POR-SR 225-11.04
POR County · est $1.9M
Bid dateThursday, July 11—
POR County · est $1.9M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 47 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Ronyak Paving INC | R3Karvo Companies INC | R4Shelly Company | R5Kokosing Construction Company INC | % of bid |
|---|---|---|---|---|---|---|---|
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 3,305 CY | $200 | $210 | $212 | $200 | $245 | 45% |
| 422E25000 EMULSION, CHIP SEAL | 31,364 GAL | $3.50 | $3.00 | $3.10 | $2.80 | $2.80 | 8% |
| 422E11000 AGGREGATE, SINGLE CHIP SEAL, TYPE A (INTERLAYER) | 78,407 SY | $1.25 | $1.00 | $1.75 | $2.00 | $2.05 | 7% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T=1.75") | 78,413 SY | $1.00 | $1.50 | $1.25 | $1.75 | $1.20 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $70,678 | $115,000 | $106,966 | $210,500 | $77,000 | 5% |
| 251E01000 |
| Item | Quantity | R1Shelly & Sands INC | R2Ronyak Paving INC | R3Karvo Companies INC | R4Shelly Company | R5Kokosing Construction Company INC |
|---|---|---|---|---|---|---|
| 202E23500 WEARING COURSE REMOVED | 369 SY | $14.00 | $20.00 | $1.25 | $35.00 | $10.00 |
| 202E98100 REMOVAL MISC.: BARRIER REFLECTOR | 9 EACH | $12.00 | $15.00 | $10.00 | $15.00 | $15.00 |
| 203E10000 EXCAVATION | 60 CY | $30.00 | $70.00 | $15.00 | $50.00 | $40.00 |
| 209E72000 PREPARING SUBGRADE FOR SHOULDER PAVING | 497 STA | $15.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1,800 SY |
| $30.00 |
| $40.00 |
| $30.00 |
| $49.00 |
| $46.00 |
| 4% |
| 519E00100 SPECIAL - COMPOSITE FIBER WRAP SYSTEM | 300 SF | $175 | $66.35 | $175 | $0.05 | $66.35 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $48,000 | $100,000 | $40,000 | $96,000 | 3% |
| 253E01000 PAVEMENT REPAIR | 350 SY | $110 | $140 | $86.00 | $100 | $260 | 3% |
| 530E00800 SPECIAL - STRUCTURES: CONCRETE SPALL REMOVAL WITH | 25 SY | $1,430 | $399 | $1,000 | $0.10 | $399 | 2% |
| 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA | 225 SF | $150 | $143 | $150 | $150 | $143 | 2% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 307 CY | $100 | $125 | $120 | $75.00 | $125 | 2% |
| 646E10010 EDGE LINE, 6" | 9.44 MILE | $2,800 | $3,300 | $2,800 | $2,800 | $2,800 | 2% |
| 209E60200 LINEAR GRADING | 498 STA | $40.00 | $35.00 | $35.00 | $60.00 | $70.00 | 1% |
| 646E10200 CENTER LINE | 4.72 MILE | $4,150 | $3,490 | $4,150 | $4,150 | $4,150 | 1% |
| 512E33010 TYPE 3 WATERPROOFING | 482 SY | $40.00 | $54.08 | $40.00 | $40.00 | $54.08 | 1% |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $3,000 | $1,850 | $2,000 | $2,500 | $3,000 | 1% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) (TRANSVERSE) | 200 SY | $85.00 | $145 | $85.00 | $160 | $136 | 1% |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 14.16 MILE | $1,100 | $1,150 | $1,100 | $1,100 | $1,100 | 1% |
| 408E10001 PRIME COAT, AS PER PLAN | 4,410 GAL | $3.50 | $3.00 | $5.25 | $4.50 | $3.00 | 1% |
| $25.00 |
| $32.00 |
| $30.00 |
| $7.00 |
| 690E91000 SPECIAL - AS-BUILT CONSTRUCTION PLANS | 1 LS | $3,000 | $3,500 | $622 | $5,000 | $1,000 |
| 659E10000 SEEDING AND MULCHING | 13,834 SY | $0.87 | $1.00 | $0.87 | $0.87 | $0.75 |
| 659E20000 COMMERCIAL FERTILIZER | 1.87 TON | $250 | $450 | $250 | $250 | $250 |
| 659E31000 LIME | 2.86 ACRE | $25.00 | $125 | $25.00 | $25.00 | $25.00 |
| 659E35000 WATER | 74.7 MGAL | $1.00 | $1.00 | $2.07 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 304E20000 AGGREGATE BASE | 60 CY | $50.00 | $65.00 | $20.00 | $60.00 | $55.00 |
| 407E20000 NON-TRACKING TACK COAT | 4,772 GAL | $3.05 | $2.00 | $1.00 | $2.50 | $2.15 |
| 621E00100 RPM | 365 EACH | $41.00 | $43.50 | $41.00 | $43.00 | $43.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 292 EACH | $5.00 | $1.00 | $1.00 | $6.00 | $2.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 34 EACH | $20.00 | $75.00 | $15.00 | $75.00 | $75.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 45 FT | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 630E80100 SIGN, FLAT SHEET | 6 SF | $18.00 | $18.00 | $18.00 | $18.00 | $18.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 10 EACH | $20.00 | $20.00 | $20.00 | $20.00 | $20.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 10 EACH | $20.00 | $20.00 | $20.00 | $20.00 | $20.00 |
| 646E10300 CHANNELIZING LINE, 8" | 450 FT | $2.00 | $1.58 | $2.00 | $2.00 | $2.00 |
| 646E10400 STOP LINE | 67 FT | $12.00 | $13.50 | $12.00 | $12.00 | $12.00 |
| 646E20000 RAILROAD SYMBOL MARKING | 2 EACH | $550 | $650 | $550 | $550 | $550 |
| 646E20300 LANE ARROW | 6 EACH | $150 | $165 | $150 | $150 | $150 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 75 HOUR | $85.00 | $125 | $75.00 | $100 | $81.00 |
| 614E12460 WORK ZONE MARKING SIGN | 6 EACH | $65.00 | $65.00 | $65.00 | $65.00 | $65.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 20 CY | $250 | $225 | $200 | $115 | $125 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 6 SNMT | $900 | $900 | $900 | $900 | $1,250 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 9.44 MILE | $625 | $695 | $625 | $625 | $625 |
| 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, 8" | 900 FT | $0.55 | $0.70 | $0.55 | $0.55 | $0.55 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 450 FT | $0.55 | $0.65 | $0.55 | $0.55 | $0.55 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 134 FT | $3.00 | $3.10 | $3.00 | $3.00 | $3.00 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 67 FT | $3.00 | $3.10 | $3.00 | $3.00 | $3.00 |
| 614E32000 WORK ZONE RAILROAD SYMBOL MARKING, CLASS I | 4 EACH | $235 | $150 | $235 | $235 | $235 |
| 614E32210 WORK ZONE RAILROAD SYMBOL MARKING, CLASS III, 642 | 2 EACH | $235 | $150 | $235 | $235 | $235 |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $3,000 | $1,170 | $3,000 | $3,000 | $1,170 |
| 202E23500 WEARING COURSE REMOVED | 482 SY | $15.00 | $40.00 | $20.00 | $15.00 | $10.00 |
| 203E20000 EMBANKMENT | 20 CY | $200 | $111 | $200 | $200 | $111 |
| 407E20000 NON-TRACKING TACK COAT | 44 GAL | $3.05 | $25.00 | $1.00 | $2.50 | $2.15 |
| 409E30000 SAWING AND SEALING ASPHALT CONCRETE PAVEMENT JOINT | 64 FT | $50.00 | $30.90 | $50.00 | $50.00 | $30.90 |
| 441E70100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 21 CY | $225 | $600 | $212 | $440 | $620 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 35 SY | $50.00 | $43.65 | $50.00 | $50.00 | $43.65 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 268 FT | $10.00 | $31.29 | $10.00 | $10.00 | $31.29 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 50 SF | $150 | $143 | $150 | $150 | $143 |
| 601E26000 DUMPED ROCK FILL, TYPE B | 20 CY | $350 | $191 | $350 | $350 | $191 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $2,500 | $10,000 | $5,500 | $2,500 | $2,000 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,500 | $11,599 | $14,600 | $5,000 | $8,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,000 | $7,000 | $2,500 | $5,000 | $4,600 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 3,305 CY | $200 | $661k | 41% |
| 422E25000 EMULSION, CHIP SEAL | 31,364 GAL | $3.5 | $110k | 7% |
| 422E11000 AGGREGATE, SINGLE CHIP SEAL, TYPE A (INTERLAYER) | 78,407 SY | $1.25 | $98k | 6% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T=1.75") | 78,413 SY | $1 | $78k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $70,678 | $71k | 4% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) (LONGITUDINAL) | 1,800 SY | $30 | $54k | 3% |
| 519E00100 SPECIAL - COMPOSITE FIBER WRAP SYSTEM | 300 SF | $175 | $53k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 2% |
| 253E01000 PAVEMENT REPAIR | 350 SY | $110 | $39k | 2% |
| 530E00800 SPECIAL - STRUCTURES: CONCRETE SPALL REMOVAL WITH | 25 SY | $1,430 | $36k | 2% |