CUY-IR 480-17.87WN/17.90ES Decks
CUY County · est $7.9M
Bid dateThursday, October 31—
CUY County · est $7.9M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 123 more items below.
| Item | Quantity | R1Great Lakes Construction CO | R2Ruhlin Company | % of bid |
|---|---|---|---|---|
| 614E15000 SPECIAL - CALENDAR DAYS OF CONTRACT TIME FOR OPENI | 12,000 DLR | $129 | $185 | 23% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $605,000 | $420,000 | 9% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $600,000 | $440,000 | 9% |
| 511E34447 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK, AS PER | 461 CY | $1,140 | $1,000 | 8% |
| 511E34447 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK, AS PER | 437 CY | $1,145 | $1,000 | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $426,500 | $335,000 | 6% |
| 624E10000 MOBILIZATION | 1 LS | $383,000 | $355,000 | 6% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 165,149 LB | $1.45 | $1.50 | 4% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 156,810 LB | $1.45 | $1.50 | 3% |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $170,000 | $65,000 | 3% |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $170,000 | $65,000 | 3% |
| 511E45710 CLASS QC1 CONCRETE, ABUTMENT | 103 CY | $1,555 | $1,100 | 2% |
| 511E45710 CLASS QC1 CONCRETE, ABUTMENT | 105 CY | $1,525 | $1,100 | 2% |
| 869E00100 HIGH LOAD MULTI-ROTATIONAL (HLMR) BEARINGS | 24 EACH | $6,500 | $10,000 | 2% |
| 869E00100 HIGH LOAD MULTI-ROTATIONAL (HLMR) BEARINGS | 24 EACH | $6,500 | $10,000 | 2% |
| 442E22101 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 555 CY | $275 | $325 | 2% |
| 514E00201 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 1 LS | $149,000 | $149,000 | 2% |
| 513E10281 STRUCTURAL STEEL MEMBERS, LEVEL 4, AS PER PLAN | 14,619 LB | $10.00 | $11.00 | 2% |
| 514E00201 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 1 LS | $138,000 | $138,000 | 2% |
| 513E10281 STRUCTURAL STEEL MEMBERS, LEVEL 4, AS PER PLAN | 13,080 LB | $10.00 | $10.00 | 2% |
| Item | Quantity | R1Great Lakes Construction CO | R2Ruhlin Company |
|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $75,000 | $125,000 |
| 202E23000 PAVEMENT REMOVED | 1,511 SY | $25.00 | $20.00 |
| 202E38000 GUARDRAIL REMOVED | 745 FT | $2.00 | $4.00 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 2 EACH | $145 | $250 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 1 EACH | $95.00 | $250 |
| 202E42050 ANCHOR ASSEMBLY REMOVED, TYPE B | 3 EACH | $120 | $250 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 4 EACH | $75.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $250 |
| 203E10000 EXCAVATION | 645 CY | $52.00 | $45.00 |
| 203E20000 EMBANKMENT | 150 CY | $37.00 | $55.00 |
| 204E10000 SUBGRADE COMPACTION | 1,729 SY | $2.25 | $4.00 |
| 204E45000 PROOF ROLLING | 2 HOUR | $200 | $550 |
| 209E15001 RESHAPING UNDER GUARDRAIL, AS PER PLAN | 7 STA | $50.00 | $850 |
| 209E60201 LINEAR GRADING, AS PER PLAN | 40 STA | $450 | $400 |
| 606E15050 GUARDRAIL, TYPE MGS | 613 FT | $21.00 | $24.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 5 EACH | $2,520 | $2,700 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $1,370 | $1,450 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $2,580 | $2,400 |
| 601E20011 CRUSHED AGGREGATE SLOPE PROTECTION, AS PER PLAN | 20 CY | $140 | $150 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $150 | $25.00 |
| 659E00300 TOPSOIL | 1,661 CY | $12.00 | $10.00 |
| 659E00510 SEEDING AND MULCHING, CLASS 2 | 14,960 SY | $1.35 | $1.35 |
| 659E14000 REPAIR SEEDING AND MULCHING | 748 SY | $1.35 | $1.35 |
| 659E15000 INTER-SEEDING | 748 SY | $0.25 | $0.25 |
| 659E20000 COMMERCIAL FERTILIZER | 2.09 TON | $250 | $250 |
| 659E31000 LIME | 3.09 ACRE | $25.00 | $25.00 |
| 659E35000 WATER | 83 MGAL | $1.00 | $1.00 |
| 659E40000 MOWING | 33.7 MSF | $25.00 | $25.00 |
| 832E30000 EROSION CONTROL | 60,000 EACH | $1.00 | $1.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $3,500 | $2,500 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $12,000 | $16,000 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $12,000 | $17,000 |
| 605E11110 6" SHALLOW PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 924 FT | $28.00 | $25.00 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 75 FT | $30.00 | $25.00 |
| 611E01500 6" CONDUIT, TYPE F | 75 FT | $55.00 | $35.00 |
| 251E01020 PARTIAL DEPTH PAVEMENT REPAIR (442) | 130 SY | $125 | $150 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (3" DEPTH) | 12,814 SY | $3.15 | $3.20 |
| 302E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 156 CY | $335 | $330 |
| 304E20000 AGGREGATE BASE | 43 CY | $160 | $150 |
| 407E20000 NON-TRACKING TACK COAT | 2,958 GAL | $3.00 | $1.00 |
| 441E70800 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 449 (45 CY | $410 | $380 |
| 442E22300 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP | 555 CY | $230 | $270 |
| 609E24000 CURB, TYPE 4-A | 32 FT | $90.00 | $35.00 |
| 609E24510 CURB, TYPE 4-C | 28 FT | $120 | $40.00 |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 25 CY | $450 | $340 |
| 620E00500 DELINEATOR, POST GROUND MOUNTED | 24 EACH | $255 | $82.16 |
| 620E11000 DELINEATOR, BRACKET MOUNTED | 6 EACH | $285 | $186 |
| 621E00100 RPM | 72 EACH | $97.60 | $97.60 |
| 626E00102 BARRIER REFLECTOR, TYPE 1, BI-DIRECTIONAL | 12 EACH | $12.00 | $11.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BI-DIRECTIONAL | 4 EACH | $14.50 | $11.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 52.5 FT | $12.50 | $15.09 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 141.6 FT | $13.50 | $16.97 |
| 630E08600 SIGN POST REFLECTOR | 8 EACH | $26.00 | $60.39 |
| 630E80100 SIGN, FLAT SHEET | 280.5 SF | $13.65 | $19.80 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 15 EACH | $27.00 | $16.75 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 17 EACH | $29.00 | $22.34 |
| 630E89896 REMOVAL OF TEMPORARY OVERLAY SIGN AND REERECTION | 1 EACH | $410 | $269 |
| 630E97700 SIGNING, MISC.: SOLAR-POWERED RECTANGULAR RAPID FL | 2 EACH | $5,500 | $6,379 |
| 807E12010 WET REFLECTIVE EPOXY PAVEMENT MARKING, EDGE LINE, | 2.1 MILE | $7,815 | $7,815 |
| 850E10010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $2,285 | $2,285 |
| 850E20010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $5,000 | $5,000 |
| 625E32000 GROUND ROD | 2 EACH | $300 | $261 |
| 632E64020 PEDESTAL FOUNDATION | 2 EACH | $1,050 | $962 |
| 519E12300 PATCHING CONCRETE BRIDGE DECK - TYPE B | 100 SY | $400 | $500 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 250 HOUR | $95.00 | $90.00 |
| 614E12421 DETOUR SIGNING, AS PER PLAN | 1 LS | $32,500 | $19,882 |
| 614E12484 WORK ZONE INCREASED PENALTIES SIGN | 6 EACH | $185 | $253 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 57 SNMT | $675 | $750 |
| 616E10000 WATER | 2 MGAL | $50.00 | $150 |
| 622E41101 PORTABLE BARRIER, UNANCHORED, AS PER PLAN | 60 FT | $50.00 | $125 |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 76 SNMT | $515 | $700 |
| 202E22901 APPROACH SLAB REMOVED, AS PER PLAN | 89 SY | $60.00 | $50.00 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $55,000 | $65,000 |
| 509E20001 CONCRETE REINFORCEMENT, REPLACEMENT OF EXISTING CO | 300 LB | $5.00 | $3.00 |
| 509E26000 GALVANIZED STEEL REINFORCEMENT | 3,037 LB | $2.39 | $2.75 |
| 509E30020 NO. 4 DEFORMED GFRP REINFORCEMENT | 21,439 FT | $1.50 | $1.60 |
| 510E10001 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, AS | 685 EACH | $42.00 | $25.00 |
| 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 156 CY | $640 | $500 |
| 511E42510 CLASS QC1 CONCRETE, PIER CAP | 14 CY | $3,005 | $3,800 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 2,143 SY | $20.00 | $32.00 |
| 512E33000 TYPE 2 WATERPROOFING | 13 SY | $35.00 | $45.00 |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 687 SY | $45.00 | $32.00 |
| 513E10201 STRUCTURAL STEEL MEMBERS, LEVEL UF, AS PER PLAN | 2,150 LB | $25.00 | $25.00 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 4,436 EACH | $4.70 | $5.00 |
| 513E21001 TRIMMING OF BEAM END, AS PER PLAN | 2 EACH | $600 | $750 |
| 516E11210 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S | 90 FT | $725 | $800 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 113 SF | $20.00 | $10.00 |
| 518E12300 SCUPPERS, INCLUDING SUPPORTS | 2 EACH | $5,000 | $5,000 |
| 518E20000 PREFABRICATED GEOCOMPOSITE DRAIN | 51 SY | $50.00 | $50.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 28 CY | $160 | $150 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 588 SF | $115 | $155 |
| 526E30010 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 180 SY | $465 | $350 |
| 526E90010 TYPE A INSTALLATION | 82 FT | $325 | $150 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 89 FT | $20.00 | $25.00 |
| 518E40011 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 37 FT | $65.00 | $45.00 |
| 202E22901 APPROACH SLAB REMOVED, AS PER PLAN | 89 SY | $60.00 | $50.00 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $55,000 | $55,000 |
| 509E20001 CONCRETE REINFORCEMENT, REPLACEMENT OF EXISTING CO | 300 LB | $5.00 | $3.00 |
| 509E26000 GALVANIZED STEEL REINFORCEMENT | 2,854 LB | $2.39 | $2.75 |
| 509E30020 NO. 4 DEFORMED GFRP REINFORCEMENT | 22,304 FT | $1.50 | $1.60 |
| 510E10001 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, AS | 664 EACH | $42.00 | $25.00 |
| 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 163 CY | $595 | $500 |
| 511E42510 CLASS QC1 CONCRETE, PIER CAP | 16 CY | $2,790 | $3,800 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 2,206 SY | $20.00 | $32.00 |
| 512E10600 CONCRETE REPAIR BY EPOXY INJECTION | 25 FT | $60.00 | $190 |
| 512E33000 TYPE 2 WATERPROOFING | 12 SY | $35.00 | $45.00 |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 679 SY | $45.00 | $32.00 |
| 513E10201 STRUCTURAL STEEL MEMBERS, LEVEL UF, AS PER PLAN | 2,150 LB | $25.00 | $25.00 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 4,488 EACH | $4.70 | $5.00 |
| 513E21001 TRIMMING OF BEAM END, AS PER PLAN | 2 EACH | $600 | $750 |
| 516E11210 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S | 95 FT | $725 | $800 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 89 SF | $20.00 | $10.00 |
| 518E12300 SCUPPERS, INCLUDING SUPPORTS | 2 EACH | $5,000 | $5,000 |
| 518E20000 PREFABRICATED GEOCOMPOSITE DRAIN | 53 SY | $50.00 | $50.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 28 CY | $160 | $150 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 697 SF | $115 | $155 |
| 526E30010 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 181 SY | $475 | $350 |
| 526E90010 TYPE A INSTALLATION | 91 FT | $380 | $150 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 97 FT | $20.00 | $25.00 |
| 518E40011 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 34 FT | $65.00 | $45.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $80,000 | $61,000 |
| 108E10000 CPM PROGRESS SCHEDULE | 1 LS | $2,000 | $2,500 |
| 619E16021 FIELD OFFICE, TYPE C, AS PER PLAN | 6 MNTH | $6,500 | $6,700 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $50,000 | $75,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 614E15000 SPECIAL - CALENDAR DAYS OF CONTRACT TIME FOR OPENI | 12,000 DLR | $129 | $1.55M | 17% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $605,000 | $605k | 7% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $600,000 | $600k | 7% |
| 511E34447 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK, AS PER | 461 CY | $1,140 | $526k | 6% |
| 511E34447 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK, AS PER | 437 CY | $1,145 | $500k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $426,500 | $427k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $383,000 | $383k | 4% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 165,149 LB | $1.45 | $239k | 3% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 156,810 LB | $1.45 | $227k | 2% |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $170,000 | $170k | 2% |