690E98400SPECIAL - CONSULTANT FOR CONCRETE QUALITY CONTROL
1 LS
$5,064
$30,108
659E20000COMMERCIAL FERTILIZER
1.38 TON
$967
$915
659E31000LIME
2.11 ACRE
$106
$100
659E35000WATER
56 MGAL
$1.06
$1.00
832E30000EROSION CONTROL
1,000 EACH
$1.00
Project details
Description
HAM-IR 75-07.80
Type of work
Pavement
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
$1.00
611E015006" CONDUIT, TYPE F
20 FT
$57.50
$116
407E10000TACK COAT
84 GAL
$10.00
$10.00
618E40100RUMBLE STRIPS, SHOULDER
95 FT
$55.00
$55.00
621E00100RPM
4 EACH
$925
$1,567
644E00104EDGE LINE, 6"
0.04 MILE
$51,315
$146,150
644E00204LANE LINE, 6"
0.04 MILE
$49,185
$73,066
614E20110WORK ZONE LANE LINE, CLASS I, 6", 642 PAINT
0.12 MILE
$2,345
$25,032
614E20560WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT
0.1 MILE
$2,345
$14,754
614E22110WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT
0.12 MILE
$3,520
$50,063
614E22360WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT
0.05 MILE
$7,040
$59,020
616E10000WATER
1 MGAL
$62.95
$110
808E18700DIGITAL SPEED LIMIT
2 SNMT
$1,150
$1,150
896E00021PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN
2 SNMT
$2,975
$2,975
614E12800WORK ZONE RAISED PAVEMENT MARKER
100 EACH
$25.00
$48.75
614E22010WORK ZONE EDGE LINE, CLASS I, 6"
0.2 MILE
$3,520
$50,063
614E23010WORK ZONE CHANNELIZING LINE, CLASS I, 12"
1,000 FT
$4.40
$2.50
108E30000CPM PROGRESS SCHEDULE SHORT DURATION PROJECTS