690E98300SPECIAL - CEMENT STABILIZED SUBGRADE, FULL DEPTH R
35,317.3 SY
$16.00
$17.25
40%
441E50200ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1
448 (1631 CY
$250
$240
29%
441E50000ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG
1,184.5 CY
$250
$245
21%
617E10100COMPACTED AGGREGATE
294.3 CY
$130
$100
3%
624E10000MOBILIZATION
1 LS
$34,800
$70,000
2%
614E11000MAINTAINING TRAFFIC
1 LS
$32,809
$45,000
2%
407E20000NON-TRACKING TACK COAT
2,717.9 GAL
$4.00
$3.20
1%
642E00300CENTER LINE, TYPE 1
3.01 MILE
$1,710
$1,600
0%
103E05000PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM
1 LS
$5,000
$6,191
0%
623E10001CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P
1 LS
$3,000
$10,000
0%
Project details
Description
MOE-CR 22-00.00
Type of work
Pavement
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
Qty
Unit price
Extended
%
690E98300SPECIAL - CEMENT STABILIZED SUBGRADE, FULL DEPTH R
35,317.3 SY
$16
$565k
40%
441E50200ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1
448 (1631 CY
$250
$408k
29%
441E50000ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG
1,184.5 CY
$250
$296k
21%
617E10100COMPACTED AGGREGATE
294.3 CY
$130
$38k
3%
624E10000MOBILIZATION
1 LS
$34,800
$35k
2%
614E11000MAINTAINING TRAFFIC
1 LS
$32,809
$33k
2%
407E20000NON-TRACKING TACK COAT
2,717.9 GAL
$4
$11k
1%
642E00300CENTER LINE, TYPE 1
3.01 MILE
$1,710
$5k
0%
103E05000PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM
1 LS
$5,000
$5k
0%
623E10001CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P