JEF-SR 150/VAR-03.43/VAR
JEF County · est $5.6M
Bid dateThursday, November 14—
JEF County · est $5.6M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 28 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Nls Paving, INC | R3Cast & Baker Corporation | % of bid |
|---|---|---|---|---|---|
| 441E10100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG | 8,537 CY | $195 | $234 | $270 | 32% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (6578 CY | $176 | $214 | $266 | 22% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN , | 218,816 SY | $3.00 | $2.50 | $3.05 | 13% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $401,133 | $245,000 | $275,000 | 8% |
| 253E02000 PAVEMENT REPAIR | 650 CY | $425 | $415 | $525 | 5% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 410 CY | $425 | $450 | $700 | 3% |
| 407E20000 NON-TRACKING TACK COAT | 33,397 GAL | $3.50 |
| Item | Quantity | R1Shelly & Sands INC | R2Nls Paving, INC | R3Cast & Baker Corporation |
|---|---|---|---|---|
| 202E23500 WEARING COURSE REMOVED | 1,794 SY | $3.00 | $5.25 | $7.00 |
| 202E30000 WALK REMOVED | 562 SF | $9.50 | $50.00 | $9.50 |
| 607E98000 FENCE, MISC.: TEMP. ORANGE PLASTIC CONSTRUCTION | 1,000 FT | $7.20 | $4.00 | $7.50 |
| 608E52000 CURB RAMP | 74 SF | $145 | $80.00 | $152 |
| 623E39500 MONUMENT ASSEMBLY ADJUSTED TO GRADE | 4 EACH | $1,300 | $1,200 | $1,350 |
| 623E39601 MONUMENT ASSEMBLY RECONSTRUCTED TO GRADE, AS PER P |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $3.30 |
| $4.25 |
| 2% |
| 624E10000 MOBILIZATION | 1 LS | $97,869 | $75,000 | $145,000 | 2% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 1,096 CY | $85.00 | $80.00 | $127 | 2% |
| 646E10010 EDGE LINE, 6" | 27.72 MILE | $3,148 | $3,350 | $4,150 | 2% |
| 408E10001 PRIME COAT, AS PER PLAN | 12,617 GAL | $5.00 | $4.50 | $6.50 | 1% |
| 646E10200 CENTER LINE | 15.64 MILE | $3,799 | $4,040 | $5,100 | 1% |
| 621E00100 RPM | 1,713 EACH | $31.00 | $37.25 | $37.00 | 1% |
| 614E21500 WORK ZONE CENTER LINE, CLASS II, 642 PAINT | 46.29 MILE | $1,100 | $350 | $815 | 1% |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 46.29 MILE | $950 | $995 | $1,150 | 1% |
| 441E70501 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449) | — | $580 | $540 | $715 | 1% |
| 608E53021 DETECTABLE WARNING, AS PER PLAN | 443 SF | $70.00 | $72.50 | $73.00 | 1% |
| 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA | 27.11 MILE | $1,100 | $2,375 | $1,650 | 1% |
| 617E20001 SHOULDER PREPARATION, AS PER PLAN | 31,540 SY | $0.90 | $0.25 | $1.30 | 1% |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 46 CF | $550 | $535 | $535 | 0% |
| 13 EACH |
| $1,800 |
| $1,300 |
| $1,850 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 4 EACH | $370 | $600 | $375 |
| 690E50200 SPECIAL - MAILBOX SUPPORT SYSTEM, DOUBLE | 2 EACH | $550 | $615 | $560 |
| 659E98000 SEEDING, MISC.: CURB RAMP GRADING RESTORATION | 3 SY | $210 | $100 | $215 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 650 FT | $25.00 | $12.00 | $18.00 |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN , | 1,865 SY | $3.75 | $5.75 | $7.50 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 1,713 EACH | $5.50 | $8.25 | $19.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 2 EACH | $25.00 | $230 | $265 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $35.00 | $230 | $265 |
| 646E10400 STOP LINE | 192 FT | $13.00 | $13.75 | $14.00 |
| 646E10510 CROSSWALK LINE, 12" | 854 FT | $6.00 | $6.40 | $7.00 |
| 646E20000 RAILROAD SYMBOL MARKING | 6 EACH | $600 | $635 | $765 |
| 646E20110 SCHOOL SYMBOL MARKING, 96" | 2 EACH | $585 | $620 | $800 |
| 614E12460 WORK ZONE MARKING SIGN | 174 EACH | $88.00 | $90.00 | $95.00 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 576 FT | $7.00 | $7.25 | $7.50 |
| 900E00100 RAILROAD FLAGGING SERVICES | 21,198 EACH | $1.00 | $1.00 | $1.00 |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 31 CF | $550 | $560 | $560 |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 42 CF | $550 | $540 | $540 |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 23 CF | $600 | $565 | $570 |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 18 CF | $600 | $565 | $570 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $5,500 | $9,600 | $12,500 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $20,500 | $30,000 | $45,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E10100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG | 8,537 CY | $195 | $1.66M | 31% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (6578 CY | $176 | $1.16M | 21% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN , | 218,816 SY | $3 | $656k | 12% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $401,133 | $401k | 7% |
| 253E02000 PAVEMENT REPAIR | 650 CY | $425 | $276k | 5% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 410 CY | $425 | $174k | 3% |
| 407E20000 NON-TRACKING TACK COAT | 33,397 GAL | $3.5 | $117k | 2% |
| 624E10000 MOBILIZATION | 1 LS | $97,869 | $98k | 2% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 1,096 CY | $85 | $93k | 2% |
| 646E10010 EDGE LINE, 6" | 27.72 MILE | $3,148 | $87k | 2% |