TUS-SR 39-07.62
TUS County · est $1.5M
Bid dateThursday, May 23—
TUS County · est $1.5M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 55 more items below.
| Item | Quantity | R1Mark Schaffer Excavating & Trucking | R2INC Shelly & Sands INC | R3Eclipse CO LLC | R4S E T INC | % of bid |
|---|---|---|---|---|---|---|
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 1,235 CY | $210 | $190 | $206 | $210 | 25% |
| 203E10000 EXCAVATION | 6,983 CY | $18.50 | $12.50 | $20.25 | $28.00 | 12% |
| 304E20000 AGGREGATE BASE | 1,110 CY | $60.00 | $83.00 | $76.25 | $75.00 | 6% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 170 CY | $300 | $300 | $315 | $325 | 5% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (239 CY | $210 | $250 | $232 | $210 | 5% |
| 895E10040 MANUFACTURED WATER QUALITY STRUCTURE, TYPE 4 | 1 EACH | $50,000 | $43,000 |
| Item | Quantity | R1Mark Schaffer Excavating & Trucking | R2INC Shelly & Sands INC | R3Eclipse CO LLC | R4S E T INC |
|---|---|---|---|---|---|
| 202E20010 HEADWALL REMOVED | 7 EACH | $800 | $450 | $276 | $500 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 582 FT | $10.00 | $31.00 | $19.00 | $20.00 |
| 202E58100 CATCH BASIN REMOVED | 2 EACH | $500 | $740 | $560 | $650 |
| 202E75000 FENCE REMOVED | 649 FT | $15.00 | $6.00 | $5.00 | $4.00 |
| 202E75250 GATE REMOVED | 1 EACH |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $45,000 |
| $50,000 |
| 5% |
| 609E26000 CURB, TYPE 6 | 1,999 FT | $25.00 | $27.00 | $22.55 | $25.00 | 5% |
| 202E23000 PAVEMENT REMOVED | 4,870 SY | $10.00 | $12.00 | $13.00 | $18.00 | 5% |
| 441E70100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 205 CY | $220 | $300 | $275 | $215 | 4% |
| 611E98180 CATCH BASIN, NO. 3A | 11 EACH | $4,000 | $3,400 | $5,000 | $3,500 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40,000 | $40,638 | $70,000 | 4% |
| 605E14000 6" BASE PIPE UNDERDRAINS | 2,045 FT | $16.00 | $15.00 | $15.50 | $20.00 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $30,000 | $7,250 | $20,000 | $40,000 | 3% |
| 611E98410 CATCH BASIN, NO. 8 | 5 EACH | $5,000 | $6,100 | $8,000 | $5,500 | 2% |
| 611E10400 24" CONDUIT, TYPE B | 250 FT | $85.00 | $140 | $134 | $180 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $20,500 | $4,750 | $2,000 | $10,000 | 2% |
| 832E30000 EROSION CONTROL | 20,500 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 611E99574 MANHOLE, NO. 3 | 4 EACH | $5,000 | $3,750 | $7,000 | $6,000 | 2% |
| 611E99586 MANHOLE, NO. 3 WITH 108" BASE I.D. AND 12" WEIR | 1 EACH | $20,000 | $17,500 | $17,000 | $20,000 | 2% |
| 441E70700 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (36 CY | $525 | $425 | $232 | $550 | 2% |
| $500 |
| $400 |
| $275 |
| $400 |
| 203E20000 EMBANKMENT | 368 CY | $10.00 | $11.00 | $14.00 | $22.00 |
| 204E10000 SUBGRADE COMPACTION | 6,079 SY | $3.00 | $2.50 | $1.00 | $2.00 |
| 204E45000 PROOF ROLLING | 2 HOUR | $250 | $260 | $294 | $250 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 3 CY | $250 | $550 | $185 | $300 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $125 | $150 | $125 | $150 |
| 659E00300 TOPSOIL | 578 CY | $12.00 | $30.00 | $65.00 | $80.00 |
| 659E10000 SEEDING AND MULCHING | 5,210 SY | $0.85 | $1.00 | $0.85 | $1.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 261 SY | $0.80 | $1.00 | $0.80 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.73 TON | $900 | $1,250 | $892 | $900 |
| 659E31000 LIME | 1.08 ACRE | $160 | $150 | $159 | $250 |
| 659E35000 WATER | 29 MGAL | $1.00 | $1.00 | $1.00 | $10.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $2,000 | $2,000 | $1,695 | $2,500 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $5,000 | $6,000 | $1,760 | $4,500 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $5,000 | $7,750 | $7,745 | $10,000 |
| 602E20000 CONCRETE MASONRY | 1.1 CY | $5,000 | $3,640 | $2,332 | $2,500 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 18 FT | $20.00 | $40.00 | $17.00 | $30.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 10 FT | $90.00 | $44.00 | $50.00 | $50.00 |
| 611E04400 12" CONDUIT, TYPE B | 207 FT | $50.00 | $100 | $102 | $95.00 |
| 611E04600 12" CONDUIT, TYPE C | 258 FT | $45.00 | $100 | $89.00 | $90.00 |
| 611E05900 15" CONDUIT, TYPE B | 30 FT | $60.00 | $120 | $101 | $125 |
| 611E06100 15" CONDUIT, TYPE C | 217 FT | $55.00 | $90.00 | $94.00 | $105 |
| 611E07400 18" CONDUIT, TYPE B | 97 FT | $70.00 | $140 | $110 | $140 |
| 611E10600 24" CONDUIT, TYPE C | 223 FT | $75.00 | $120 | $120 | $155 |
| 611E99711 PRECAST REINFORCED CONCRETE OUTLET, AS PER PLAN | 2 EACH | $600 | $520 | $473 | $400 |
| 407E10000 TACK COAT | 1,020 GAL | $3.30 | $3.25 | $4.00 | $4.00 |
| 441E70500 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449) | — | $670 | $500 | $274 | $700 |
| 621E00100 RPM | 35 EACH | $115 | $110 | $100 | $125 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 35 EACH | $5.00 | $19.00 | $5.00 | $20.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 57 FT | $11.00 | $24.00 | $24.00 | $15.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 27.5 FT | $12.00 | $26.00 | $26.00 | $15.00 |
| 630E08600 SIGN POST REFLECTOR | 6 EACH | $60.00 | $45.00 | $45.00 | $60.00 |
| 630E80100 SIGN, FLAT SHEET | 34.5 SF | $31.00 | $36.00 | $36.00 | $30.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 12 EACH | $45.00 | $10.00 | $10.00 | $50.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 3 EACH | $75.00 | $65.00 | $65.00 | $75.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 9 EACH | $60.00 | $20.00 | $20.00 | $60.00 |
| 646E10010 EDGE LINE, 6" | 0.39 MILE | $7,500 | $9,205 | $9,000 | $10,000 |
| 646E10200 CENTER LINE | 0.33 MILE | $10,000 | $11,475 | $12,000 | $13,000 |
| 646E10300 CHANNELIZING LINE, 8" | 255 FT | $2.05 | $2.15 | $2.00 | $3.00 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 225 FT | $3.10 | $10.00 | $12.00 | $15.00 |
| 646E10800 ISLAND MARKING | 49 SF | $2.75 | $9.00 | $9.00 | $10.00 |
| 646E20300 LANE ARROW | 3 EACH | $100 | $275 | $222 | $300 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 20 CY | $75.00 | $75.00 | $145 | $125 |
| 614E12420 DETOUR SIGNING | 1 LS | $5,000 | $5,000 | $5,000 | $6,000 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.33 MILE | $2,800 | $2,750 | $21,978 | $5,000 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 0.39 MILE | $2,400 | $2,400 | $19,180 | $4,000 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 255 FT | $0.85 | $1.50 | $3.15 | $1.00 |
| 616E10000 WATER | 15 MGAL | $1.00 | $21.50 | $23.00 | $100 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $15,000 | $6,000 | $21,000 | $20,000 |
| 619E16010 FIELD OFFICE, TYPE B | 8 MNTH | $1,000 | $4,850 | $683 | $1,500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $10,000 | $14,000 | $15,000 | $40,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 1,235 CY | $210 | $259k | 21% |
| 203E10000 EXCAVATION | 6,983 CY | $18.5 | $129k | 10% |
| 304E20000 AGGREGATE BASE | 1,110 CY | $60 | $67k | 5% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 170 CY | $300 | $51k | 4% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (239 CY | $210 | $50k | 4% |
| 895E10040 MANUFACTURED WATER QUALITY STRUCTURE, TYPE 4 | 1 EACH | $50,000 | $50k | 4% |
| 609E26000 CURB, TYPE 6 | 1,999 FT | $25 | $50k | 4% |
| 202E23000 PAVEMENT REMOVED | 4,870 SY | $10 | $49k | 4% |
| 441E70100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 205 CY | $220 | $45k | 4% |
| 611E98180 CATCH BASIN, NO. 3A | 11 EACH | $4,000 | $44k | 3% |