FRA-SR 161-15.80 Noise Abatement
FRA County · est $8.6M
Bid dateThursday, September 26—
FRA County · est $8.6M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 71 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Complete General Construction Company | R3Kokosing Construction Company INC | R4George J Igel & CO INC | R5Ruhlin Company | R6Sunesis Construction CO | % of bid |
|---|---|---|---|---|---|---|---|---|
| 606E10210 SPECIAL - NOISE BARRIER (REFLECTIVE) | 115,010 SF | $33.25 | $35.50 | $36.50 | $41.25 | $40.00 | $45.00 | 52% |
| 622E90000 BARRIER, MISC.: 81" SINGLE SLOPE BARRIER | 3,743 FT | $225 | $225 | $225 | $196 | $223 | $249 | 12% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $277,000 | $110,000 |
| Item | Quantity | R1Shelly & Sands INC | R2Complete General Construction Company | R3Kokosing Construction Company INC | R4George J Igel & CO INC | R5Ruhlin Company | R6Sunesis Construction CO |
|---|---|---|---|---|---|---|---|
| 202E38000 GUARDRAIL REMOVED | 1,262 FT | $2.80 | $2.00 | $2.80 | $2.80 | $2.80 | $3.00 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 1 EACH | $155 | $142 | $155 | $155 | $155 | $412 |
| 202E75000 FENCE REMOVED | 4,001 FT | $2.75 | $3.00 | $5.80 | $4.63 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $244,325 |
| $186,000 |
| $269,660 |
| $168,600 |
| 4% |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $235,000 | $75,000 | $100,000 | $85,000 | $145,000 | $72,000 | 3% |
| 622E90200 BARRIER, MISC.: 81" SINGLE SLOPE BARRIER END ANCHO | 29 EACH | $7,700 | $7,500 | $5,000 | $7,035 | $7,364 | $6,000 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $200,000 | $428,000 | $434,000 | $296,000 | $228,900 | $219,769 | 3% |
| 452E13010 9" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 1,915 SY | $100 | $70.00 | $130 | $133 | $96.00 | $126 | 3% |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 9,383 FT | $20.00 | $25.00 | $16.00 | $15.75 | $19.00 | $13.00 | 3% |
| 622E90200 BARRIER, MISC.: 81" CONCRETE BARRIER END SECTION | 6 EACH | $30,250 | $20,000 | $21,000 | $20,000 | $27,865 | $13,000 | 2% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 13,700 FT | $13.00 | $27.00 | $10.00 | $12.00 | $16.00 | $24.00 | 2% |
| 611E99500 INLET, MISC.: INLET NO. 3 FOR 81" SINGLE SLOPE BAR | 11 EACH | $15,000 | $14,000 | $15,600 | $18,819 | $19,400 | $16,224 | 2% |
| 832E30000 EROSION CONTROL | 142,257 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 203E10000 EXCAVATION | 3,298 CY | $42.00 | $80.00 | $70.00 | $65.00 | $47.00 | $35.00 | 2% |
| 304E20000 AGGREGATE BASE | 998 CY | $120 | $95.00 | $135 | $100 | $81.00 | $156 | 2% |
| 619E16010 FIELD OFFICE, TYPE B | 24 MNTH | $3,100 | $1,800 | $1,800 | $3,200 | $4,200 | $1,350 | 1% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3" | 4,822 SY | $15.00 | $13.00 | $15.00 | $5.35 | $5.25 | $7.00 | 1% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 96 SNMT | $750 | $1,250 | $530 | $750 | $750 | $750 | 1% |
| 442E22101 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 189 CY | $330 | $470 | $650 | $400 | $344 | $344 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $60,000 | $25,000 | $30,000 | $92,000 | $55,000 | $62,235 | 1% |
| 622E90200 BARRIER, MISC.: BARRIER DRAINAGE WINDOW SECTION | 6 EACH | $9,500 | $15,000 | $7,500 | $11,500 | $10,763 | $8,290 | 1% |
| $2.75 |
| $3.00 |
| 203E20000 EMBANKMENT | 684 CY | $18.00 | $30.00 | $20.00 | $40.00 | $32.00 | $13.00 |
| 203E98000 ROADWAY, MISC.: TEMPORARY OVER-STEEPENED FILL | 67 CY | $42.00 | $167 | $18.00 | $70.00 | $192 | $69.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 362 FT | $25.00 | $22.00 | $25.00 | $25.00 | $25.00 | $26.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 3 EACH | $2,500 | $2,640 | $2,500 | $2,500 | $2,500 | $2,571 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $2,500 | $2,520 | $2,500 | $2,500 | $2,500 | $2,571 |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 1 EACH | $400 | $640 | $400 | $400 | $400 | $411 |
| 606E60022 IMPACT ATTENUATOR, TYPE 2 (UNIDIRECTIONAL). | 1 EACH | $25,500 | $40,000 | $28,523 | $35,753 | $25,500 | $26,229 |
| 607E35000 FENCE REMOVED AND REBUILT | 201 FT | $62.00 | $44.00 | $62.00 | $62.00 | $62.00 | $62.00 |
| 607E98000 FENCE, MISC.: WHITE SPLIT RAIL FENCE | 80 FT | $54.00 | $72.00 | $54.00 | $54.00 | $54.00 | $54.00 |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $15,500 | $14,125 | $50,000 | $17,000 | $36,000 | $7,896 |
| 607E98000 FENCE, MISC.:, TEMPORARY FENCE | 4,202 FT | $4.50 | $6.50 | $6.00 | $4.31 | $4.86 | $5.00 |
| 202E22900 APPROACH SLAB REMOVED | 3 SY | $100 | $310 | $169 | $200 | $275 | $170 |
| 202E23000 PAVEMENT REMOVED | 486 SY | $11.00 | $30.00 | $25.30 | $20.00 | $40.00 | $18.00 |
| 659E00100 SOIL ANALYSIS TEST | 1 EACH | $125 | $125 | $150 | $439 | $125 | $125 |
| 659E00300 TOPSOIL | 1,899 CY | $18.00 | $40.00 | $85.00 | $30.00 | $28.75 | $28.00 |
| 659E00590 SEEDING AND MULCHING, CLASS 6 | 955 SY | $5.00 | $4.94 | $3.03 | $5.79 | $4.94 | $6.00 |
| 659E10000 SEEDING AND MULCHING | 7,985 SY | $0.90 | $0.89 | $0.70 | $3.34 | $0.89 | $2.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 400 SY | $0.80 | $0.80 | $3.40 | $3.40 | $0.80 | $1.00 |
| 659E15000 INTER-SEEDING | 400 SY | $0.80 | $0.80 | $3.40 | $3.40 | $0.80 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 1.08 TON | $950 | $949 | $1,720 | $1,720 | $949 | $949 |
| 659E31000 LIME | 1.65 ACRE | $155 | $153 | $630 | $630 | $153 | $153 |
| 659E35000 WATER | 45 MGAL | $1.00 | $1.00 | $5.00 | $5.00 | $1.00 | $1.00 |
| 670E00500 SLOPE EROSION PROTECTION | 9,090 SY | $1.35 | $1.35 | $2.00 | $1.75 | $1.35 | $1.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $2,500 | $2,500 | $2,500 | $2,325 | $2,500 | $2,325 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $23,000 | $24,200 | $20,000 | $25,250 | $16,050 | $19,200 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $19,000 | $20,000 | $17,000 | $19,000 | $19,000 | $18,905 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 247 SY | $80.00 | $100 | $75.00 | $77.00 | $130 | $132 |
| 602E20000 CONCRETE MASONRY | 2.43 CY | $3,500 | $5,000 | $5,800 | $2,688 | $2,500 | $3,927 |
| 605E31100 AGGREGATE DRAINS | 50 FT | $19.00 | $12.00 | $18.00 | $50.50 | $25.00 | $12.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 557 FT | $25.00 | $50.00 | $40.00 | $21.00 | $53.00 | $25.00 |
| 611E06100 15" CONDUIT, TYPE C | 339 FT | $120 | $175 | $155 | $124 | $178 | $112 |
| 611E06700 15" CONDUIT, TYPE F | 83 FT | $130 | $200 | $145 | $137 | $156 | $81.00 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 31 EACH | $400 | $350 | $690 | $635 | $600 | $356 |
| 407E10000 TACK COAT | 219 GAL | $4.00 | $2.65 | $3.50 | $2.00 | $4.90 | $5.00 |
| 407E20000 NON-TRACKING TACK COAT | 760 GAL | $4.00 | $4.00 | $2.85 | $8.30 | $4.90 | $5.00 |
| 442E22300 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP | 189 CY | $285 | $440 | $595 | $360 | $315 | $315 |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 430 SY | $80.00 | $105 | $130 | $114 | $177 | $101 |
| 609E24000 CURB, TYPE 4-A | 108 FT | $70.00 | $39.00 | $45.00 | $26.30 | $131 | $15.00 |
| 872E10000 VOID REDUCING ASPHALT MEMBRANE (VRAM) | 4,401 FT | $3.00 | $4.00 | $3.85 | $3.85 | $4.04 | $5.00 |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 4,401 FT | $2.00 | $3.00 | $1.98 | $2.50 | $2.30 | $2.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 6.7 FT | $25.00 | $35.00 | $25.00 | $25.00 | $25.00 | $25.00 |
| 630E07000 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W8X18 | 39.9 FT | $42.00 | $95.00 | $42.00 | $42.00 | $42.00 | $42.00 |
| 630E74601 OVERHEAD SIGN SUPPORT, INSTALLATION ONLY, AS PER P | 1 EACH | $3,500 | $8,650 | $3,500 | $3,500 | $3,500 | $7,509 |
| 630E81020 CONCRETE MEDIAN BARRIER SIGN BRACKET | 2 EACH | $1,000 | $775 | $1,000 | $1,000 | $1,000 | $100 |
| 630E82000 SIGN BACKING ASSEMBLY | 1 EACH | $200 | $225 | $200 | $200 | $200 | $200 |
| 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION | 2 EACH | $2,000 | $1,025 | $2,000 | $2,000 | $2,000 | $2,000 |
| 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION | 1 EACH | $11,500 | $8,150 | $11,500 | $11,500 | $11,500 | $11,500 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 3 EACH | $175 | $75.00 | $175 | $175 | $175 | $175 |
| 630E85600 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND REERECTIO | 1 EACH | $725 | $190 | $725 | $725 | $725 | $725 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $50.00 | $15.00 | $50.00 | $50.00 | $50.00 | $50.00 |
| 630E86102 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT | 2 EACH | $500 | $195 | $500 | $500 | $500 | $500 |
| 633E67201 CONTROLLER WORK PAD, AS PER PLAN | 1 EACH | $1,500 | $10,000 | $1,800 | $5,141 | $1,500 | $750 |
| 807E13110 WET REFLECTIVE SPRAY THERMOPLASTIC PAVEMENT MARKIN | 0.45 MILE | $15,630 | $8,500 | $8,500 | $8,500 | $8,500 | $14,056 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 4 SF | $500 | $1,500 | $400 | $910 | $1,400 | $258 |
| 690E98000 SPECIAL - UTILITY TEST HOLE (CITY OF COLUMBUS DIVI | 1 EACH | $2,100 | $3,500 | $3,000 | $2,000 | $7,750 | $4,865 |
| 690E98000 SPECIAL - UTILITY TEST HOLE (COLUMBIA GAS) | 2 EACH | $2,100 | $2,000 | $3,000 | $2,000 | $7,750 | $4,537 |
| 690E98000 SPECIAL - UTILITY TEST HOLE (TC ENERGY) | 2 EACH | $2,100 | $2,000 | $3,000 | $2,000 | $7,750 | $4,537 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 300 HOUR | $104 | $95.00 | $130 | $100 | $90.00 | $115 |
| 614E11630 INCREASED BARRIER DELINEATION | 5,735 FT | $0.50 | $2.30 | $1.60 | $0.35 | $2.20 | $2.00 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,250 | $5,869 | $9,600 | $4,500 | $2,250 | $2,285 |
| 614E12420 DETOUR SIGNING | 1 LS | $10,125 | $10,000 | $25,000 | $15,000 | $10,125 | $10,125 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (ONE-WAY) | 119 EACH | $6.00 | $12.00 | $10.00 | $12.39 | $12.00 | $13.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 119 EACH | $15.00 | $18.00 | $16.50 | $21.05 | $18.50 | $21.00 |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 0.63 MILE | $11,410 | $19,275 | $10,763 | $11,410 | $9,720 | $11,410 |
| 614E24402 WORK ZONE DOTTED LINE, CLASS I, 6", 740.06, TYPE I | 780 FT | $1.45 | $3.78 | $1.37 | $1.45 | $3.15 | $1.00 |
| 616E10000 WATER | 50 MGAL | $40.00 | $200 | $75.00 | $62.00 | $125 | $13.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $44,500 | $43,000 | $50,000 | $35,500 | $45,000 | $40,434 |
| 690E21000 SPECIAL - SURVEY CONTROL VERIFICATION | 1 LS | $4,500 | $2,000 | $5,000 | $6,000 | $55,000 | $38,472 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 606E10210 SPECIAL - NOISE BARRIER (REFLECTIVE) | 115,010 SF | $33.25 | $3.82M | 48% |
| 622E90000 BARRIER, MISC.: 81" SINGLE SLOPE BARRIER | 3,743 FT | $225 | $842k | 11% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $277,000 | $277k | 3% |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $235,000 | $235k | 3% |
| 622E90200 BARRIER, MISC.: 81" SINGLE SLOPE BARRIER END ANCHO | 29 EACH | $7,700 | $223k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $200,000 | $200k | 3% |
| 452E13010 9" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 1,915 SY | $100 | $192k | 2% |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 9,383 FT | $20 | $188k | 2% |
| 622E90200 BARRIER, MISC.: 81" CONCRETE BARRIER END SECTION | 6 EACH | $30,250 | $182k | 2% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 13,700 FT | $13 | $178k | 2% |