CUY-Eagle Avenue Bridge
CUY County · est $3.0M
Bid dateThursday, May 9—
CUY County · est $3.0M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 14 more items below.
| Item | Quantity | R1Baumann Enterprises INC | R2Ruhlin Company | R3Great Lakes Construction CO | % of bid |
|---|---|---|---|---|---|
| 513E95020 STRUCTURAL STEEL, MISC.:EMOVAL AND RE-ERECTION OF | 1 LS | $1,495,434 | $25,000 | $38,000 | 61% |
| 624E10000 MOBILIZATION | 1 LS | $500,000 | $206,500 | $265,000 | 20% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $140,000 | $18,441 | $42,791 | 6% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $80,000 | $3,576,660 | $4,657,255 | 3% |
| 690E71000 SPECIAL - ASBESTOS ABATEMENT(WORK INVOLVING ASBEST | 1 LS | $45,000 | $42,000 | $55,545 | 2% |
| 607E23001 FENCE, TYPE CLT, AS PER PLAN | 899 FT | $35.00 | $20.87 | $28.00 | 1% |
| 514E00051 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL, | 708 SF |
| Item | Quantity | R1Baumann Enterprises INC | R2Ruhlin Company | R3Great Lakes Construction CO |
|---|---|---|---|---|
| 201E21800 TREE REMOVED, 18" | 1 EACH | $1,500 | $665 | $625 |
| 202E23000 PAVEMENT REMOVED | 118 SY | $9.50 | $70.00 | $32.00 |
| 202E98000 REMOVAL MISC.:REMOVE AND DISPOSE OF PORTABLE CONCR | 1 LS | $20.00 | $4,000 | $900 |
| 607E98000 FENCE, MISC.:4'-0", COATED VANDAL PROTECTION FENCE | 82 FT | $40.00 | $146 | $76.65 |
| 608E98000 WALKWAY, MISC.:TEMPORARY WALK | 33 SF | $11.50 | $350 | $103 |
| 614E27020 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $40.00 |
| $61.00 |
| $90.00 |
| 1% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $15,000 | $63,650 | $8,000 | 1% |
| 108E30000 CPM PROGRESS SCHEDULE SHORT DURATION PROJECTS | 1 LS | $15,000 | $1.42 | $1,000 | 1% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $15,000 | $14,440 | $15,000 | 1% |
| 619E16000 FIELD OFFICE, TYPE A | 12 MNTH | $1,250 | $2,230 | $4,130 | 1% |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 708 SF | $20.00 | $25.00 | $33.00 | 1% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 708 SF | $20.00 | $25.00 | $16.00 | 1% |
| 514E00067 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, AS P | 708 SF | $20.00 | $25.00 | $14.00 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $8,500 | $40,250 | $3,395 | 0% |
| 201E24800 TREE REMOVED, 48" | 2 EACH | $4,000 | $1,725 | $1,620 | 0% |
| 201E23000 TREE REMOVED, 30" | 2 EACH | $3,000 | $1,090 | $1,025 | 0% |
| 514E10000 FINAL INSPECTION REPAIR | 1 EACH | $5,000 | $1.00 | $500 | 0% |
| 608E10000 4" CONCRETE WALK | 340 SF | $12.50 | $18.50 | $23.00 | 0% |
| 659E00100 SOIL ANALYSIS TEST | 1 EACH | $4,000 | $300 | $195 | 0% |
| 60 FT |
| $40.00 |
| $146 |
| $32.00 |
| 659E00300 TOPSOIL | 12 CY | $40.00 | $400 | $70.85 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 104 SY | $1.80 | $25.00 | $2.64 |
| 659E20000 COMMERCIAL FERTILIZER | 0.01 TON | $2,000 | $12,000 | $1,560 |
| 659E31000 LIME | 0.02 ACRE | $2,000 | $100 | $1,233 |
| 659E35000 WATER | 0.56 MGAL | $2,000 | $1.00 | $155 |
| 680E05000 SPECIAL - SITE RESTORATION | 1 LS | $2,500 | $20,050 | $55,993 |
| 690E72000 SPECIAL - ASBESTOS NOTIFICATION | 1 LS | $500 | $500 | $600 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 513E95020 STRUCTURAL STEEL, MISC.:EMOVAL AND RE-ERECTION OF | 1 LS | $1,495,434 | $1.50M | 60% |
| 624E10000 MOBILIZATION | 1 LS | $500,000 | $500k | 20% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $140,000 | $140k | 6% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $80,000 | $80k | 3% |
| 690E71000 SPECIAL - ASBESTOS ABATEMENT(WORK INVOLVING ASBEST | 1 LS | $45,000 | $45k | 2% |
| 607E23001 FENCE, TYPE CLT, AS PER PLAN | 899 FT | $35 | $31k | 1% |
| 514E00051 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL, | 708 SF | $40 | $28k | 1% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $15,000 | $15k | 1% |
| 108E30000 CPM PROGRESS SCHEDULE SHORT DURATION PROJECTS | 1 LS | $15,000 | $15k | 1% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $15,000 | $15k | 1% |