D04-SP FY2024 (East)
D04 County · est $1.5M
Bid dateThursday, April 18—
D04 County · est $1.5M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 11 more items below.
| Item | Quantity | R1Karvo Companies INC | R2Barbicas Construction Company INC | R3Phillips Paving LLC | R4Shelly Company | % of bid |
|---|---|---|---|---|---|---|
| 424E14100 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B | 449 (1308 CY | $288 | $325 | $350 | $390 | 32% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) (7.5") | 2,350 SY | $75.00 | $80.00 | $100 | $185 | 15% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $144,554 | $250,000 | $270,000 | $177,000 | 12% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) (T=1.5") | 2,500 SY | $48.00 | $66.00 | $34.00 | $70.00 | 10% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T=1.0") | 47,084 SY | $2.25 | $3.50 | $5.20 | $5.25 | 9% |
| 624E15001 MOBILIZATION, AS PER PLAN | 6 EACH | $15,000 | $30,000 | $20,000 |
| Item | Quantity | R1Karvo Companies INC | R2Barbicas Construction Company INC | R3Phillips Paving LLC | R4Shelly Company |
|---|---|---|---|---|---|
| 690E91000 SPECIAL - AS-BUILT CONSTRUCTION PLANS | 1 LS | $500 | $1,000 | $1,000 | $5,000 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 477 EACH | $1.00 | $6.00 | $2.00 | $10.00 |
| 642E00300 CENTER LINE, TYPE 1 | 0.5 MILE | $1,300 | $13,000 | $1,300 | $1,300 |
| 642E00404 CHANNELIZING LINE, 12", TYPE 1 | 100 FT | $2.00 | $2.00 | $2.00 | $2.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $22,500 |
| 8% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) (T=3") | 650 SY | $62.00 | $59.00 | $75.00 | $80.00 | 3% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 300 HOUR | $100 | $80.00 | $100 | $100 | 3% |
| 621E00100 RPM | 533 EACH | $37.00 | $37.00 | $37.00 | $37.00 | 2% |
| 646E10010 EDGE LINE, 6" | 5.96 MILE | $3,000 | $3,000 | $3,000 | $3,000 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $15,000 | $40,000 | $25,000 | $5,000 | 1% |
| 407E20000 NON-TRACKING TACK COAT | 4,238 GAL | $2.70 | $3.25 | $2.00 | $2.50 | 1% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 8 SNMT | $1,000 | $900 | $1,250 | $1,000 | 1% |
| 642E00104 EDGE LINE, 6", TYPE 1 | 5 MILE | $980 | $980 | $980 | $980 | 0% |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 5 MILE | $900 | $900 | $900 | $900 | 0% |
| 642E00204 LANE LINE, 6", TYPE 1 | 2 MILE | $830 | $830 | $830 | $830 | 0% |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 2 MILE | $650 | $650 | $650 | $650 | 0% |
| 646E10400 STOP LINE , 24" | 156 FT | $7.00 | $7.00 | $7.00 | $7.00 | 0% |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 0% |
| 614E12460 WORK ZONE MARKING SIGN | 10 EACH | $85.00 | $70.00 | $100 | $85.16 | 0% |
| 642E00500 STOP LINE, TYPE 1 | 50 FT | $5.00 | $5.00 | $5.00 | $5.00 |
| 646E10300 CHANNELIZING LINE, 8" | 100 FT | $1.75 | $1.75 | $1.75 | $1.75 |
| 646E10520 CROSSWALK LINE, 24" | 30 FT | $7.00 | $7.00 | $7.00 | $7.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $50.00 | $150 | $270 | $120 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.5 MILE | $990 | $990 | $990 | $990 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 100 FT | $2.00 | $2.00 | $2.00 | $2.00 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 50 FT | $5.00 | $5.00 | $5.00 | $5.00 |
| Item |
|---|
| Qty |
|---|
| Unit price |
|---|
| Extended |
|---|
| % |
|---|
| 424E14100 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B | 449 (1308 CY | $288 | $377k | 32% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) (7.5") | 2,350 SY | $75 | $176k | 15% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $144,554 | $145k | 12% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) (T=1.5") | 2,500 SY | $48 | $120k | 10% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T=1.0") | 47,084 SY | $2.25 | $106k | 9% |
| 624E15001 MOBILIZATION, AS PER PLAN | 6 EACH | $15,000 | $90k | 8% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) (T=3") | 650 SY | $62 | $40k | 3% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 300 HOUR | $100 | $30k | 3% |
| 621E00100 RPM | 533 EACH | $37 | $20k | 2% |
| 646E10010 EDGE LINE, 6" | 5.96 MILE | $3,000 | $18k | 2% |