HAM-IR 74-13.35
HAM County · est $5.3M
Bid dateThursday, August 22—
HAM County · est $5.3M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 127 more items below.
| Item | Quantity | R1Eagle Bridge CO | R2Sunesis Construction CO | R3Great Lakes Construction CO | R4Complete General Construction Company | R5Kokosing Construction Company INC | % of bid |
|---|---|---|---|---|---|---|---|
| 515E15080 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M | 10 EACH | $64,000 | $70,727 | $69,000 | $57,000 | $70,000 | 17% |
| 202E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN | 1 LS | $325,000 | $270,384 | $291,500 | $450,000 | $400,000 | 9% |
| 840E20000 MECHANICALLY STABILIZED EARTH WALL | 6,246 SF | $50.00 | $65.28 | $53.00 | $60.00 | $61.00 | 8% |
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A | 913 CY | $315 | $275 | $275 | $275 | $275 | 8% |
| 511E53014 CLASS QC3 CONCRETE, MISC.: WITH QC/QA, BRIDGE DECK | 241 CY | $1,175 | $1,785 | $1,095 | $950 | $1,250 |
| Item | Quantity | R1Eagle Bridge CO | R2Sunesis Construction CO | R3Great Lakes Construction CO | R4Complete General Construction Company | R5Kokosing Construction Company INC |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $30,000 | $30,200 | $70,000 | $50,000 | $30,200 |
| 202E23000 PAVEMENT REMOVED | 969 SY | $12.00 | $19.22 | $25.00 | $16.00 | $20.00 |
| 202E30000 WALK REMOVED | 472 SF | $3.00 | $3.54 | $4.00 | $5.00 | $6.50 |
| 202E30700 CONCRETE BARRIER REMOVED | 55 FT | $25.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 8% |
| 624E10000 MOBILIZATION | 1 LS | $262,500 | $119,314 | $280,000 | $280,000 | $200,000 | 7% |
| 509E26000 GALVANIZED STEEL REINFORCEMENT | 114,538 LB | $1.75 | $2.43 | $2.20 | $2.00 | $2.25 | 5% |
| 503E31500 STRUCTURAL EXCAVATION, MISC.:FORWARD ABUTMENT | 1 LS | $200,000 | $18,779 | $100,000 | $30,000 | $80,000 | 5% |
| 840E23000 SELECT GRANULAR BACKFILL | 2,817 CY | $55.00 | $65.59 | $55.00 | $150 | $68.00 | 4% |
| 526E30011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA | 259 SY | $425 | $550 | $530 | $480 | $550 | 3% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 1,682 CY | $65.00 | $74.10 | $75.00 | $120 | $140 | 3% |
| 840E21000 WALL EXCAVATION | 1,588 CY | $65.00 | $38.97 | $35.00 | $26.00 | $43.00 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $100,000 | $54,466 | $185,000 | $200,000 | $181,500 | 3% |
| 511E34460 CLASS QC SCC CONCRETE, BRIDGE DECK | 71 CY | $1,300 | $2,173 | $1,220 | $2,300 | $2,000 | 3% |
| 690E98400 SPECIAL - MISC.:WORK INVOLVING ASBESTOS CONTAINING | 1 LS | $90,000 | $33,000 | $9,000 | $22,000 | $15,000 | 2% |
| AA2 607E40000 SPECIAL - VANDAL PROTECTION FENCE (11'-10" TALL AE | 178 FT | $500 | $610 | $540 | $610 | $650 | 2% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $85,000 | $123,150 | $211,000 | $200,000 | $90,000 | 2% |
| 503E31500 STRUCTURAL EXCAVATION, MISC.:REAR ABUTMENT | 1 LS | $85,000 | $13,439 | $80,000 | $30,000 | $80,000 | 2% |
| 619E16021 FIELD OFFICE, TYPE C, AS PER PLAN | 18 MNTH | $4,500 | $2,157 | $5,000 | $4,500 | $5,000 | 2% |
| AA2 607E40000 SPECIAL - VANDAL PROTECTION FENCE (6'-7" TALL AEST | 178 FT | $415 | $535 | $450 | $535 | $575 | 2% |
| $35.82 |
| $60.00 |
| $26.00 |
| $95.00 |
| 202E32000 CURB REMOVED | 26 FT | $3.00 | $7.01 | $10.00 | $14.00 | $16.00 |
| 202E32500 CURB AND GUTTER REMOVED | 231 FT | $6.00 | $8.70 | $15.00 | $19.00 | $45.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 26 FT | $10.00 | $13.59 | $50.00 | $45.00 | $45.00 |
| 202E38000 GUARDRAIL REMOVED | 1,313 FT | $2.50 | $6.00 | $2.50 | $6.00 | $6.00 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 3 EACH | $210 | $125 | $210 | $450 | $125 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 4 EACH | $115 | $100 | $115 | $450 | $100 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 5 EACH | $125 | $200 | $125 | $135 | $200 |
| 202E47800 IMPACT ATTENUATOR REMOVED | 2 EACH | $210 | $250 | $210 | $1,200 | $250 |
| 202E53100 MAILBOX REMOVED | 4 EACH | $25.00 | $85.24 | $185 | $50.00 | $225 |
| 203E10000 EXCAVATION | 1,880 CY | $30.00 | $32.61 | $30.00 | $25.00 | $28.50 |
| 203E20000 EMBANKMENT | 1,153 CY | $28.00 | $16.09 | $12.50 | $33.00 | $45.00 |
| 204E10000 SUBGRADE COMPACTION | 1,539 SY | $6.00 | $4.74 | $3.10 | $4.00 | $4.50 |
| 606E15050 GUARDRAIL, TYPE MGS | 625 FT | $21.50 | $28.50 | $21.50 | $28.50 | $28.50 |
| 606E15550 GUARDRAIL, BARRIER DESIGN, TYPE MGS | 150 FT | $38.50 | $56.00 | $38.50 | $56.00 | $56.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 3 EACH | $2,650 | $2,650 | $2,650 | $2,650 | $2,650 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 7 EACH | $1,350 | $1,325 | $1,350 | $1,325 | $1,325 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 3 EACH | $2,600 | $2,450 | $2,600 | $2,450 | $2,450 |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 1 EACH | $500 | $450 | $500 | $450 | $450 |
| 606E60012 IMPACT ATTENUATOR, TYPE 1 | 2 EACH | $6,800 | $4,850 | $6,800 | $4,850 | $4,850 |
| 608E12000 5" CONCRETE WALK | 1,344 SF | $12.00 | $11.53 | $14.50 | $15.00 | $14.50 |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 1,880 FT | $33.00 | $34.11 | $36.00 | $35.00 | $31.00 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 4 EACH | $195 | $57.86 | $195 | $200 | $400 |
| 690E98400 SPECIAL - ITEM SPECIAL - CONSULTANT FOR CONCRETE Q | 1 LS | $15,000 | $15,060 | $35,000 | $27,000 | $35,045 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 54 SY | $75.00 | $128 | $197 | $100 | $170 |
| 601E23000 ARTICULATING CONCRETE BLOCK REVETMENT SYSTEM, TYPE | 62 SY | $275 | $450 | $413 | $200 | $685 |
| 616E10000 WATER | 15 MGAL | $10.00 | $5.67 | $50.00 | $50.00 | $80.00 |
| 659E00300 TOPSOIL | 1,401 CY | $20.00 | $58.90 | $32.00 | $68.00 | $42.00 |
| 659E10000 SEEDING AND MULCHING | 12,911 SY | $1.75 | $2.74 | $1.15 | $1.22 | $1.15 |
| 659E14000 REPAIR SEEDING AND MULCHING | 126 SY | $3.00 | $1.28 | $1.00 | $1.22 | $1.00 |
| 659E15000 INTER-SEEDING | 126 SY | $3.00 | $1.05 | $0.01 | $1.00 | $0.01 |
| 659E20000 COMMERCIAL FERTILIZER | 1.71 TON | $1,750 | $943 | $1,500 | $900 | $1,500 |
| 659E31000 LIME | 2.62 ACRE | $5.00 | $131 | $200 | $125 | $200 |
| 659E35000 WATER | 96 MGAL | $15.00 | $1.05 | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 836E10000 SEEDING AND EROSION CONTROL WITH TURF REINFORCING | 79 SY | $12.00 | $9.22 | $5.00 | $8.80 | $5.00 |
| 602E20000 CONCRETE MASONRY | 0.2 CY | $3,750 | $6,034 | $5,300 | $7,000 | $9,000 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 25 FT | $10.00 | $28.72 | $30.00 | $29.00 | $60.00 |
| 605E14000 6" BASE PIPE UNDERDRAINS | 372 FT | $12.00 | $17.31 | $20.00 | $28.00 | $25.00 |
| 605E31100 AGGREGATE DRAINS | 40 FT | $12.00 | $12.85 | $9.00 | $15.00 | $50.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 55 FT | $15.00 | $42.60 | $50.00 | $33.00 | $42.00 |
| 611E04600 12" CONDUIT, TYPE C | 65 FT | $90.00 | $87.26 | $86.00 | $135 | $190 |
| 611E04600 12" CONDUIT, TYPE C, 706.1 | 33 FT | $90.00 | $86.60 | $130 | $132 | $235 |
| 611E98470 CATCH BASIN, NO. 2-2B | 2 EACH | $2,000 | $1,672 | $3,750 | $3,800 | $3,800 |
| 611E99574 MANHOLE, NO. 3 | 1 EACH | $4,000 | $3,433 | $5,150 | $5,500 | $5,000 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 3 EACH | $225 | $377 | $425 | $500 | $1,100 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE | 16,427 SY | $2.65 | $5.00 | $5.00 | $5.00 | $5.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE | 248 SY | $14.25 | $16.00 | $16.00 | $16.00 | $16.00 |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, | 165 CY | $265 | $230 | $230 | $230 | $230 |
| 304E20000 AGGREGATE BASE | 218 CY | $100 | $85.69 | $118 | $135 | $120 |
| 407E10000 TACK COAT | 1,531 GAL | $1.00 | $3.00 | $3.00 | $3.00 | $3.00 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, | 51 CY | $325 | $450 | $450 | $450 | $450 |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, | 51 CY | $300 | $425 | $425 | $425 | $425 |
| 452E11010 7" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 229 SY | $120 | $107 | $128 | $80.00 | $98.00 |
| 609E18000 COMBINATION CURB AND GUTTER, TYPE 3 | 12 FT | $50.00 | $51.40 | $150 | $105 | $85.00 |
| 609E24511 CURB, TYPE 4-C, AS PER PLAN | 19 FT | $45.00 | $47.20 | $80.00 | $64.00 | $60.00 |
| 609E26000 CURB, TYPE 6 | 197 FT | $45.00 | $42.78 | $54.00 | $66.00 | $55.00 |
| 618E40600 RUMBLE STRIPS, SHOULDER | 2 MILE | $5,500 | $1,075 | $3,250 | $6,500 | $3,250 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 | 12 EACH | $12.00 | $15.00 | $12.00 | $15.00 | $15.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 | 19 EACH | $12.00 | $15.00 | $12.00 | $15.00 | $15.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 58.8 FT | $15.50 | $18.00 | $17.50 | $18.00 | $18.00 |
| 630E80100 SIGN, FLAT SHEET | 25 SF | $16.00 | $28.00 | $25.00 | $28.00 | $28.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 6 EACH | $15.00 | $30.00 | $25.00 | $30.00 | $30.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 3 EACH | $20.00 | $50.00 | $25.00 | $50.00 | $50.00 |
| 644E00100 EDGE LINE, 4" | 0.16 MILE | $10,090 | $11,620 | $10,090 | $10,090 | $10,090 |
| 644E00300 CENTER LINE, DOUBLE YELLOW | 0.08 MILE | $18,775 | $20,425 | $18,775 | $18,775 | $18,775 |
| 646E10000 EDGE LINE, 4" | 0.1 MILE | $15,445 | $37,195 | $15,445 | $15,445 | $15,445 |
| 646E10200 CENTER LINE, DOUBLE YELLOW | 0.05 MILE | $30,875 | $65,475 | $30,875 | $30,875 | $30,875 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 50 CY | $80.00 | $95.08 | $100 | $115 | $170 |
| 410E13000 TRAFFIC COMPACTED SURFACE, TYPE C | 25 CY | $80.00 | $115 | $110 | $130 | $200 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 500 HOUR | $120 | $70.00 | $95.00 | $100 | $105 |
| 614E11630 INCREASED BARRIER DELINEATION, ONE-WAY | 1,880 FT | $1.25 | $2.37 | $2.37 | $2.37 | $1.00 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS, | 4 EACH | $2,150 | $2,147 | $2,147 | $2,147 | $7,600 |
| 614E12420 DETOUR SIGNING | 1 LS | $9,000 | $6,250 | $6,287 | $6,287 | $33,000 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 25 CY | $450 | $681 | $600 | $300 | $600 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, BIDIRECTIONAL | 42 EACH | $10.00 | $13.26 | $13.26 | $13.26 | $11.00 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, ONE-WAY | 38 EACH | $10.00 | $13.26 | $13.26 | $13.26 | $11.50 |
| 614E13350 OBJECT MARKER, ONE WAY | 80 EACH | $16.00 | $19.94 | $19.94 | $20.00 | $17.50 |
| 614E18010 MAINTAINING TRAFFIC, MISC.:: NON-REINFORCED CONCRE | 304 SF | $20.00 | $20.03 | $40.00 | $22.00 | $65.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 12 SNMT | $800 | $950 | $954 | $954 | $950 |
| 202E22900 APPROACH SLAB REMOVED | 167 SY | $45.00 | $35.12 | $45.00 | $55.00 | $70.00 |
| 202E23500 WEARING COURSE REMOVED | 167 SY | $12.00 | $7.96 | $17.00 | $11.00 | $27.00 |
| 203E35111 GRANULAR MATERIAL, TYPE B, AS PER PLAN | 479 CY | $80.00 | $77.26 | $72.00 | $80.00 | $95.00 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $50,000 | $13,857 | $90,000 | $45,000 | $60,000 |
| 507E00101 STEEL PILES HP10X42, FURNISHED, AS PER PLAN | 900 FT | $50.00 | $34.76 | $42.00 | $40.00 | $32.00 |
| 507E92201 PREBORED HOLES, AS PER PLAN | 262 FT | $230 | $193 | $310 | $45.00 | $120 |
| 509E30020 NO. 4 DEFORMED GFRP REINFORCEMENT | 4,603 FT | $1.60 | $1.68 | $2.10 | $1.60 | $2.50 |
| 511E33500 SEMI-INTEGRAL DIAPHRAGM GUIDE | 2 EACH | $6,750 | $3,969 | $5,500 | $4,400 | $3,800 |
| 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING | 78 CY | $675 | $813 | $700 | $800 | $800 |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 27 CY | $725 | $853 | $925 | $750 | $650 |
| 511E53012 CLASS QC2 CONCRETE, MISC.: MOMENT SLAB | 81 CY | $850 | $927 | $665 | $750 | $1,100 |
| 511E53014 CLASS QC3 CONCRETE, MISC.: WITH QC/QA, PIER ABOVE | 45 CY | $1,150 | $1,603 | $1,775 | $1,500 | $1,500 |
| 511E53014 CLASS QC3 CONCRETE, MISC.: WITH QC/QA, SIDEWALK | 36 CY | $650 | $664 | $605 | $975 | $300 |
| 511E53014 CLASS QC3 CONCRETE, MISC.: WITH QC/QA, SUPERSTRUCT | 48 CY | $1,000 | $1,506 | $1,350 | $1,200 | $1,800 |
| 512E10050 SEALING OF CONCRETE SURFACES | 231 SY | $14.50 | $25.91 | $14.50 | $14.50 | $13.00 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 771 SY | $25.50 | $47.68 | $25.50 | $25.50 | $25.00 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) (LIG | 524 SY | $25.50 | $57.01 | $25.50 | $25.50 | $25.00 |
| 515E20000 INTERMEDIATE DIAPHRAGMS | 24 EACH | $3,000 | $3,638 | $3,500 | $3,300 | $2,350 |
| 516E10010 ARMORLESS PREFORMED JOINT SEAL | 78 FT | $55.00 | $56.79 | $95.00 | $75.00 | $63.00 |
| 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER | 78 SF | $7.00 | $2.84 | $15.00 | $10.00 | $8.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 16 SF | $7.00 | $4.57 | $20.00 | $12.00 | $9.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 614 SF | $9.00 | $6.75 | $20.00 | $15.00 | $8.50 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 78 FT | $35.00 | $48.60 | $40.00 | $42.00 | $45.00 |
| 516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 10 EACH | $3,250 | $3,538 | $3,100 | $2,400 | $3,000 |
| 516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 10 EACH | $2,250 | $2,215 | $2,300 | $1,500 | $1,975 |
| 526E90031 TYPE C INSTALLATION, AS PER PLAN | 78 FT | $300 | $246 | $330 | $365 | $345 |
| 530E13000 SPECIAL - FORM LINER | 2,148 SF | $7.00 | $5.19 | $5.00 | $10.00 | $1.00 |
| 601E21000 CONCRETE SLOPE PROTECTION | 17 SY | $220 | $125 | $170 | $500 | $210 |
| 622E25000 CONCRETE BARRIER END SECTION, TYPE D | 1 EACH | $6,250 | $2,312 | $5,800 | $5,400 | $4,750 |
| 625E25502 CONDUIT, 3", 725.05 | 660 FT | $23.00 | $15.50 | $23.00 | $20.00 | $15.50 |
| 625E29920 STRUCTURE JUNCTION BOX | 2 EACH | $3,750 | $3,800 | $3,750 | $3,000 | $3,800 |
| 625E30520 PULL BOX, 725.06, SIZE 7 | 4 EACH | $1,150 | $1,450 | $1,150 | $1,700 | $1,450 |
| 625E33000 STRUCTURE GROUNDING SYSTEM | 1 EACH | $2,700 | $10,200 | $2,700 | $12,000 | $10,200 |
| 840E22000 FOUNDATION PREPARATION | 566 SY | $35.00 | $55.71 | $37.00 | $40.00 | $30.00 |
| 840E25010 6" DRAINAGE PIPE, PERFORATED | 306 FT | $15.00 | $3.78 | $15.00 | $8.00 | $8.00 |
| 840E25020 6" DRAINAGE PIPE, NON-PERFORATED | 10 FT | $15.00 | $26.69 | $40.00 | $24.00 | $35.00 |
| 840E26000 CONCRETE COPING | 337 FT | $200 | $228 | $225 | $290 | $200 |
| 840E27000 ON-SITE ASSISTANCE | 5 DAY | $650 | $339 | $1,000 | $750 | $100 |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $25,000 | $20,328 | $25,000 | $18,000 | $25,000 |
| 638E98000 WATER WORK, MISC.:VIDEO INSPECTION | 4 EACH | $400 | $339 | $1,500 | $600 | $2,150 |
| AA2 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) (DAR | 366 SY | $25.50 | $67.38 | $30.00 | $25.50 | $23.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $60,000 | $26,557 | $45,000 | $31,000 | $25,000 |
| 108E10000 CPM PROGRESS SCHEDULE | 1 LS | $7,500 | $3,020 | $2,000 | $5,000 | $5,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $32,500 | $10,300 | $45,000 | $38,000 | $40,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 515E15080 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M | 10 EACH | $64,000 | $640k | 12% |
| 202E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN | 1 LS | $325,000 | $325k | 6% |
| 840E20000 MECHANICALLY STABILIZED EARTH WALL | 6,246 SF | $50 | $312k | 6% |
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A | 913 CY | $315 | $288k | 5% |
| 511E53014 CLASS QC3 CONCRETE, MISC.: WITH QC/QA, BRIDGE DECK | 241 CY | $1,175 | $283k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $262,500 | $263k | 5% |
| 509E26000 GALVANIZED STEEL REINFORCEMENT | 114,538 LB | $1.75 | $200k | 4% |
| 503E31500 STRUCTURAL EXCAVATION, MISC.:FORWARD ABUTMENT | 1 LS | $200,000 | $200k | 4% |
| 840E23000 SELECT GRANULAR BACKFILL | 2,817 CY | $55 | $155k | 3% |
| 526E30011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA | 259 SY | $425 | $110k | 2% |