MOT-Vandalia Bike-way Connector
MOT County · est $3.9M
Bid dateThursday, May 9—
MOT County · est $3.9M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 172 more items below.
| Item | Quantity | R1Brumbaugh Construction INC | R2R B Jergens Contractors INC | R3Eagle Bridge CO | R4Sunesis Construction CO | R5John R Jurgensen Company | % of bid |
|---|---|---|---|---|---|---|---|
| 530E00200 SPECIAL - STRUCTURES, MISC: PREFABRICATED BRIDGE | 1 LS | $850,000 | $885,832 | $900,000 | $938,712 | $872,946 | 28% |
| 840E20001 MECHANICALLY STABILIZED EARTH WALL, AS PER PLAN | 9,880 SF | $50.00 | $48.48 | $55.00 | $49.78 | $57.99 | 16% |
| 840E23000 SELECT GRANULAR BACKFILL | 6,213 CY | $57.00 | $57.27 | $72.00 | $59.61 | $86.37 | 11% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $200,000 | $112,295 | $200,000 | $359,005 | $271,324 | 6% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 588 CY | $260 | $296 | $255 | $272 | $305 | 5% |
| 203E20000 |
| Item | Quantity | R1Brumbaugh Construction INC | R2R B Jergens Contractors INC | R3Eagle Bridge CO | R4Sunesis Construction CO | R5John R Jurgensen Company |
|---|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 61 SY | $30.00 | $75.67 | $25.00 | $36.56 | $20.91 |
| 202E30000 WALK REMOVED | 171 SF | $10.00 | $1.64 | $6.00 | $3.73 | $4.98 |
| 202E32000 CURB REMOVED | 17 FT | $24.00 | $8.47 | $20.00 | $46.23 | $48.37 |
| 202E32500 CURB AND GUTTER REMOVED | 240 FT | $10.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 5,040 CY |
| $20.00 |
| $35.45 |
| $15.00 |
| $24.21 |
| $11.13 |
| 3% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $102,988 | $167,000 | $342,820 | $200,000 | 3% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 9 EACH | $10,000 | $9,476 | $8,815 | $9,506 | $9,450 | 3% |
| 840E26000 CONCRETE COPING | 515 FT | $160 | $92.83 | $200 | $177 | $380 | 3% |
| 204E30020 GRANULAR MATERIAL, TYPE C | 1,525 CY | $54.00 | $75.73 | $60.00 | $101 | $65.07 | 3% |
| 632E64011 SIGNAL SUPPORT FOUNDATION, AS PER PLAN | 8 EACH | $9,400 | $9,202 | $8,560 | $5,673 | $5,640 | 2% |
| 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING | 90 CY | $825 | $1,156 | $1,100 | $870 | $1,160 | 2% |
| 840E21000 WALL EXCAVATION | 3,877 CY | $18.00 | $9.52 | $12.00 | $19.52 | $23.28 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $60,000 | $69,145 | $110,000 | $55,326 | $73,056 | 2% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (227 CY | $260 | $296 | $255 | $288 | $290 | 2% |
| 632E79141 COMBINATION SIGNAL SUPPORT, TYPE TC-81.22, DESIGN | 2 EACH | $26,000 | $27,799 | $25,860 | $26,406 | $26,250 | 2% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $50,000 | $39,329 | $50,000 | $35,367 | $35,132 | 2% |
| 304E20000 AGGREGATE BASE | 905 CY | $55.00 | $85.45 | $90.00 | $118 | $92.49 | 2% |
| 607E98000 FENCE, MISC.:WOOD FENCE | 793 FT | $58.00 | $55.46 | $52.50 | $50.30 | $43.00 | 1% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $40,000 | $62,240 | $20,000 | $23,222 | $70,365 | 1% |
| $3.08 |
| $15.00 |
| $12.21 |
| $10.88 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 26 FT | $20.00 | $21.01 | $10.00 | $13.44 | $20.07 |
| 202E75000 FENCE REMOVED | 455 FT | $6.00 | $8.23 | $6.00 | $8.30 | $1.74 |
| 203E10000 EXCAVATION | 992 CY | $24.00 | $37.84 | $25.00 | $48.27 | $20.15 |
| 204E13000 EXCAVATION OF SUBGRADE | 1,525 CY | $24.00 | $36.32 | $15.00 | $41.81 | $41.35 |
| 204E45000 PROOF ROLLING | 8 HOUR | $130 | $244 | $150 | $184 | $230 |
| 204E50000 GEOTEXTILE FABRIC | 4,576 SY | $2.25 | $3.13 | $1.50 | $3.10 | $1.49 |
| 607E23000 FENCE, TYPE CLT | 436 FT | $30.00 | $30.11 | $28.50 | $26.75 | $26.50 |
| 608E10000 4" CONCRETE WALK | 668 SF | $16.00 | $9.59 | $15.00 | $14.86 | $11.88 |
| 608E52000 CURB RAMP | 516 SF | $26.00 | $15.40 | $22.00 | $20.66 | $34.35 |
| 623E40520 RIGHT-OF-WAY MONUMENT, TYPE B | 22 EACH | $300 | $1,316 | $350 | $374 | $550 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $150 | $84.51 | $250 | $151 | $250 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 7,236 SY | $2.50 | $1.90 | $2.00 | $8.40 | $1.16 |
| 659E14000 REPAIR SEEDING AND MULCHING | 365 SY | $2.00 | $1.90 | $2.50 | $1.22 | $1.16 |
| 659E15000 INTER-SEEDING | 365 SY | $2.00 | $1.06 | $2.50 | $0.84 | $0.80 |
| 659E20000 COMMERCIAL FERTILIZER | 1 TON | $900 | $898 | $1,250 | $974 | $925 |
| 659E31000 LIME | 1.5 ACRE | $5.00 | $36.97 | $10.00 | $105 | $100 |
| 659E35000 WATER | 39 MGAL | $5.00 | $1.06 | $10.00 | $1.05 | $1.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $2,200 | $1,928 | $2,200 | $1,509 | $1,825 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $16,000 | $11,156 | $25,000 | $14,083 | $5,530 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $16,000 | $14,943 | $17,000 | $15,089 | $14,145 |
| 832E30000 EROSION CONTROL | 25,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 1 CY | $2,500 | $4,396 | $5,500 | $2,134 | $1,722 |
| 611E04900 12" CONDUIT, TYPE D | 206 FT | $70.00 | $94.21 | $90.00 | $128 | $72.37 |
| 611E05700 15" CONDUIT, TYPE A | 6 FT | $95.00 | $199 | $365 | $307 | $365 |
| 611E13600 30" CONDUIT, TYPE C | 8 FT | $140 | $225 | $340 | $412 | $395 |
| 611E98470 CATCH BASIN, NO. 2-2B | 2 EACH | $1,500 | $1,975 | $2,250 | $1,762 | $2,008 |
| 611E98510 CATCH BASIN, NO. 2-3 | 1 EACH | $3,000 | $3,978 | $4,000 | $5,620 | $5,315 |
| 611E98644 CATCH BASIN GRATE | 2 EACH | $550 | $717 | $200 | $317 | $315 |
| 611E99660 MANHOLE RECONSTRUCTED TO GRADE | 2 EACH | $1,500 | $1,045 | $1,250 | $704 | $1,139 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, "1.25" | 12,256 SY | $2.50 | $2.84 | $2.45 | $2.61 | $3.35 |
| 407E10000 TACK COAT | 860 GAL | $3.00 | $3.48 | $3.00 | $3.19 | $5.00 |
| 441E70500 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449) | — | $330 | $383 | $330 | $351 | $1,250 |
| 441E70700 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (6 CY | $330 | $383 | $330 | $351 | $1,250 |
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 105 SY | $120 | $128 | $90.00 | $79.47 | $86.70 |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 131 SY | $145 | $85.91 | $105 | $94.56 | $103 |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2, W=21" | 153 FT | $35.00 | $49.40 | $50.00 | $49.05 | $48.06 |
| 609E28000 CURB, TYPE 7 | 215 FT | $55.00 | $35.54 | $45.00 | $48.70 | $37.25 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 1 EACH | $600 | $326 | $200 | $202 | $646 |
| 620E60000 DELINEATOR, POST SURFACE MOUNTED, TYPE C (WHITE) | 233 EACH | $75.00 | $92.27 | $73.50 | $87.86 | $85.00 |
| 626E00102 BARRIER REFLECTOR, TYPE 1, BIDIRECTIONAL | 21 EACH | $9.00 | $9.02 | $15.00 | $8.59 | $15.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 784 FT | $15.00 | $20.40 | $15.50 | $19.42 | $15.50 |
| 630E08600 SIGN POST REFLECTOR | 18 EACH | $45.00 | $78.22 | $46.00 | $74.48 | $45.00 |
| 630E72541 OVERHEAD SIGN SUPPORT, TYPE TC-16.22, DESIGN 12, A | 1 EACH | $21,000 | $22,755 | $21,450 | $22,634 | $21,925 |
| 630E79101 SIGN HANGER ASSEMBLY, MAST ARM, AS PER PLAN | 16 EACH | $350 | $561 | $340 | $534 | $570 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 6 EACH | $95.00 | $161 | $95.00 | $153 | $185 |
| 630E80100 SIGN, FLAT SHEET | 472.65 SF | $18.00 | $23.79 | $18.25 | $22.65 | $20.00 |
| 630E81100 SIGN ERECTED, FLAT SHEET | 6 SF | $19.00 | $98.55 | $19.25 | $93.84 | $15.00 |
| 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION | 1 EACH | $8,600 | $9,508 | $8,560 | $4,552 | $8,435 |
| 630E85000 REMOVAL OF GROUND MOUNTED SIGN AND STORAGE | 7 EACH | $15.00 | $24.63 | $15.00 | $23.45 | $35.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 6 EACH | $65.00 | $89.79 | $65.00 | $85.50 | $65.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 11 EACH | $25.00 | $32.83 | $25.00 | $31.26 | $15.00 |
| 630E87100 REMOVAL OF OVERHEAD MOUNTED SIGN AND REERECTION | 4 EACH | $225 | $308 | $225 | $293 | $85.00 |
| 642E30001 REMOVAL OF PAVEMENT MARKING, AS PER PLAN | 21,033 FT | $1.00 | $0.69 | $0.65 | $1.00 | $0.65 |
| 644E00100 EDGE LINE, 4" (WHITE) | 0.38 MILE | $2,500 | $4,094 | $3,875 | $2,515 | $3,875 |
| 644E00104 EDGE LINE, 6" (WHITE) | 1.46 MILE | $3,500 | $5,721 | $5,415 | $3,521 | $5,415 |
| 644E00204 LANE LINE, 6" | 1.32 MILE | $2,500 | $2,641 | $2,500 | $2,515 | $2,500 |
| 644E00300 CENTER LINE (BROKEN SOLID) | 1.02 MILE | $4,500 | $4,923 | $4,660 | $4,527 | $4,660 |
| 644E00300 CENTER LINE (DOUBLE SOLID) | 0.68 MILE | $6,000 | $7,363 | $6,970 | $6,036 | $6,970 |
| 644E00301 CENTER LINE, AS PER PLAN | 0.44 MILE | $7,700 | $4,094 | $3,875 | $7,545 | $3,875 |
| 644E00404 CHANNELIZING LINE, 12" | 2,351 FT | $1.50 | $1.58 | $1.50 | $1.51 | $1.50 |
| 644E00500 STOP LINE, 24" | 288 FT | $7.00 | $6.87 | $6.50 | $7.04 | $6.50 |
| 644E00501 STOP LINE, AS PER PLAN | 39 FT | $54.00 | $5.81 | $5.50 | $26.67 | $5.50 |
| 644E00620 CROSSWALK LINE, 12" | 1,962 FT | $3.50 | $5.55 | $5.25 | $3.52 | $5.25 |
| 644E00630 CROSSWALK LINE, 24" | 951 FT | $7.00 | $6.60 | $6.25 | $7.04 | $6.25 |
| 644E00700 TRANSVERSE/DIAGONAL LINE (24" WHITE) | 389 FT | $7.00 | $6.34 | $6.00 | $7.04 | $6.00 |
| 644E00720 CHEVRON MARKING (24" WHITE) | 65 FT | $7.00 | $6.34 | $6.00 | $7.04 | $6.00 |
| 644E01110 SCHOOL SYMBOL MARKING, 96" | 1 EACH | $675 | $528 | $500 | $660 | $500 |
| 644E01300 LANE ARROW, 96" | 69 EACH | $135 | $132 | $125 | $136 | $125 |
| 644E01350 LANE REDUCTION ARROW, 96" | 15 EACH | $250 | $370 | $350 | $239 | $350 |
| 644E01500 DOTTED LINE, 4" (WHITE 2' LINE 6' GAP) | 1,833 FT | $1.80 | $1.06 | $1.00 | $1.76 | $1.00 |
| 644E01500 DOTTED LINE, 4" (YELLOW, 2' LINE 6' GAP) | 6,023 FT | $1.80 | $1.06 | $1.00 | $1.76 | $1.00 |
| 644E20800 YIELD LINE, 24" | 17 FT | $75.00 | $7.92 | $7.50 | $75.45 | $7.50 |
| 644E30020 REMOVAL OF PAVEMENT MARKING | 53 EACH | $85.00 | $232 | $220 | $82.49 | $220 |
| 647E18060 STOP LINE, TYPE B90 | 138 FT | $18.00 | $23.98 | $22.70 | $18.01 | $22.70 |
| 647E20910 BIKE LANE SYMBOL MARKING, TYPE B90 | 28 EACH | $575 | $502 | $475 | $553 | $475 |
| 647E20940 SHARED LANE MARKING, TYPE B90 | 23 EACH | $475 | $475 | $450 | $465 | $450 |
| 647E50100 PAVEMENT MARKING, MISC.: BIKE LANE SYMBOL MARKING | 3 EACH | $1,400 | $1,136 | $1,075 | $1,381 | $1,075 |
| 647E50110 PAVEMENT MARKING, MISC.: GREEN COLORED PAVEMENT FO | 1,738 SF | $18.00 | $13.63 | $12.90 | $17.64 | $12.90 |
| 625E00450 CONNECTION, FUSED PULL APART | 10 EACH | $100 | $128 | $120 | $111 | $110 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 10 EACH | $100 | $183 | $170 | $111 | $110 |
| 625E17951 BRACKET ARM, 6', AS PER PLAN | 4 EACH | $650 | $1,231 | $1,145 | $684 | $680 |
| 625E25402 CONDUIT, 2", 725.05 | 159 FT | $14.00 | $13.33 | $12.40 | $4.63 | $4.60 |
| 625E25502 CONDUIT, 3", 725.05 | 57 FT | $25.00 | $19.51 | $18.15 | $7.85 | $7.80 |
| 625E25602 CONDUIT, 4", 725.05 | 30 FT | $35.00 | $22.36 | $20.80 | $10.56 | $10.50 |
| 625E25908 CONDUIT, JACKED OR DRILLED, 725.052, 2" | 108 FT | $35.00 | $51.44 | $47.85 | $60.36 | $60.00 |
| 625E25908 CONDUIT, JACKED OR DRILLED, 725.052, 4" | 445 FT | $60.00 | $59.02 | $54.90 | $71.42 | $71.00 |
| 625E27507 LUMINAIRE, TEARDROP, SOLID STATE (LED), AS PER PLA | 6 EACH | $2,300 | $2,053 | $1,910 | $1,816 | $1,805 |
| 625E29000 TRENCH | 231 FT | $22.00 | $13.06 | $12.15 | $12.57 | $12.50 |
| 625E30700 PULL BOX, 725.08, 18" | 7 EACH | $1,000 | $989 | $920 | $1,127 | $1,120 |
| 625E30706 PULL BOX, 725.08, 24" | 2 EACH | $1,400 | $1,349 | $1,255 | $1,242 | $1,235 |
| 625E31510 PULL BOX REMOVED | 10 EACH | $200 | $369 | $343 | $151 | $150 |
| 625E32000 GROUND ROD | 23 EACH | $300 | $301 | $280 | $473 | $470 |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 17 EACH | $1,400 | $1,236 | $1,150 | $1,157 | $1,150 |
| 632E05065 VEHICULAR SIGNAL HEAD, (LED), 4-SECTION, 12" LENS, | 2 EACH | $1,600 | $1,497 | $1,393 | $1,423 | $1,415 |
| 632E20731 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN, | 14 EACH | $800 | $865 | $805 | $654 | $650 |
| 632E26000 PEDESTRIAN PUSHBUTTON | 18 EACH | $280 | $379 | $353 | $277 | $275 |
| 632E30980 SIGNAL CABLE, 3 CONDUCTOR, NO. 10 AWG | 1,241 FT | $3.00 | $3.82 | $3.55 | $1.96 | $1.95 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 1,842 FT | $3.25 | $3.01 | $2.80 | $2.26 | $2.25 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 2,514 FT | $3.00 | $3.82 | $3.55 | $2.51 | $2.50 |
| 632E64021 PEDESTAL FOUNDATION, AS PER PLAN | 12 EACH | $1,100 | $1,424 | $1,325 | $1,760 | $1,750 |
| 632E64950 TEST HOLE PERFORMED | 8 EACH | $90.00 | $3,338 | $3,105 | $377 | $375 |
| 632E65200 LOOP DETECTOR LEAD-IN CABLE | 2,301 FT | $2.00 | $2.26 | $2.10 | $1.96 | $1.95 |
| 632E68300 POWER CABLE, 3 CONDUCTOR, NO. 6 AWG | 79 FT | $8.00 | $6.18 | $5.75 | $6.79 | $6.75 |
| 632E69800 SERVICE CABLE, 3 CONDUCTOR, NO. 6 AWG | 239 FT | $8.50 | $6.18 | $5.75 | $6.79 | $6.75 |
| 632E70001 POWER SERVICE, AS PER PLAN | 2 EACH | $2,900 | $6,272 | $5,835 | $5,834 | $5,800 |
| 632E70200 CONDUIT RISER, 1" DIAMETER | 1 EACH | $550 | $398 | $370 | $1,021 | $1,015 |
| 632E70400 CONDUIT RISER, 2" DIAMETER | 2 EACH | $650 | $575 | $535 | $1,288 | $1,280 |
| 632E79111 COMBINATION SIGNAL SUPPORT, TYPE TC-81.22, DESIGN | 2 EACH | $15,000 | $19,876 | $18,490 | $15,979 | $15,885 |
| 632E80700 SIGNAL SUPPORT, MISC.: ANCHOR BOLTS | 16 EACH | $46.00 | $355 | $330 | $302 | $300 |
| 632E90001 PEDESTAL, 11', TRANSFORMER BASE, AS PER PLAN | 12 EACH | $850 | $2,231 | $2,075 | $1,207 | $1,200 |
| 632E90101 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, AS PER PLA | 2 EACH | $3,400 | $7,009 | $6,520 | $5,030 | $5,000 |
| 632E90104 REUSE OF TRAFFIC CONTROL ITEM, RADIO AND ANTENNA | 1 EACH | $1,900 | $2,988 | $2,780 | $1,499 | $1,490 |
| 632E90207 REUSE OF SIGNAL SUPPORT, AS PER PLAN | 4 EACH | $2,600 | $3,666 | $3,410 | $2,681 | $2,665 |
| 632E90400 SIGNALIZATION, MISC.: BICYCLE SIGNAL HEAD, (LED), | 4 EACH | $1,300 | $1,043 | $970 | $1,086 | $1,080 |
| 633E67100 CABINET FOUNDATION | 2 EACH | $3,000 | $1,720 | $1,600 | $1,640 | $1,630 |
| 633E67200 CONTROLLER WORK PAD | 2 EACH | $600 | $1,199 | $1,115 | $981 | $975 |
| 633E74001 UNINTERRUPTIBLE POWER SUPPLY (UPS), AS PER PLAN | 2 EACH | $9,000 | $9,476 | $8,815 | $9,390 | $9,335 |
| 633E99000 CONTROLLER ITEM, MISC.: CABINET, TYPE TS1 | 2 EACH | $17,500 | $18,124 | $16,860 | $17,966 | $17,860 |
| 633E99000 CONTROLLER ITEM, MISC.: REUSE OF SPREAD SPECTRUM R | 1 EACH | $900 | $2,988 | $2,780 | $503 | $500 |
| 809E69123 ATC CONTROLLER, AS PER PLAN | 2 EACH | $6,500 | $6,815 | $6,340 | $6,036 | $6,000 |
| 809E69201 EMERGENCY VEHICLE PREEMPTION, AS PER PLAN | 2 EACH | $600 | $1,376 | $1,280 | $2,263 | $2,250 |
| 809E69210 PREEMPT RECEIVING UNIT | 4 EACH | $1,300 | $1,059 | $985 | $1,132 | $1,125 |
| 809E69211 PREEMPT RECEIVING UNIT, AS PER PLAN | 2 EACH | $450 | $231 | $215 | $251 | $250 |
| 809E69220 PREEMPT DETECTOR CABLE | 621 FT | $3.00 | $2.74 | $2.55 | $1.96 | $1.95 |
| 809E69230 PREEMPT PHASE SELECTOR | 1 EACH | $4,500 | $6,418 | $5,970 | $4,713 | $4,685 |
| 809E69231 PREEMPT PHASE SELECTOR, AS PER PLAN | 1 EACH | $125 | $1,924 | $1,790 | $251 | $250 |
| 809E69240 PREEMPT CONFIRMATION LIGHT | 6 EACH | $800 | $586 | $545 | $956 | $950 |
| 828E00100 LED BLANKOUT SIGN, R3-1 | 2 EACH | $3,500 | $4,214 | $3,920 | $3,672 | $3,625 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 50 HOUR | $85.00 | $102 | $115 | $95.56 | $91.69 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 3 SNMT | $1,300 | $1,217 | $1,200 | $956 | $945 |
| 616E10000 WATER | 26 MGAL | $5.00 | $139 | $20.00 | $6.04 | $110 |
| 614E12420 DETOUR SIGNING | 1 LS | $6,000 | $5,074 | $5,000 | $6,732 | $4,000 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 941 SY | $22.00 | $18.33 | $24.50 | $24.65 | $24.00 |
| 518E62100 STRUCTURE DRAINAGE, MISC.: 12" NON-PERFORATED PLAS | 50 FT | $20.00 | $58.22 | $50.00 | $55.55 | $89.62 |
| 518E62100 STRUCTURE DRAINAGE, MISC.: 12" PERFORATED PLASTIC | 525 FT | $20.00 | $26.04 | $35.00 | $54.72 | $32.39 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 10 SY | $225 | $59.37 | $100 | $143 | $246 |
| 605E31101 AGGREGATE DRAINS, AS PER PLAN | 525 FT | $40.00 | $15.56 | $45.00 | $60.25 | $47.85 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 5 EACH | $200 | $498 | $475 | $328 | $557 |
| 840E22000 FOUNDATION PREPARATION | 417 SY | $20.00 | $32.46 | $35.00 | $57.74 | $28.60 |
| 840E22001 FOUNDATION PREPARATION, AS PER PLAN | 652 SY | $27.00 | $32.46 | $80.00 | $90.76 | $85.63 |
| 840E23050 NATURAL SOIL | 735 CY | $22.00 | $14.89 | $10.00 | $25.85 | $57.69 |
| 840E25010 6" DRAINAGE PIPE, PERFORATED | 526 FT | $12.00 | $14.13 | $10.00 | $6.12 | $12.23 |
| 840E25020 6" DRAINAGE PIPE, NON-PERFORATED | 36 FT | $12.00 | $21.62 | $10.00 | $22.42 | $42.39 |
| 840E26050 AESTHETIC SURFACE TREATMENT | 9,108 SF | $2.50 | $3.32 | $3.50 | $0.01 | $4.13 |
| 840E27000 ON-SITE ASSISTANCE | 5 DAY | $300 | $387 | $500 | $1.34 | $978 |
| 840E28000 SGB INSPECTION AND COMPACTION TESTING | 1 LS | $20,000 | $17,509 | $30,000 | $16,672 | $26,928 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $6,000 | $5,048 | $20,000 | $6,967 | $12,383 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $13,000 | $12,676 | $20,000 | $19,455 | $48,956 |
| 507E00500 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, DRIVE | 720 FT | $5.00 | $17.48 | $6.00 | $33.90 | $65.98 |
| 507E00550 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 780 FT | $50.00 | $42.34 | $70.00 | $38.30 | $33.51 |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 10,391 LB | $1.00 | $2.13 | $1.60 | $1.80 | $1.70 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 69 SY | $35.00 | $29.49 | $28.00 | $28.17 | $35.00 |
| 516E10501 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC C | 28 FT | $900 | $989 | $600 | $1,786 | $578 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 11 SF | $4.00 | $6.20 | $10.00 | $8.82 | $22.90 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 42 CY | $90.00 | $104 | $125 | $108 | $152 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 54 FT | $12.00 | $9.71 | $20.00 | $4.62 | $7.54 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 35 FT | $12.00 | $15.42 | $16.00 | $9.60 | $60.62 |
| 523E20000 DYNAMIC LOAD TESTING | 1 EACH | $4,000 | $3,803 | $4,500 | $5,037 | $4,886 |
| 526E10000 REINFORCED CONCRETE APPROACH SLABS (T=12") | 34 SY | $400 | $417 | $525 | $461 | $691 |
| 601E20010 CRUSHED AGGREGATE SLOPE PROTECTION | 10 CY | $90.00 | $127 | $125 | $99.43 | $213 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 2 SY | $225 | $59.37 | $100 | $329 | $246 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 1 EACH | $200 | $498 | $350 | $328 | $557 |
| 625E33000 STRUCTURE GROUNDING SYSTEM | 1 EACH | $15,000 | $11,515 | $10,900 | $3,521 | $3,500 |
| 530E14000 SPECIAL - STRUCTURAL SURVEY AND MONITORING OF VIBR | 1 LS | $12,000 | $21,023 | $11,000 | $3,018 | $19,900 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $5,000 | $59,370 | $15,000 | $6,720 | $5,000 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $24,000 | $13,417 | $70,000 | $0.01 | $11,949 |
| 108E10000 CPM PROGRESS SCHEDULE | 1 LS | $6,000 | $3,982 | $10,000 | $6,287 | $6,941 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $26,678 | $24,192 | $25,000 | $23,036 | $12,409 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 530E00200 SPECIAL - STRUCTURES, MISC: PREFABRICATED BRIDGE | 1 LS | $850,000 | $850k | 20% |
| 840E20001 MECHANICALLY STABILIZED EARTH WALL, AS PER PLAN | 9,880 SF | $50 | $494k | 11% |
| 840E23000 SELECT GRANULAR BACKFILL | 6,213 CY | $57 | $354k | 8% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $200,000 | $200k | 5% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 588 CY | $260 | $153k | 4% |
| 203E20000 EMBANKMENT | 5,040 CY | $20 | $101k | 2% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 2% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 9 EACH | $10,000 | $90k | 2% |
| 840E26000 CONCRETE COPING | 515 FT | $160 | $82k | 2% |
| 204E30020 GRANULAR MATERIAL, TYPE C | 1,525 CY | $54 | $82k | 2% |