CUY-IR 271-09.28 Safety (PART 1 AND PART 2)
CUY County · est $16M
Bid dateThursday, December 5—
CUY County · est $16M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 208 more items below.
| Item | Quantity | R1Shelly Company | R2Kokosing Construction Company INC | R3Karvo Companies INC | % of bid |
|---|---|---|---|---|---|
| 442E10301 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 8,762 CY | $255 | $294 | $278 | 20% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $1,608,180 | $876,000 | $1,275,000 | 14% |
| 302E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 6,836 CY | $180 | $195 | $191 | 11% |
| 442E10331 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 2,107 CY | $255 | $294 | $276 | 5% |
| 442E10001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 2,138 CY | $250 | $330 | $290 | 5% |
| 251E01021 PARTIAL DEPTH PAVEMENT REPAIR (442), AS PER PLAN B | 2,606 SY | $200 | $250 | $230 | 5% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 1 | 260,593 SY |
| Item | Quantity | R1Shelly Company | R2Kokosing Construction Company INC | R3Karvo Companies INC |
|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $25,000 | $1,000 | $3,500 |
| 202E23500 WEARING COURSE REMOVED | 81 SY | $15.00 | $33.00 | $28.81 |
| 202E30000 WALK REMOVED | 797 SF | $1.60 | $1.56 | $2.65 |
| 202E30700 CONCRETE BARRIER REMOVED | 129 FT | $40.00 | $39.98 | $48.00 |
| 202E32000 CURB REMOVED | 303 FT | $10.35 | $10.33 | $12.00 |
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $2.00 |
| $2.10 |
| $2.00 |
| 5% |
| 202E23000 PAVEMENT REMOVED | 25,530 SY | $20.00 | $15.00 | $15.65 | 4% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 34,961 FT | $13.00 | $6.00 | $21.29 | 4% |
| 304E20000 AGGREGATE BASE | 5,318 CY | $80.00 | $71.00 | $80.50 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $400,000 | $809,000 | $1,750,000 | 3% |
| 442E10080 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP | 1,660 CY | $220 | $260 | $250 | 3% |
| 251E01021 PARTIAL DEPTH PAVEMENT REPAIR (442), AS PER PLAN A | 4,368 SY | $80.00 | $110 | $94.00 | 3% |
| 442E10031 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 1,237 CY | $250 | $310 | $295 | 3% |
| 605E14020 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 22,201 FT | $13.45 | $14.00 | $11.85 | 3% |
| 630E72340 OVERHEAD SIGN SUPPORT, TYPE TC-12.31, DESIGN 12 | 7 EACH | $35,150 | $35,150 | $39,850 | 2% |
| 251E01021 PARTIAL DEPTH PAVEMENT REPAIR (442), AS PER PLAN B | 1,190 SY | $200 | $250 | $378 | 2% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 5,015 CY | $45.50 | $57.00 | $70.00 | 2% |
| 203E10000 EXCAVATION | 6,984 CY | $32.50 | $36.00 | $28.00 | 2% |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $200,000 | $97,000 | $200,000 | 2% |
| 2,009 FT |
| $21.65 |
| $50.00 |
| $25.50 |
| 202E38000 GUARDRAIL REMOVED | 3,309 FT | $2.00 | $2.00 | $3.00 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 4 EACH | $155 | $155 | $250 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 12 EACH | $95.00 | $95.00 | $250 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 1 EACH | $140 | $140 | $250 |
| 202E47800 IMPACT ATTENUATOR REMOVED | 5 EACH | $245 | $245 | $250 |
| 202E58100 CATCH BASIN REMOVED | 28 EACH | $715 | $800 | $875 |
| 202E58500 CATCH BASIN ABANDONED | 10 EACH | $477 | $1,500 | $555 |
| 202E58700 MANHOLE ABANDONED | 1 EACH | $477 | $1,300 | $650 |
| 202E98200 REMOVAL MISC.: QUICK CURB REMOVED AND DISPOSED | 216 FT | $10.65 | $7.50 | $9.85 |
| 203E20000 EMBANKMENT | 3,204 CY | $8.00 | $5.00 | $9.00 |
| 209E15001 RESHAPING UNDER GUARDRAIL, AS PER PLAN | 40 STA | $60.00 | $60.00 | $145 |
| 209E60201 LINEAR GRADING, AS PER PLAN | 80 STA | $190 | $145 | $625 |
| 606E15050 GUARDRAIL, TYPE MGS | 2,263 FT | $19.20 | $19.20 | $24.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E MASH 2016 | 4 EACH | $2,620 | $2,620 | $2,675 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 7 EACH | $1,395 | $1,395 | $1,525 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $2,625 | $2,625 | $2,350 |
| 606E60002 IMPACT ATTENUATOR, TYPE 1 (UNIDIRECTIONAL) | 4 EACH | $9,250 | $9,250 | $6,250 |
| 608E10000 4" CONCRETE WALK | 290 SF | $8.50 | $7.97 | $7.10 |
| 608E52000 CURB RAMP | 227 SF | $19.00 | $18.61 | $14.00 |
| 609E24510 CURB, TYPE 4-C | 80 FT | $30.00 | $62.43 | $28.75 |
| 609E26000 CURB, TYPE 6 | 121 FT | $60.00 | $58.62 | $30.00 |
| 609E54000 6" CONCRETE TRAFFIC ISLAND | 81 SY | $103 | $103 | $80.00 |
| 622E10160 CONCRETE BARRIER, SINGLE SLOPE, TYPE D | 400 FT | $180 | $148 | $120 |
| 622E25000 CONCRETE BARRIER END SECTION, TYPE D | 4 EACH | $5,000 | $5,301 | $8,700 |
| 622E25050 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 4 EACH | $5,000 | $4,929 | $9,700 |
| 626E00102 BARRIER REFLECTOR, TYPE 1, ONE WAY | 13 EACH | $10.80 | $10.80 | $9.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, ONE WAY | 46 EACH | $12.00 | $12.00 | $13.00 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $300 | $25.00 | $300 |
| 659E00300 TOPSOIL | 3,292 CY | $36.00 | $39.00 | $32.00 |
| 659E10000 SEEDING AND MULCHING | 25,204 SY | $0.90 | $1.00 | $0.90 |
| 659E14000 REPAIR SEEDING AND MULCHING | 1,261 SY | $1.00 | $1.00 | $1.00 |
| 659E15000 INTER-SEEDING | 1,261 SY | $0.10 | $0.10 | $0.01 |
| 659E20000 COMMERCIAL FERTILIZER | 3.53 TON | $1,500 | $250 | $1,500 |
| 659E31000 LIME | 5.21 ACRE | $1.00 | $25.00 | $0.10 |
| 659E35000 WATER | 140 MGAL | $0.50 | $0.25 | $0.01 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $3,000 | $2,535 | $2,535 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $25,000 | $21,000 | $13,440 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $20,000 | $21,000 | $25,000 |
| 832E30000 EROSION CONTROL | 80,000 EACH | $1.00 | $1.00 | $1.00 |
| 605E11110 6" SHALLOW PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 8,060 FT | $15.05 | $17.00 | $14.60 |
| 605E13410 6" UNCLASSIFIED PIPE UNDERDRAINS WITH GEOTEXTILE F | 294 FT | $17.50 | $38.00 | $27.75 |
| 605E13510 6" ROCK CUT UNDERDRAINS WITH GEOTEXTILE FABRIC | 2,400 FT | $19.00 | $15.00 | $19.76 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 1,463 FT | $28.50 | $25.50 | $34.80 |
| 611E05900 15" CONDUIT, TYPE B | 354 FT | $357 | $275 | $305 |
| 611E06100 15" CONDUIT, TYPE C | 477 FT | $347 | $162 | $200 |
| 611E07400 18" CONDUIT, TYPE B | 127 FT | $363 | $370 | $350 |
| 611E08900 21" CONDUIT, TYPE B | 70 FT | $418 | $400 | $270 |
| 611E10400 24" CONDUIT, TYPE B | 42 FT | $436 | $405 | $271 |
| 611E97010 SLOTTED DRAIN, TYPE 2 15" | 379 FT | $225 | $240 | $166 |
| 611E98180 CATCH BASIN, NO. 3A | 1 EACH | $4,839 | $6,350 | $4,500 |
| 611E98370 CATCH BASIN, NO. 6 | 8 EACH | $3,776 | $5,000 | $4,300 |
| 611E98410 CATCH BASIN, NO. 8 | 29 EACH | $6,658 | $9,000 | $7,200 |
| 611E98635 CATCH BASIN RECONSTRUCTED TO GRADE, AS PER PLAN | 3 EACH | $2,616 | $3,500 | $3,300 |
| 611E99574 MANHOLE, NO. 3 | 3 EACH | $7,068 | $7,500 | $7,200 |
| 611E99621 MANHOLE, NO. 5, AS PER PLAN | 1 EACH | $8,263 | $10,500 | $7,700 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 4 EACH | $1,332 | $850 | $800 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 7 EACH | $450 | $425 | $380 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 3,000 LB | $2.50 | $2.55 | $2.00 |
| 670E00700 DITCH EROSION PROTECTION | 5,936 SY | $2.50 | $1.60 | $2.50 |
| 204E10000 SUBGRADE COMPACTION | 31,844 SY | $1.00 | $1.25 | $0.50 |
| 204E13000 EXCAVATION OF SUBGRADE | 5,015 CY | $35.50 | $50.00 | $39.00 |
| 204E50000 GEOTEXTILE FABRIC | 7,502 SY | $1.05 | $1.75 | $1.65 |
| 251E01021 PARTIAL DEPTH PAVEMENT REPAIR (442), AS PER PLAN A | 1,190 SY | $80.00 | $110 | $140 |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN (T | 55,688 SY | $2.00 | $2.25 | $2.62 |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN (T | 4,009 SY | $7.25 | $4.00 | $2.50 |
| 407E20000 NON-TRACKING TACK COAT | 10,030 GAL | $3.00 | $2.85 | $2.90 |
| 441E70801 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 449 (99 CY | $325 | $650 | $500 |
| 442E10031 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 246 CY | $290 | $390 | $285 |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 75 CY | $150 | $150 | $190 |
| 618E40101 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE), AS PER | 25,098 FT | $0.55 | $0.28 | $0.36 |
| 872E10000 VOID REDUCING ASPHALT MEMBRANE (VRAM) | 32,807 FT | $2.10 | $1.90 | $1.90 |
| 441E70101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), AS | 108 CY | $430 | $350 | $595 |
| 620E00500 DELINEATOR, POST GROUND MOUNTED | 52 EACH | $65.00 | $65.00 | $60.00 |
| 620E31200 REMOVAL OF DELINEATOR | 13 EACH | $10.00 | $10.00 | $7.50 |
| 620E60000 DELINEATOR, POST SURFACE MOUNTED | 8 EACH | $135 | $135 | $145 |
| 621E00100 RPM | 461 EACH | $36.50 | $36.50 | $37.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 440 EACH | $4.00 | $2.50 | $1.20 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 316 FT | $16.50 | $16.50 | $16.00 |
| 630E04100 GROUND MOUNTED SUPPORT, NO. 4 POST | 66 FT | $18.00 | $18.00 | $18.00 |
| 630E06400 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, S4X7.7 | 37.2 FT | $35.00 | $35.00 | $40.00 |
| 630E07000 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W8X18 | 42.4 FT | $60.00 | $60.00 | $60.00 |
| 630E07600 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X12 | 42.4 FT | $50.00 | $50.00 | $50.00 |
| 630E08600 SIGN POST REFLECTOR | 8 EACH | $43.00 | $43.00 | $50.00 |
| 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION | 6 EACH | $740 | $740 | $875 |
| 630E72320 OVERHEAD SIGN SUPPORT, TYPE TC-12.31, DESIGN 6 | 2 EACH | $23,900 | $23,900 | $25,150 |
| 630E72330 OVERHEAD SIGN SUPPORT, TYPE TC-12.31, DESIGN 10 | 1 EACH | $32,300 | $32,300 | $33,200 |
| 630E79200 SIGN ATTACHMENT ASSEMBLY, MAST ARM | 3 EACH | $720 | $720 | $725 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 1 EACH | $175 | $175 | $195 |
| 630E80100 SIGN, FLAT SHEET | 219.7 SF | $15.00 | $15.00 | $15.00 |
| 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET | 147 SF | $22.50 | $22.50 | $23.00 |
| 630E80224 SIGN, OVERHEAD EXTRUSHEET | 1,770 SF | $23.00 | $23.00 | $24.00 |
| 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION | 6 EACH | $975 | $975 | $1,050 |
| 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION | 10 EACH | $8,675 | $8,675 | $8,825 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 23 EACH | $15.00 | $15.00 | $20.00 |
| 630E85600 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND REERECTIO | 1 EACH | $420 | $420 | $450 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 25 EACH | $20.00 | $20.00 | $20.00 |
| 630E86102 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT | 6 EACH | $245 | $245 | $275 |
| 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL | 19 EACH | $185 | $185 | $195 |
| 630E89702 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL | 11 EACH | $1,350 | $1,350 | $1,550 |
| 646E10400 STOP LINE | 54 FT | $12.50 | $12.50 | $11.75 |
| 646E10510 CROSSWALK LINE, 12" | 228 FT | $5.50 | $7.50 | $11.00 |
| 646E10620 CHEVRON MARKING | 871 FT | $10.00 | $12.50 | $11.75 |
| 646E20300 LANE ARROW | 30 EACH | $160 | $150 | $175 |
| 646E20320 WRONG WAY ARROW | 4 EACH | $245 | $250 | $275 |
| 807E12010 WET REFLECTIVE EPOXY PAVEMENT MARKING, EDGE LINE, | 6.11 MILE | $4,800 | $3,750 | $4,100 |
| 807E12110 WET REFLECTIVE EPOXY PAVEMENT MARKING, LANE LINE, | 5.35 MILE | $2,875 | $2,250 | $2,100 |
| 807E12310 WET REFLECTIVE EPOXY PAVEMENT MARKING, CHANNELIZIN | 7,882 FT | $2.45 | $2.25 | $2.25 |
| 807E12410 WET REFLECTIVE EPOXY PAVEMENT MARKING, DOTTED LINE | 6,745 FT | $1.50 | $2.00 | $2.00 |
| 850E10010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $2,200 | $1,850 | $2,000 |
| 850E10110 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $1.20 | $1.25 | $1.25 |
| 850E10130 GROOVING FOR 12" RECESSED PAVEMENT MARKING | — | $1.50 | $1.50 | $1.50 |
| 850E20110 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $1.50 | $1.75 | $5.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 280 HOUR | $100 | $115 | $110 |
| 614E11630 INCREASED BARRIER DELINEATION | 9,319 FT | $2.75 | $1.60 | $2.16 |
| 614E12360 WORK ZONE IMPACT ATTENUATOR (REPLACEMENT) (UNIDIRE | 3 EACH | $2,320 | $2,320 | $3,000 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,320 | $2,320 | $2,375 |
| 614E12484 WORK ZONE INCREASED PENALTIES SIGN | 24 EACH | $200 | $200 | $252 |
| 614E12801 WORK ZONE RAISED PAVEMENT MARKER, AS PER PLAN | 1,339 EACH | $35.00 | $6.25 | $26.81 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 50 CY | $450 | $125 | $300 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, ONE WAY | 455 EACH | $7.50 | $15.00 | $11.04 |
| 614E13350 OBJECT MARKER, ONE WAY | 543 EACH | $18.50 | $16.00 | $20.60 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 48 SNMT | $1,000 | $700 | $1,015 |
| 614E20056 WORK ZONE LANE LINE, CLASS I, 6", 807 PAINT | 11.23 MILE | $1,313 | $1,250 | $1,100 |
| 614E20110 WORK ZONE LANE LINE, CLASS I, 6", 642 PAINT | 9.27 MILE | $580 | $750 | $650 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 5.35 MILE | $575 | $750 | $650 |
| 614E22056 WORK ZONE EDGE LINE, CLASS I, 6", 807 PAINT | 16.86 MILE | $2,250 | $2,500 | $850 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 8.92 MILE | $695 | $900 | $2,300 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 6.11 MILE | $665 | $900 | $850 |
| 614E23110 WORK ZONE CHANNELIZING LINE, CLASS I, 12", 807 PAI | 34,350 FT | $1.85 | $2.25 | $1.90 |
| 614E23210 WORK ZONE CHANNELIZING LINE, CLASS I, 12", 642 PAI | 11,156 FT | $0.80 | $0.85 | $1.00 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 7,882 FT | $0.70 | $0.85 | $1.00 |
| 614E24102 WORK ZONE DOTTED LINE, CLASS I, 6", 807 PAINT | 11,232 FT | $0.95 | $1.75 | $1.60 |
| 614E24202 WORK ZONE DOTTED LINE, CLASS I, 6", 642 PAINT | 12,524 FT | $0.55 | $0.65 | $0.60 |
| 614E24612 WORK ZONE DOTTED LINE, CLASS III, 6", 642 PAINT | 6,876 FT | $0.55 | $0.65 | $0.60 |
| 614E25200 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS I, 642 P | 2,449 FT | $1.80 | $3.50 | $3.00 |
| 614E25620 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS III, 642 | 871 FT | $1.80 | $3.50 | $3.00 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 108 FT | $3.00 | $3.50 | $4.00 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 54 FT | $2.90 | $3.50 | $4.00 |
| 614E27050 WORK ZONE CROSSWALK LINE, CLASS I, 12", 642 PAINT | 491 FT | $1.50 | $3.00 | $3.00 |
| 614E27250 WORK ZONE CROSSWALK LINE, CLASS III, 12", 642 PAIN | 228 FT | $1.50 | $3.00 | $3.00 |
| 614E30200 WORK ZONE ARROW, CLASS I, 642 PAINT | 50 EACH | $50.00 | $65.00 | $125 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 34 EACH | $49.00 | $65.00 | $125 |
| 616E10000 WATER | 50 MGAL | $75.00 | $75.00 | $1.00 |
| 622E41060 DUAL PORTABLE BARRIER TRANSITION/TERMINATION | 3 EACH | $1,250 | $2,000 | $6,759 |
| 622E41110 PORTABLE BARRIER, ANCHORED | 1,990 FT | $37.00 | $20.00 | $28.61 |
| 642E30000 REMOVAL OF PAVEMENT MARKING | 7,888 FT | $1.65 | $0.75 | $2.00 |
| 642E30020 REMOVAL OF PAVEMENT MARKING | 5 EACH | $100 | $50.00 | $50.00 |
| 642E30030 REMOVAL OF PAVEMENT MARKING | 9.44 MILE | $1,350 | $1,850 | $2,200 |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 48 SNMT | $600 | $600 | $625 |
| 209E60201 LINEAR GRADING, AS PER PLAN | 450 STA | $60.00 | $130 | $21.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 |
| 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN | 4 EACH | $1,230 | $1,230 | $1,550 |
| 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE | 2 EACH | $2,616 | $2,615 | $2,300 |
| 611E99660 MANHOLE RECONSTRUCTED TO GRADE | 2 EACH | $1,280 | $3,000 | $1,700 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 5,000 LB | $2.50 | $2.45 | $2.00 |
| 407E20000 NON-TRACKING TACK COAT | 22,148 GAL | $3.00 | $2.85 | $3.00 |
| 442E00100 ANTI-SEGREGATION EQUIPMENT | 5,812 CY | $10.00 | $0.50 | $15.50 |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 276 CY | $150 | $150 | $275 |
| 618E40601 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE), AS PER | 12 MILE | $1,875 | $1,140 | $1,140 |
| 850E10110 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $0.45 | $0.35 | $0.35 |
| 850E10130 GROOVING FOR 12" RECESSED PAVEMENT MARKING | — | $1.50 | $1.50 | $1.50 |
| 850E20110 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $1.35 | $1.75 | $1.25 |
| 850E20130 GROOVING FOR 12" RECESSED PAVEMENT MARKING | — | $1.75 | $2.25 | $2.50 |
| 872E10000 VOID REDUCING ASPHALT MEMBRANE (VRAM) | 14,119 FT | $1.90 | $1.90 | $1.90 |
| 620E00500 DELINEATOR, POST GROUND MOUNTED | 354 EACH | $65.00 | $65.00 | $60.00 |
| 621E00100 RPM | 1,342 EACH | $36.50 | $36.50 | $37.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 1,007 EACH | $4.00 | $2.50 | $1.20 |
| 646E10400 STOP LINE | 197 FT | $12.50 | $12.50 | $11.75 |
| 646E10510 CROSSWALK LINE, 12" | 1,048 FT | $5.50 | $7.50 | $11.00 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 91 FT | $10.00 | $12.50 | $11.00 |
| 646E20300 LANE ARROW | 50 EACH | $160 | $150 | $175 |
| 807E12010 WET REFLECTIVE EPOXY PAVEMENT MARKING, EDGE LINE, | 19.17 MILE | $4,800 | $3,750 | $4,100 |
| 807E12110 WET REFLECTIVE EPOXY PAVEMENT MARKING, LANE LINE, | 10.53 MILE | $2,875 | $2,250 | $2,100 |
| 807E12310 WET REFLECTIVE EPOXY PAVEMENT MARKING, CHANNELIZIN | 14,905 FT | $2.45 | $2.25 | $2.25 |
| 807E12410 WET REFLECTIVE EPOXY PAVEMENT MARKING, DOTTED LINE | 6,785 FT | $1.50 | $2.00 | $2.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 300 HOUR | $100 | $115 | $115 |
| 614E12484 WORK ZONE INCREASED PENALTIES SIGN | 18 EACH | $200 | $200 | $252 |
| 614E13001 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, AS PER P | 100 CY | $150 | $125 | $340 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 27 SNMT | $1,000 | $700 | $1,015 |
| 614E20110 WORK ZONE LANE LINE, CLASS I, 6", 642 PAINT | 10.53 MILE | $550 | $750 | $650 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 10.53 MILE | $545 | $750 | $650 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 19.15 MILE | $695 | $900 | $850 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 19.15 MILE | $665 | $900 | $850 |
| 614E23210 WORK ZONE CHANNELIZING LINE, CLASS I, 12", 642 PAI | 14,905 FT | $0.80 | $0.75 | $1.00 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 14,905 FT | $0.70 | $0.75 | $1.00 |
| 614E24202 WORK ZONE DOTTED LINE, CLASS I, 6", 642 PAINT | 6,785 FT | $0.55 | $0.65 | $0.60 |
| 614E24612 WORK ZONE DOTTED LINE, CLASS III, 6", 642 PAINT | 6,785 FT | $0.55 | $0.65 | $0.60 |
| 614E25200 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS I, 642 P | 91 FT | $1.80 | $3.50 | $3.00 |
| 614E25620 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS III, 642 | 91 FT | $1.80 | $3.50 | $3.00 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 197 FT | $3.00 | $3.50 | $4.00 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 197 FT | $2.90 | $3.50 | $4.00 |
| 614E27050 WORK ZONE CROSSWALK LINE, CLASS I, 12", 642 PAINT | 1,048 FT | $1.50 | $3.00 | $3.00 |
| 614E27250 WORK ZONE CROSSWALK LINE, CLASS III, 12", 642 PAIN | 1,048 FT | $1.50 | $3.00 | $3.00 |
| 614E30200 WORK ZONE ARROW, CLASS I, 642 PAINT | 50 EACH | $50.00 | $65.00 | $125 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 50 EACH | $50.00 | $65.00 | $125 |
| 630E97800 SIGNING, MISC.: ADDITIONAL SIGNS, GROUND MOUNTED, | 300 SF | $27.50 | $27.50 | $29.57 |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 39 SNMT | $600 | $600 | $625 |
| 896E00012 PORTABLE NON-INTRUSIVE TRAFFIC SENSOR, CLASS II | 24 SNMT | $1,000 | $825 | $1,323 |
| 896E00021 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 6 SNMT | $1,250 | $1,125 | $1,433 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $150,000 | $50,000 | $150,000 |
| 108E10000 CPM PROGRESS SCHEDULE | 1 LS | $30,000 | $2,500 | $50,000 |
| 619E16021 FIELD OFFICE, TYPE C, AS PER PLAN | 16 MNTH | $3,300 | $3,500 | $7,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E10301 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 8,762 CY | $255 | $2.23M | 14% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $1,608,180 | $1.61M | 10% |
| 302E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 6,836 CY | $180 | $1.23M | 8% |
| 442E10331 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 2,107 CY | $255 | $537k | 3% |
| 442E10001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 2,138 CY | $250 | $535k | 3% |
| 251E01021 PARTIAL DEPTH PAVEMENT REPAIR (442), AS PER PLAN B | 2,606 SY | $200 | $521k | 3% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 1 | 260,593 SY | $2 | $521k | 3% |
| 202E23000 PAVEMENT REMOVED | 25,530 SY | $20 | $511k | 3% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 34,961 FT | $13 | $454k | 3% |
| 304E20000 AGGREGATE BASE | 5,318 CY | $80 | $425k | 3% |