HAM-IR 74-08.38/09.11
HAM County · est $3.8M
Bid dateThursday, October 17—
HAM County · est $3.8M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 35 more items below.
| Item | Quantity | R1Elite Contractors INC | R2360 Construction Company INC | R3Titan Industrial Services INC | R4Kmx Painting INC | R5Corrosion Resistance LTD | R6Euro Paint LLC | R7Apbn INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 79,620 SF | $8.00 | $10.00 | $10.89 | $10.00 | $9.20 | $15.50 | $13.00 | 24% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 79,420 SF | $8.00 | $10.00 | $11.65 | $10.00 | $9.05 | $15.50 | $13.00 | 24% |
| 514E00056 |
| Item | Quantity | R1Elite Contractors INC | R2360 Construction Company INC | R3Titan Industrial Services INC | R4Kmx Painting INC | R5Corrosion Resistance LTD | R6Euro Paint LLC | R7Apbn INC |
|---|---|---|---|---|---|---|---|---|
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $2,000 | $60,000 | $20,000 | $8,000 | $15,000 | $5,000 | $40,000 |
| 202E38000 GUARDRAIL REMOVED | 500 FT | $10.00 | $2.40 | $2.88 | $3.00 | $2.20 | $10.00 | $2.40 |
| 202E42206 ANCHOR ASSEMBLY REMOVED | 2 EACH |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 79,620 SF |
| $1.35 |
| $2.00 |
| $1.52 |
| $3.00 |
| $2.00 |
| $4.40 |
| $5.00 |
| 4% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 79,620 SF | $1.35 | $2.00 | $1.52 | $3.00 | $2.20 | $4.40 | $5.00 | 4% |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 79,620 SF | $1.35 | $1.00 | $1.52 | $2.00 | $2.65 | $4.40 | $5.00 | 4% |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 79,420 SF | $1.35 | $2.00 | $1.68 | $3.00 | $2.00 | $4.40 | $5.00 | 4% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 79,420 SF | $1.35 | $2.00 | $1.68 | $3.00 | $2.20 | $4.40 | $5.00 | 4% |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 79,420 SF | $1.35 | $1.00 | $1.68 | $2.00 | $2.65 | $4.40 | $5.00 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100,000 | $40,740 | $250,000 | $135,000 | $328,800 | $575,700 | 4% |
| 622E41100 PORTABLE BARRIER, UNANCHORED(WT:39) | 3,000 FT | $32.03 | $10.03 | $38.44 | $33.00 | $16.80 | $32.03 | $32.03 | 4% |
| 514E27702 FIELD PAINTING, MISC.: FIELD PAINTING OF DAMAGED S | 446 EACH | $200 | $400 | $736 | $1,200 | $1,975 | $897 | $1,400 | 3% |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 1,586 SY | $40.00 | $28.00 | $38.22 | $32.00 | $45.00 | $65.00 | $45.00 | 2% |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 1,586 SY | $40.00 | $28.00 | $38.22 | $32.00 | $45.00 | $65.00 | $45.00 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $50,000 | $40,000 | $38,524 | $80,000 | $42,400 | $67,000 | $60,000 | 2% |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 1,579 SY | $30.00 | $20.00 | $38.22 | $32.00 | $45.00 | $65.00 | $40.00 | 2% |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 1,575 SY | $30.00 | $20.00 | $38.22 | $32.00 | $45.00 | $65.00 | $40.00 | 2% |
| 513E95030 STRUCTURAL STEEL, MISC.: WELDING CROSSFRAME STIFFE | 368 EACH | $110 | $150 | $150 | $250 | $450 | $110 | $110 | 2% |
| 513E95030 STRUCTURAL STEEL, MISC.: WELDING CROSSFRAME STIFFE | 350 EACH | $109 | $150 | $150 | $120 | $475 | $109 | $109 | 1% |
| 513E95030 STRUCTURAL STEEL, MISC.: WELDING CROSSFRAME STIFFE | 350 EACH | $109 | $150 | $150 | $110 | $475 | $109 | $109 | 1% |
| 513E95030 STRUCTURAL STEEL, MISC.: STEEL PREPARATION, INSPEC | 78 EACH | $447 | $435 | $522 | $700 | $1,140 | $447 | $447 | 1% |
| $150 |
| $145 |
| $174 |
| $150 |
| $120 |
| $150 |
| $145 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 3 EACH | $250 | $120 | $144 | $130 | $100 | $250 | $120 |
| 202E47800 IMPACT ATTENUATOR REMOVED | 2 EACH | $350 | $165 | $198 | $170 | $125 | $350 | $165 |
| 606E13000 GUARDRAIL, TYPE 5 | 500 FT | $27.50 | $18.40 | $22.08 | $20.00 | $19.20 | $27.50 | $18.40 |
| 606E26500 ANCHOR ASSEMBLY, TYPE T | 2 EACH | $1,725 | $1,120 | $1,344 | $1,200 | $1,220 | $1,725 | $1,120 |
| 606E35000 BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 3 EACH | $3,425 | $1,880 | $2,256 | $2,000 | $1,960 | $3,425 | $1,880 |
| 606E60012 IMPACT ATTENUATOR, TYPE 1 (BIDIRECTIONAL) (CAT SYS | 2 EACH | $5,750 | $5,360 | $6,432 | $5,500 | $5,540 | $5,750 | $5,360 |
| 832E30000 EROSION CONTROL | 12,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 644E00104 EDGE LINE, 6" | 0.15 MILE | $28,450 | $28,450 | $34,145 | $30,000 | $28,450 | $28,450 | $28,450 |
| 646E10010 EDGE LINE, 6" | 0.53 MILE | $11,560 | $11,560 | $13,872 | $12,000 | $11,560 | $11,560 | $11,560 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 250 HOUR | $50.00 | $80.00 | $75.00 | $55.00 | $100 | $80.00 | $100 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,054 | $2,054 | $3,468 | $3,000 | $2,054 | $2,054 | $2,054 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (UNI-DIRECTIONAL) | 60 EACH | $11.89 | $11.89 | $14.27 | $12.00 | $11.89 | $11.89 | $11.89 |
| 614E13350 OBJECT MARKER, ONE WAY | 60 EACH | $19.94 | $19.94 | $23.93 | $20.00 | $19.94 | $19.94 | $19.94 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 6 SNMT | $944 | $944 | $1,133 | $1,000 | $944 | $944 | $944 |
| 690E98400 SPECIAL - MISC.: WORK INVOLVING ASBESTOS CONTAININ | 1 LS | $10,000 | $500 | $500 | $3,000 | $1,600 | $20,000 | $75.00 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $30,000 | $18,000 | $5,000 | $5,000 | $30,000 | $30,000 | $30,000 |
| 511E34410 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 2 CY | $8,500 | $6,800 | $10,200 | $9,000 | $10,000 | $10,000 | $10,000 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 54 MNHR | $75.00 | $150 | $150 | $200 | $40.00 | $100 | $100 |
| 514E10000 FINAL INSPECTION REPAIR | 35 EACH | $200 | $150 | $150 | $250 | $250 | $100 | $100 |
| 518E12700 SCUPPER, VERTICAL EXTENSION | 56 EACH | $543 | $550 | $660 | $1,000 | $543 | $543 | $591 |
| 519E12300 PATCHING CONCRETE BRIDGE DECK - TYPE B | 5 SY | $1,350 | $2,100 | $1,620 | $1,500 | $1,250 | $1,250 | $1,250 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $30,000 | $18,000 | $5,000 | $5,000 | $30,000 | $30,000 | $30,000 |
| 511E34410 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 2 CY | $8,500 | $6,800 | $10,200 | $9,000 | $10,000 | $10,000 | $10,000 |
| 513E95030 STRUCTURAL STEEL, MISC.: DRILLING STRUCTURAL STEEL | 6 EACH | $663 | $125 | $120 | $1,000 | $663 | $663 | $663 |
| 513E95030 STRUCTURAL STEEL, MISC.: STEEL PREPARATION, INSPEC | 6 EACH | $910 | $435 | $522 | $1,000 | $3,900 | $910 | $910 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 54 MNHR | $75.00 | $150 | $150 | $200 | $45.00 | $100 | $100 |
| 514E10000 FINAL INSPECTION REPAIR | 34 EACH | $200 | $150 | $150 | $250 | $250 | $100 | $100 |
| 518E12700 SCUPPER, VERTICAL EXTENSION | 56 EACH | $543 | $550 | $660 | $1,000 | $543 | $543 | $591 |
| 513E95030 STRUCTURAL STEEL, MISC.: DRILLING STRUCTURAL STEEL | 78 EACH | $299 | $125 | $120 | $500 | $299 | $299 | $299 |
| 514E10000 FINAL INSPECTION REPAIR | 6 EACH | $300 | $500 | $150 | $500 | $250 | $100 | $100 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $26,265 | $162,000 | $54,850 | $340,000 | $98,000 | $148,000 | $563,076 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $2,000 | $100 | $3,360 | $8,000 | $1,500 | $1,500 | $4,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 79,620 SF | $8 | $637k | 21% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 79,420 SF | $8 | $635k | 21% |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 79,620 SF | $1.35 | $107k | 4% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 79,620 SF | $1.35 | $107k | 4% |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 79,620 SF | $1.35 | $107k | 4% |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 79,420 SF | $1.35 | $107k | 4% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 79,420 SF | $1.35 | $107k | 4% |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 79,420 SF | $1.35 | $107k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 3% |
| 622E41100 PORTABLE BARRIER, UNANCHORED(WT:39) | 3,000 FT | $32.03 | $96k | 3% |