BEL-US 40/VAR-27.47/VAR
BEL County · est $2.1M
Bid dateThursday, September 12—
BEL County · est $2.1M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 41 more items below.
| Item | Quantity | R1Nls Paving, INC | R2Shelly & Sands INC | R3Cast & Baker Corporation | % of bid |
|---|---|---|---|---|---|
| 441E10100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, | 1,656 CY | $270 | $250 | $331 | 19% |
| 253E02001 PAVEMENT REPAIR, AS PER PLAN | 550 CY | $600 | $625 | $650 | 14% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, | 1,376 CY | $235 | $225 | $286 | 13% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1, | 962 CY | $235 | $225 | $305 | 9% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $220,000 | $276,510 | $115,000 | 9% |
| 441E10200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, | 608 CY | $230 | $225 | $280 | 6% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE 2 1/4" | 34,634 SY | $3.50 |
| Item | Quantity | R1Nls Paving, INC | R2Shelly & Sands INC | R3Cast & Baker Corporation |
|---|---|---|---|---|
| 202E32000 CURB REMOVED | 18 FT | $45.00 | $23.00 | $92.00 |
| 202E52990 SPECIAL - PARKING BLOCK REMOVED | 230 EACH | $35.00 | $35.00 | $37.00 |
| 209E60500 LINEAR GRADING | 1.25 MILE | $5,500 | $14,000 | $10,500 |
| 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA | 1.32 MILE | $5,500 | $8,500 | $10,200 |
| 607E98000 FENCE, MISC.:TEMPORARY ORANGE PLASTIC CONSTRUCTION | 1,022 FT | $5.50 | $3.70 | $9.00 |
| 608E52000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $5.00 |
| $3.65 |
| 5% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100,000 | $119,000 | 4% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE 1 1/2" | 33,049 SY | $2.40 | $3.50 | $3.40 | 3% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR | 110 CY | $620 | $695 | $475 | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE 3" | 12,470 SY | $4.50 | $5.00 | $3.80 | 2% |
| 690E50500 SPECIAL - CONCRETE PARKING BLOCK | 219 EACH | $200 | $200 | $210 | 2% |
| 253E02000 PAVEMENT REPAIR | 60 CY | $700 | $680 | $485 | 2% |
| 202E30000 WALK REMOVED | 805 SF | $40.00 | $21.00 | $21.00 | 1% |
| 608E53021 DETECTABLE WARNING, AS PER PLAN | 397 SF | $80.00 | $73.00 | $58.00 | 1% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 350 HOUR | $90.00 | $80.00 | $80.00 | 1% |
| 407E20000 NON-TRACKING TACK COAT | 9,429 GAL | $3.30 | $4.00 | $3.70 | 1% |
| 441E70501 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), | 60 CY | $500 | $900 | $735 | 1% |
| 646E10200 CENTER LINE | 3.76 MILE | $7,150 | $5,000 | $7,525 | 1% |
| 202E23500 WEARING COURSE REMOVED | 1,670 SY | $15.00 | $12.00 | $7.50 | 1% |
| 430 SF |
| $55.00 |
| $38.00 |
| $38.00 |
| 623E39500 MONUMENT ASSEMBLY ADJUSTED TO GRADE | 3 EACH | $1,150 | $4,000 | $1,632 |
| 623E39601 MONUMENT ASSEMBLY RECONSTRUCTED TO GRADE, AS PER P | 1 EACH | $3,750 | $6,800 | $6,250 |
| 659E98000 SEEDING, MISC.:CURB RAMP GRADING RESTORATION | 9 SY | $75.00 | $350 | $275 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 60 FT | $15.00 | $125 | $20.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE 1 1/4" | 84 SY | $18.50 | $35.00 | $240 |
| 254E01010 PAVEMENT PLANING, PORTLAND CEMENT CONCRETE 1 1/4" | 267 SY | $33.50 | $13.00 | $18.00 |
| 408E10001 PRIME COAT, AS PER PLAN | 568 GAL | $4.75 | $7.00 | $13.65 |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 101 CY | $160 | $160 | $270 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 30.4 FT | $35.00 | $35.00 | $37.00 |
| 630E80100 SIGN, FLAT SHEET | 16.5 SF | $60.00 | $60.00 | $65.00 |
| 630E97700 SIGNING, MISC.: ADA SIGN ASSEMBLY | 11 EACH | $275 | $275 | $290 |
| 632E26500 DETECTOR LOOP | 8 EACH | $1,900 | $1,900 | $2,750 |
| 632E65200 LOOP DETECTOR LEAD-IN CABLE | 80 FT | $1.00 | $1.00 | $2.65 |
| 642E01200 PARKING LOT STALL MARKING, TYPE 1 | 5,980 FT | $1.75 | $1.75 | $1.85 |
| 642E01702 HANDICAP SYMBOL MARKING, TYPE 1 | 11 EACH | $195 | $195 | $93.00 |
| 646E10010 EDGE LINE, 6" | 1.4 MILE | $6,255 | $4,000 | $6,585 |
| 646E10100 LANE LINE, 4" | 0.05 MILE | $6,255 | $2,500 | $6,585 |
| 646E10300 CHANNELIZING LINE, 8" | 1,211 FT | $2.80 | $3.25 | $3.00 |
| 646E10400 STOP LINE | 365 FT | $13.50 | $15.00 | $14.00 |
| 646E10510 CROSSWALK LINE, 12" | 1,466 FT | $9.40 | $10.00 | $10.00 |
| 646E10520 CROSSWALK LINE, 24" | 74 FT | $14.50 | $12.00 | $15.00 |
| 646E10800 ISLAND MARKING | 191 SF | $7.35 | $6.75 | $8.00 |
| 646E20000 RAILROAD SYMBOL MARKING | 1 EACH | $750 | $750 | $1,000 |
| 646E20300 LANE ARROW | 44 EACH | $195 | $175 | $205 |
| 646E20320 WRONG WAY ARROW | 3 EACH | $330 | $275 | $350 |
| 614E12460 WORK ZONE MARKING SIGN | 22 EACH | $98.00 | $98.00 | $100 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 0.18 MILE | $4,250 | $4,550 | $5,400 |
| 614E21500 WORK ZONE CENTER LINE, CLASS II, 642 PAINT | 10.24 MILE | $750 | $3,200 | $715 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 10.24 MILE | $1,150 | $1,175 | $1,270 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 2,823 FT | $0.95 | $1.10 | $1.30 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 1,158 FT | $4.75 | $5.00 | $5.50 |
| 900E00100 RAILROAD FLAGGING SERVICES | 7,000 EACH | $1.00 | $1.00 | $1.00 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $7,500 | $6,000 | $11,500 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $15,003 | $10,000 | $21,750 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E10100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, | 1,656 CY | $270 | $447k | 17% |
| 253E02001 PAVEMENT REPAIR, AS PER PLAN | 550 CY | $600 | $330k | 13% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, | 1,376 CY | $235 | $323k | 12% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1, | 962 CY | $235 | $226k | 9% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $220,000 | $220k | 8% |
| 441E10200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, | 608 CY | $230 | $140k | 5% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE 2 1/4" | 34,634 SY | $3.5 | $121k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 4% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE 1 1/2" | 33,049 SY | $2.4 | $79k | 3% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR | 110 CY | $620 | $68k | 3% |