STA-SR 172-03.94
STA County · est $1.6M
Bid dateThursday, July 25—
STA County · est $1.6M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 37 more items below.
| Item | Quantity | R1Northstar Asphalt INC | R2Superior Paving & Materials INC | R3Shelly Company | R4Karvo Companies INC | % of bid |
|---|---|---|---|---|---|---|
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, | 1,965 CY | $235 | $220 | $245 | $235 | 32% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1, | 979 CY | $210 | $190 | $205 | $225 | 14% |
| 441E70201 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 449 (594 CY | $210 | $190 | $175 | $160 | 9% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN | 56,567 SY | $2.00 | $2.40 | $2.50 | $2.50 | 8% |
| 608E52000 CURB RAMP | 2,550 SF | $31.65 | $32.00 | $20.00 | $20.00 | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $64,000 | $135,000 | $182,200 |
| Item | Quantity | R1Northstar Asphalt INC | R2Superior Paving & Materials INC | R3Shelly Company | R4Karvo Companies INC |
|---|---|---|---|---|---|
| 690E91000 SPECIAL - AS-BUILT CONSTRUCTION PLANS | 1 LS | $4,500 | $2,500 | $6,000 | $572 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 7 EACH | $1,000 | $1,700 | $2,600 | $2,600 |
| 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE | 1 EACH | $1,500 | $2,400 | $4,500 | $4,500 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $217,000 |
| 4% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 800 SY | $60.00 | $38.00 | $35.00 | $50.00 | 3% |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 32 EACH | $1,450 | $1,700 | $2,000 | $2,000 | 3% |
| 609E26000 CURB, TYPE 6 | 960 FT | $45.00 | $45.00 | $40.00 | $35.00 | 3% |
| 253E01000 PAVEMENT REPAIR | 300 SY | $140 | $98.00 | $195 | $100 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40,000 | $40,000 | $145,710 | 3% |
| 608E10000 4" CONCRETE WALK | 4,425 SF | $8.50 | $9.00 | $11.00 | $8.00 | 3% |
| 619E16010 FIELD OFFICE, TYPE B | 12 MNTH | $2,000 | $1,800 | $2,300 | $2,000 | 2% |
| 202E30000 WALK REMOVED | 4,470 SF | $4.25 | $5.00 | $5.00 | $8.00 | 1% |
| 646E10200 CENTER LINE | 4.33 MILE | $4,100 | $4,100 | $4,100 | $4,100 | 1% |
| 407E13900 TACK COAT, 702.13 | 4,526 GAL | $3.60 | $3.00 | $4.00 | $2.75 | 1% |
| 407E20000 NON-TRACKING TACK COAT | 3,395 GAL | $3.50 | $3.00 | $2.75 | $2.75 | 1% |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 8.66 MILE | $1,250 | $1,250 | $1,250 | $1,250 | 1% |
| 202E32000 CURB REMOVED | 960 FT | $10.50 | $11.00 | $13.00 | $35.00 | 1% |
| 203E10000 EXCAVATION | 500 CY | $20.00 | $18.00 | $25.00 | $5.00 | 1% |
| 611E99660 MANHOLE RECONSTRUCTED TO GRADE |
| 3 EACH |
| $1,650 |
| $1,800 |
| $3,000 |
| $3,000 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 4,950 LB | $2.00 | $1.75 | $3.00 | $3.00 |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 125 SY | $80.00 | $38.00 | $120 | $135 |
| 304E20000 AGGREGATE BASE | 50 CY | $90.00 | $82.00 | $40.00 | $25.00 |
| 441E70500 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), | 4 CY | $1,200 | $400 | $400 | $325 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 391 FT | $15.00 | $15.00 | $15.00 | $15.00 |
| 630E80100 SIGN, FLAT SHEET | 211 SF | $22.50 | $22.50 | $22.50 | $22.50 |
| 646E10010 EDGE LINE, 6" | 2.84 MILE | $3,000 | $3,000 | $3,000 | $3,000 |
| 646E10110 LANE LINE, 6" | 0.64 MILE | $2,000 | $2,000 | $2,000 | $2,000 |
| 646E10310 CHANNELIZING LINE, 12" | 1,185 FT | $1.95 | $1.95 | $1.95 | $1.95 |
| 646E10400 STOP LINE | 332 FT | $10.00 | $10.00 | $10.00 | $10.00 |
| 646E10510 CROSSWALK LINE, 12" | 537 FT | $6.25 | $6.25 | $6.25 | $6.25 |
| 646E10520 CROSSWALK LINE, 24" | 402 FT | $10.00 | $10.00 | $10.00 | $10.00 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 170 FT | $10.00 | $10.00 | $10.00 | $10.00 |
| 646E20300 LANE ARROW | 23 EACH | $150 | $150 | $150 | $150 |
| 646E20370 TWO WAY LEFT TURN ARROW | 35 EACH | $150 | $150 | $150 | $150 |
| 646E20400 WORD ON PAVEMENT, 72" | 2 EACH | $275 | $275 | $275 | $275 |
| 646E20504 DOTTED LINE, 6" | 25 FT | $7.50 | $7.50 | $7.50 | $7.50 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 100 HOUR | $100 | $80.00 | $100 | $100 |
| 614E12460 WORK ZONE MARKING SIGN | 8 EACH | $60.00 | $60.00 | $60.00 | $60.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $900 | $400 | $125 | $400 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 8 SNMT | $900 | $900 | $900 | $900 |
| 614E20010 WORK ZONE LANE LINE, CLASS I, 6" | 1.28 MILE | $625 | $625 | $625 | $625 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 0.64 MILE | $625 | $625 | $625 | $625 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 4.33 MILE | $1,250 | $1,250 | $1,250 | $1,250 |
| 614E23010 WORK ZONE CHANNELIZING LINE, CLASS I, 12" | 2,370 FT | $0.50 | $0.50 | $0.50 | $0.50 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 1,185 FT | $0.50 | $0.50 | $0.50 | $0.50 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 664 FT | $3.00 | $3.00 | $3.00 | $3.00 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 332 FT | $3.00 | $3.00 | $3.00 | $3.00 |
| 614E30000 WORK ZONE ARROW, CLASS I | 12 EACH | $50.00 | $50.00 | $50.00 | $50.00 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 6 EACH | $50.00 | $50.00 | $50.00 | $50.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,750 | $10,200 | $4,000 | $15,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,400 | $3,000 | $8,000 | $3,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, | 1,965 CY | $235 | $462k | 29% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1, | 979 CY | $210 | $206k | 13% |
| 441E70201 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 449 (594 CY | $210 | $125k | 8% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN | 56,567 SY | $2 | $113k | 7% |
| 608E52000 CURB RAMP | 2,550 SF | $31.65 | $81k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $64,000 | $64k | 4% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 800 SY | $60 | $48k | 3% |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 32 EACH | $1,450 | $46k | 3% |
| 609E26000 CURB, TYPE 6 | 960 FT | $45 | $43k | 3% |
| 253E01000 PAVEMENT REPAIR | 300 SY | $140 | $42k | 3% |