
| 615E20001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, AS PER | 117 SY | $75.00 | $125 | $150 | $180 | $98.89 | 2% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 6,915 LB | $1.25 | $3.00 | $2.00 | $2.60 | $2.34 | 2% |
| $30.00 |
| $29.00 |
| $25.28 |
| $26.25 |
| 623E40500 REFERENCE MONUMENT, TYPE A | 1 EACH | $2,000 | $1,000 | $750 | $1,200 | $750 |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 78 CY | $65.00 | $150 | $150 | $130 | $134 |
| 659E10000 SEEDING AND MULCHING | 2,337 SY | $1.00 | $5.00 | $2.50 | $1.50 | $4.27 |
| 659E20000 COMMERCIAL FERTILIZER | 0.22 TON | $2,273 | $1,200 | $1,500 | $1,400 | $979 |
| 659E31000 LIME | 0.49 ACRE | $1,021 | $800 | $300 | $150 | $400 |
| 659E35000 WATER | 7 MGAL | $0.05 | $1.00 | $1.00 | $1.00 | $12.97 |
| 832E30000 EROSION CONTROL | 2,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 36 FT | $10.00 | $50.00 | $35.00 | $25.00 | $50.00 |
| 304E20000 AGGREGATE BASE | 91 CY | $65.00 | $100 | $120 | $150 | $104 |
| 407E20000 NON-TRACKING TACK COAT | 213 GAL | $4.00 | $25.00 | $3.50 | $6.00 | $5.15 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 15 EACH | $20.00 | $50.00 | $1.00 | $32.00 | $24.15 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, (BIDIRECTIONAL) | 10 EACH | $11.00 | $25.00 | $15.00 | $40.00 | $13.33 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 2 EACH | $200 | $250 | $75.00 | $50.00 | $91.01 |
| 630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT | 2 EACH | $200 | $250 | $75.00 | $50.00 | $128 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.25 MILE | $3,750 | $4,000 | $4,000 | $3,750 | $6,519 |
| 642E00300 CENTER LINE, TYPE 1 | 0.13 MILE | $6,750 | $7,000 | $7,500 | $6,750 | $11,359 |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $1,500 | $2,500 | $2,250 | $1,500 | $2,450 |
| 614E12740 WORK ZONE LIGHTING SYSTEM | 1 EACH | $200 | $15,000 | $2,500 | $1,200 | $10,449 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, (BIDIRECTIONAL) | 27 EACH | $10.00 | $35.00 | $32.00 | $22.00 | $22.29 |
| 614E13360 OBJECT MARKER, TWO WAY | 27 EACH | $10.00 | $38.00 | $36.00 | $36.00 | $27.20 |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" | 0.36 MILE | $5,000 | $4,500 | $5,000 | $3,950 | $7,170 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 24 FT | $10.00 | $50.00 | $20.00 | $14.00 | $20.00 |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 600 FT | $10.00 | $20.00 | $25.00 | $32.00 | $21.00 |
| 202E23500 WEARING COURSE REMOVED | 37 SY | $5.00 | $30.00 | $20.00 | $25.00 | $22.00 |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 2 CY | $650 | $750 | $1,300 | $1,300 | $2,218 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 76 SY | $12.00 | $50.00 | $20.00 | $34.00 | $15.24 |
| 512E33000 TYPE 2 WATERPROOFING | 211 SY | $14.00 | $45.00 | $22.50 | $26.00 | $33.35 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 55 SF | $5.00 | $50.00 | $12.00 | $8.00 | $11.36 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 23 CY | $53.00 | $150 | $135 | $150 | $136 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E95501 10' X 8' CONDUIT, TYPE A, 706.05, AS PER PLAN | 57 FT | $1,469 | $84k | 16% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 115 CY | $276 | $32k | 6% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 54 CY | $550 | $30k | 6% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 106 CY | $276 | $29k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $28,750 | $29k | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $27,250 | $27k | 5% |
| 613E41300 LOW STRENGTH MORTAR BACKFILL (TYPE 2) | 172 CY | $155 | $27k | 5% |
| 202E11000 STRUCTURE REMOVED | 1 LS | $23,250 | $23k | 4% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $23,250 | $23k | 4% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $22,950 | $23k | 4% |