FRA-US 40-15.27
FRA County · est $0.7M
Bid dateThursday, June 13—
FRA County · est $0.7M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 21 more items below.
| Item | Quantity | R1Strawser Paving CO INC | R2Shelly & Sands INC | R3Kokosing Construction Company INC | % of bid |
|---|---|---|---|---|---|
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 1,246 CY | $310 | $285 | $305 | 53% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 31,255 SY | $4.25 | $5.00 | $4.25 | 18% |
| 251E01041 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 402 SY | $90.00 | $150 | $125 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $35,000 | $30,000 | $43,670 | 5% |
| 442E22100 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 82 CY | $310 | $285 | $400 | 3% |
| 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS | 2,220 SY | $10.25 | $10.25 | $12.00 | 3% |
| 624E10000 MOBILIZATION |
| Item | Quantity | R1Strawser Paving CO INC | R2Shelly & Sands INC | R3Kokosing Construction Company INC |
|---|---|---|---|---|
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 4 EACH | $150 | $1,350 | $600 |
| 638E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN | 4 EACH | $65.00 | $1,150 | $600 |
| 644E00200 LANE LINE, 4" | 0.74 MILE | $2,215 | $2,215 | $2,215 |
| 644E01100 SCHOOL SYMBOL MARKING, 72" | 1 EACH | $860 | $860 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1 LS |
| $20,000 |
| $30,000 |
| $35,000 |
| 3% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 150 HOUR | $85.00 | $85.00 | $95.00 | 2% |
| 647E20942 SHARED LANE MARKING, TYPE B125 | 33 EACH | $295 | $295 | $295 | 1% |
| 407E20000 NON-TRACKING TACK COAT | 3,500 GAL | $2.40 | $3.50 | $2.75 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $8,000 | $5,000 | $3,000 | 1% |
| 644E00100 EDGE LINE, 4" | 1.66 MILE | $4,500 | $4,500 | $4,500 | 1% |
| 644E00620 CROSSWALK LINE, 12" | 1,055 FT | $4.20 | $4.20 | $4.20 | 1% |
| 621E00100 RPM | 36 EACH | $110 | $110 | $110 | 1% |
| 644E00630 CROSSWALK LINE, 24" | 414 FT | $8.50 | $8.50 | $8.50 | 0% |
| 644E00300 CENTER LINE | 0.45 MILE | $7,514 | $7,514 | $7,514 | 0% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 4 SNMT | $750 | $1,600 | $650 | 0% |
| 644E00400 CHANNELIZING LINE, 8" | 969 FT | $2.50 | $2.50 | $2.50 | 0% |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $2,000 | $3,500 | $2,000 | 0% |
| 644E00500 STOP LINE | 206 FT | $8.30 | $8.30 | $8.30 | 0% |
| $860 |
| 644E01300 LANE ARROW | 9 EACH | $93.00 | $93.00 | $93.00 |
| 644E01400 WORD ON PAVEMENT, 72" | 2 EACH | $125 | $125 | $125 |
| 644E01514 DOTTED LINE, 8" | 577 FT | $2.25 | $2.25 | $2.25 |
| 644E20801 YIELD LINE, AS PER PLAN | 20 FT | $13.80 | $13.80 | $13.80 |
| 646E10100 LANE LINE, 4" | 0.15 MILE | $9,800 | $9,800 | $9,800 |
| 646E10200 CENTER LINE | 0.06 MILE | $25,100 | $25,100 | $25,100 |
| 646E10300 CHANNELIZING LINE, 8" | 235 FT | $4.00 | $4.00 | $4.00 |
| 646E10400 STOP LINE | 39 FT | $12.80 | $12.80 | $12.80 |
| 646E10510 CROSSWALK LINE, 12" | 176 FT | $7.50 | $7.50 | $7.50 |
| 646E20300 LANE ARROW | 2 EACH | $170 | $170 | $170 |
| 646E20400 WORD ON PAVEMENT, 72" | 1 EACH | $210 | $210 | $210 |
| 614E20550 WORK ZONE LANE LINE, CLASS III, 4", 642 PAINT | 1.78 MILE | $850 | $850 | $850 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.51 MILE | $1,500 | $1,500 | $1,500 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 1,204 FT | $1.10 | $1.10 | $1.10 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 39 FT | $5.00 | $5.00 | $5.00 |
| 616E10000 WATER | 3 MGAL | $100 | $200 | $7.50 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 1,246 CY | $310 | $386k | 52% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 31,255 SY | $4.25 | $133k | 18% |
| 251E01041 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 402 SY | $90 | $36k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $35,000 | $35k | 5% |
| 442E22100 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 82 CY | $310 | $25k | 3% |
| 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS | 2,220 SY | $10.25 | $23k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20k | 3% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 150 HOUR | $85 | $13k | 2% |
| 647E20942 SHARED LANE MARKING, TYPE B125 | 33 EACH | $295 | $10k | 1% |
| 407E20000 NON-TRACKING TACK COAT | 3,500 GAL | $2.4 | $8k | 1% |