ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 42 more items below.
| Item | Quantity | R1Panther Industrial Painting LLC | R2Apbn INC | R3Kmx Painting INC | R4Elite Contractors INC | R5Corrosion Resistance LTD | R6360 Construction Company INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 45,917 SF | $10.00 | $10.00 | $10.00 | $12.00 | $14.55 | $14.00 | 20% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 22,913 SF | $14.00 | $12.00 | $15.00 | $12.00 | $10.90 | $15.00 | 14% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 12,237 SF | $15.00 | $10.00 |
| Item | Quantity | R1Panther Industrial Painting LLC | R2Apbn INC | R3Kmx Painting INC | R4Elite Contractors INC | R5Corrosion Resistance LTD | R6360 Construction Company INC |
|---|---|---|---|---|---|---|---|
| 202E38000 GUARDRAIL REMOVED | 100 FT | $10.00 | $3.60 | $5.00 | $4.00 | $4.00 | $3.60 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 1 EACH | $400 | $185 | $200 | $225 | $225 | $185 |
| 606E15050 GUARDRAIL, TYPE MGS | 12.5 FT | $150 | $93.60 | $100 | $98.80 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $15.00 |
| $10.00 |
| $13.45 |
| $19.00 |
| 8% |
| 624E10000 MOBILIZATION | 1 LS | $150,000 | $180,509 | $130,000 | $100,000 | $80,000 | $90,000 | 7% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 7,780 SF | $17.00 | $10.00 | $15.00 | $15.00 | $16.60 | $23.00 | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $130,000 | $200,000 | $180,000 | $67,520 | $185,000 | $150,000 | 6% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 10,500 SF | $12.00 | $14.00 | $16.00 | $10.00 | $13.25 | $19.00 | 6% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 8,289 SF | $15.00 | $10.00 | $20.00 | $12.00 | $17.25 | $19.00 | 6% |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 45,917 SF | $2.00 | $2.00 | $2.00 | $4.00 | $1.85 | $2.00 | 4% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 45,917 SF | $2.00 | $2.00 | $2.00 | $4.00 | $2.25 | $2.00 | 4% |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 45,917 SF | $2.00 | $2.00 | $2.00 | $4.00 | $3.00 | $1.50 | 4% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $50,000 | $28,000 | $40,000 | $50,000 | $25,000 | $40,000 | 2% |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 22,913 SF | $2.00 | $2.00 | $2.00 | $3.00 | $3.00 | $3.00 | 2% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 22,913 SF | $2.00 | $2.00 | $2.00 | $3.00 | $4.50 | $2.00 | 2% |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 22,913 SF | $2.00 | $2.00 | $2.00 | $3.00 | $4.50 | $2.00 | 2% |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $45,000 | $35,000 | $45,000 | $39,570 | $39,570 | $39,570 | 2% |
| 516E46700 RESET BEARING | 35 EACH | $1,200 | $806 | $1,400 | $870 | $1,330 | $1,870 | 2% |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $30,000 | $5,000 | $10,000 | $20,000 | $5,000 | $5,000 | 1% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 440 FT | $60.00 | $20.00 | $75.00 | $72.25 | $72.25 | $45.00 | 1% |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 12,237 SF | $2.00 | $4.00 | $5.00 | $3.00 | $2.00 | $4.00 | 1% |
| $98.80 |
| $93.60 |
| 606E26151 ANCHOR ASSEMBLY, MGS TYPE E, AS PER PLAN(MASH 2016 | 1 EACH | $5,000 | $4,840 | $5,000 | $5,220 | $5,220 | $4,840 |
| 607E35000 FENCE REMOVED AND REBUILT | 50 FT | $100 | $86.50 | $90.00 | $92.50 | $92.50 | $86.50 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 2 EACH | $50.00 | $20.00 | $50.00 | $15.00 | $45.00 | $20.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.5 MILE | $6,350 | $900 | $7,000 | $6,350 | $6,350 | $3,500 |
| 642E00300 CENTER LINE, TYPE 1 | 0.25 MILE | $8,465 | $900 | $9,000 | $8,465 | $8,465 | $4,600 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 200 HOUR | $100 | $115 | $50.00 | $60.00 | $85.00 | $90.00 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,342 | $1,000 | $2,500 | $2,342 | $2,342 | $2,900 |
| 614E13310 BARRIER REFLECTOR, TYPE 1(BIDIRECTIONAL) | 9 EACH | $14.26 | $15.00 | $20.00 | $14.26 | $14.26 | $15.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 9 EACH | $22.36 | $23.00 | $30.00 | $22.36 | $22.36 | $25.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 20 SNMT | $100 | $1,000 | $1,100 | $1,079 | $1,079 | $800 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.25 MILE | $5,490 | $900 | $6,000 | $5,490 | $5,490 | $3,900 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 0.5 MILE | $4,255 | $900 | $5,000 | $4,255 | $4,255 | $3,300 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 66 MNHR | $200 | $100 | $250 | $150 | $175 | $125 |
| 514E10000 FINAL INSPECTION REPAIR | 21 EACH | $300 | $100 | $350 | $250 | $320 | $150 |
| 516E46200 BEARING DEVICE, ROCKER | 1 EACH | $5,000 | $5,007 | $8,000 | $870 | $5,620 | $5,620 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 22 MNHR | $200 | $100 | $250 | $150 | $175 | $125 |
| 514E10000 FINAL INSPECTION REPAIR | 6 EACH | $300 | $100 | $350 | $250 | $320 | $150 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 10,500 SF | $2.00 | $5.00 | $5.00 | $3.00 | $2.15 | $10.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 10,500 SF | $2.00 | $5.00 | $2.00 | $3.00 | $3.15 | $5.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 10,500 SF | $2.00 | $5.00 | $2.00 | $3.00 | $3.15 | $5.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 5 MNHR | $300 | $100 | $250 | $150 | $175 | $125 |
| 514E10000 FINAL INSPECTION REPAIR | 4 EACH | $300 | $100 | $350 | $250 | $320 | $150 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 8,289 SF | $2.00 | $4.00 | $5.00 | $4.00 | $4.00 | $10.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 8,289 SF | $2.00 | $4.00 | $5.00 | $4.00 | $6.75 | $4.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 8,289 SF | $2.00 | $4.00 | $5.00 | $4.00 | $6.75 | $2.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 15 MNHR | $300 | $100 | $250 | $150 | $175 | $125 |
| 514E10000 FINAL INSPECTION REPAIR | 5 EACH | $300 | $100 | $350 | $250 | $320 | $150 |
| 518E12900 SCUPPER, LENGTHENING | 8 EACH | $1,500 | $1,575 | $2,000 | $1,160 | $1,535 | $1,660 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 12,237 SF | $2.00 | $4.00 | $2.00 | $3.00 | $3.85 | $2.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 12,237 SF | $2.00 | $4.00 | $1.00 | $3.00 | $3.85 | $2.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 18 MNHR | $300 | $100 | $250 | $150 | $175 | $125 |
| 514E10000 FINAL INSPECTION REPAIR | 6 EACH | $300 | $100 | $350 | $250 | $320 | $150 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 7,780 SF | $2.00 | $4.00 | $3.00 | $4.00 | $2.42 | $4.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 7,780 SF | $2.00 | $4.00 | $3.00 | $4.00 | $5.35 | $2.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 7,780 SF | $2.00 | $4.00 | $3.00 | $4.00 | $5.35 | $2.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 14 MNHR | $300 | $100 | $250 | $150 | $175 | $125 |
| 514E10000 FINAL INSPECTION REPAIR | 5 EACH | $300 | $100 | $350 | $250 | $320 | $150 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $100 | $1,000 | $7,000 | $2,000 | $3,120 | $2,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 45,917 SF | $10 | $459k | 18% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 22,913 SF | $14 | $321k | 12% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 12,237 SF | $15 | $184k | 7% |
| 624E10000 MOBILIZATION | 1 LS | $150,000 | $150k | 6% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 7,780 SF | $17 | $132k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $130,000 | $130k | 5% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 10,500 SF | $12 | $126k | 5% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 8,289 SF | $15 | $124k | 5% |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 45,917 SF | $2 | $92k | 4% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 45,917 SF | $2 | $92k | 4% |