HAM-Inverts FY2025
HAM County · est $1.3M
Bid dateThursday, December 5—
HAM County · est $1.3M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 8 more items below.
| Item | Quantity | R1Sunesis Construction CO | R2Bcc Ohio INC | R3Turn-key Tunneling INC | % of bid |
|---|---|---|---|---|---|
| 837E10001 LINER PIPE, AS PER PLAN, 186"x113" ARCH, 748.06, 7 | 250 FT | $2,976 | $3,997 | $4,250 | 37% |
| 611E96550 FIELD PAVING OF EXISTING PIPE, 16'-7"x10'-1" CMP | 876 FT | $372 | $448 | $1,050 | 16% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $239,385 | $128,829 | $75,000 | 12% |
| 611E96550 FIELD PAVING OF EXISTING PIPE, 108" CMP | 374 FT | $293 | $190 | $770 | 5% |
| 611E96550 FIELD PAVING OF EXISTING PIPE, 180" CMP | 278 FT | $383 | $317 | $908 | 5% |
| 611E97700 CONDUIT, MISC.: REPAIR METHOD B | 80 SF | $1,057 | $129 | $150 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $69,416 |
| Item | Quantity | R1Sunesis Construction CO | R2Bcc Ohio INC | R3Turn-key Tunneling INC |
|---|---|---|---|---|
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 10 FT | $18.89 | $23.40 | $54.50 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 1.1 CY | $1,512 | $629 | $3,815 |
| 659E20000 COMMERCIAL FERTILIZER | 1.06 TON | $760 | $683 | $3,052 |
| 659E31000 LIME | 1.62 ACRE | $50.00 | $31.50 | $2,398 |
| 659E35000 WATER | 42.4 MGAL | $35.00 | $1.05 | $1.50 |
| 602E20000 CONCRETE MASONRY | 0.21 CY |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $92,291 |
| $62,300 |
| 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $64,813 | $11,232 | $46,325 | 3% |
| 202E70130 SPECIAL - PIPE CLEANOUT OVER 48" | 1,126 FT | $50.97 | $139 | $310 | 3% |
| 837E21000 BACKFILL FOR LINER PIPE | 250 FT | $212 | $345 | $1,210 | 3% |
| 659E10000 SEEDING AND MULCHING | 7,850 SY | $5.19 | $2.42 | $4.36 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $25,905 | $77,477 | $65,300 | 1% |
| 611E97700 CONDUIT, MISC.: REPAIR METHOD A | 228 SF | $105 | $106 | $150 | 1% |
| 899E10000 CURED-IN-PLACE PIPE LINER, 12" DIAMETER | 132 FT | $141 | $203 | $164 | 1% |
| 611E99574 MANHOLE, NO. 3 | 2 EACH | $6,880 | $7,268 | $7,085 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $11,332 | $27,800 | $49,000 | 1% |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | $1.00 | 0% |
| 611E04600 12" CONDUIT, TYPE C | 18 FT | $477 | $94.35 | $382 | 0% |
| 519E11100 PATCHING CONCRETE STRUCTURE | 17 SF | $489 | $188 | $450 | 0% |
| 611E97700 CONDUIT, MISC.: REPAIR METHOD A | 40 SF | $199 | $119 | $150 | 0% |
| $5,961 |
| $8,743 |
| $5,995 |
| 611E05200 12" CONDUIT, TYPE F, 707.05 TYPE C, 707.21, OR 707 | 4 FT | $661 | $262 | $382 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 2 SNMT | $1,150 | $1,033 | $1,365 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 837E10001 LINER PIPE, AS PER PLAN, 186"x113" ARCH, 748.06, 7 | 250 FT | $2,976 | $744k | 37% |
| 611E96550 FIELD PAVING OF EXISTING PIPE, 16'-7"x10'-1" CMP | 876 FT | $372.37 | $326k | 16% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $239,385 | $239k | 12% |
| 611E96550 FIELD PAVING OF EXISTING PIPE, 108" CMP | 374 FT | $292.81 | $110k | 5% |
| 611E96550 FIELD PAVING OF EXISTING PIPE, 180" CMP | 278 FT | $382.84 | $106k | 5% |
| 611E97700 CONDUIT, MISC.: REPAIR METHOD B | 80 SF | $1,057 | $85k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $69,416 | $69k | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $64,813 | $65k | 3% |
| 202E70130 SPECIAL - PIPE CLEANOUT OVER 48" | 1,126 FT | $50.97 | $57k | 3% |
| 837E21000 BACKFILL FOR LINER PIPE | 250 FT | $212 | $53k | 3% |