ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 63 more items below.
| Item | Quantity | R1Eagle Bridge CO | R2Kt Holden Construction LLC | R3Miller Bros Const INC | R4Complete General Construction Company | R5Sunesis Construction CO | R6Double Z Construction Company | R7Kokosing Construction Company INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 513E10280 STRUCTURAL STEEL MEMBERS, LEVEL 4 | 315,090 LB | $2.70 | $2.77 | $2.60 | $2.50 | $3.00 | $2.65 | $3.75 | 24% |
| 524E94805 DRILLED SHAFTS, 42" DIAMETER, INTO BEDROCK, AS PER | 510 FT | $750 | $660 | $780 | $875 | $680 | $947 | $650 | 11% |
| Item | Quantity | R1Eagle Bridge CO | R2Kt Holden Construction LLC | R3Miller Bros Const INC | R4Complete General Construction Company | R5Sunesis Construction CO | R6Double Z Construction Company | R7Kokosing Construction Company INC |
|---|---|---|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 1,943 SY | $14.00 | $12.55 | $20.00 | $15.27 | $17.00 | $42.00 | $8.50 |
| 202E38000 GUARDRAIL REMOVED | 375 FT | $4.00 | $5.38 | $6.00 | $2.00 | $4.00 | $6.00 | $2.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK |
| 278 CY |
| $1,350 |
| $1,204 |
| $1,100 |
| $1,200 |
| $1,381 |
| $1,400 |
| $1,150 |
| 11% |
| 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 549 CY | $600 | $503 | $650 | $450 | $767 | $850 | $850 | 9% |
| 624E10000 MOBILIZATION | 1 LS | $200,000 | $103,063 | $200,000 | $224,000 | $195,918 | $100,000 | $261,000 | 6% |
| 503E21302 UNCLASSIFIED EXCAVATION, INCLUDING SHALE | 1 LS | $175,000 | $120,046 | $340,000 | $200,000 | $147,438 | $130,000 | $400,000 | 5% |
| 509E26000 GALVANIZED STEEL REINFORCEMENT | 104,799 LB | $1.65 | $1.70 | $1.70 | $1.75 | $2.00 | $2.00 | $1.75 | 5% |
| 202E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN | 1 LS | $170,000 | $304,367 | $160,000 | $215,000 | $252,387 | $197,500 | $184,400 | 5% |
| 517E70100 RAILING (THREE STEEL TUBE BRIDGE RAILING) | 345.72 FT | $420 | $452 | $452 | $475 | $452 | $460 | $470 | 4% |
| 526E30011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 254 SY | $400 | $374 | $435 | $350 | $508 | $410 | $500 | 3% |
| 301E56010 ASPHALT CONCRETE BASE, PG64-28, (449) | 503 CY | $195 | $216 | $230 | $265 | $265 | $216 | $216 | 3% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $92,500 | $238,116 | $75,000 | $190,000 | $178,249 | $135,000 | $350,000 | 3% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 14,217 SF | $5.00 | $5.68 | $7.00 | $10.00 | $5.00 | $6.00 | $5.00 | 2% |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 14,217 SF | $4.00 | $4.66 | $7.00 | $7.00 | $4.00 | $6.00 | $4.00 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $50,000 | $61,838 | $20,023 | $25,000 | $22,802 | $29,000 | $24,500 | 1% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $45,000 | $30,168 | $30,000 | $25,000 | $28,130 | $40,000 | $28,130 | 1% |
| 203E35120 GRANULAR MATERIAL, TYPE C | 748 CY | $60.00 | $49.15 | $55.00 | $75.00 | $78.00 | $51.00 | $45.00 | 1% |
| 601E32004 ROCK CHANNEL PROTECTION, TYPE A WITH GEOTEXTILE FA | 529 CY | $80.00 | $134 | $125 | $95.00 | $204 | $110 | $130 | 1% |
| 832E30000 EROSION CONTROL | 40,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 304E20000 AGGREGATE BASE | 447 CY | $85.00 | $70.94 | $69.00 | $90.00 | $88.00 | $98.00 | $90.00 | 1% |
| 4 EACH |
| $500 |
| $371 |
| $450 |
| $295 |
| $166 |
| $400 |
| $295 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 2 EACH | $200 | $202 | $450 | $80.00 | $310 | $400 | $80.00 |
| 202E53100 MAILBOX REMOVED | 1 EACH | $25.00 | $94.04 | $120 | $350 | $54.00 | $150 | $32.00 |
| 203E10000 EXCAVATION | 280 CY | $30.00 | $30.62 | $54.00 | $20.00 | $37.00 | $10.00 | $8.00 |
| 203E20001 EMBANKMENT, AS PER PLAN | 3,416 CY | $10.00 | $16.18 | $18.00 | $35.00 | $22.00 | $58.00 | $38.00 |
| 204E10000 SUBGRADE COMPACTION | 2,686 SY | $3.00 | $2.74 | $1.30 | $5.00 | $4.00 | $7.00 | $7.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 748 CY | $10.00 | $20.69 | $11.00 | $25.00 | $30.00 | $48.00 | $11.25 |
| 606E15050 GUARDRAIL, TYPE MGS | 375 FT | $19.60 | $20.00 | $20.00 | $19.60 | $20.00 | $20.00 | $19.60 |
| 606E26100 ANCHOR ASSEMBLY, TYPE E | 2 EACH | $2,475 | $2,400 | $2,400 | $2,475 | $2,400 | $2,400 | $2,475 |
| 606E26500 ANCHOR ASSEMBLY, TYPE T | 4 EACH | $1,380 | $1,000 | $1,000 | $1,380 | $1,000 | $1,000 | $1,380 |
| 606E34600 MGS BRIDGE TERMINAL ASSEMBLY, TYPE TST-2 | 4 EACH | $2,725 | $2,500 | $2,500 | $2,725 | $2,500 | $2,500 | $2,725 |
| 690E50000 SPECIAL - MAILBOX SUPPORT | 1 EACH | $195 | $219 | $200 | $195 | $73.00 | $200 | $450 |
| 690E71000 SPECIAL - ASBESTOS ABATEMENT, NOTIFICATION | 1 LS | $150 | $923 | $1.00 | $1,500 | $170 | $100 | $250 |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $35,000 | $21,000 | $5,405 | $29,700 | $24,132 | $30,000 | $11,585 |
| 204E50000 GEOTEXTILE FABRIC | 2,143 SY | $1.11 | $2.13 | $2.20 | $2.00 | $2.00 | $1.80 | $2.00 |
| 659E00300 TOPSOIL | 511 CY | $5.00 | $32.49 | $26.00 | $25.00 | $29.00 | $50.00 | $50.00 |
| 659E10000 SEEDING AND MULCHING | 4,605 SY | $1.75 | $1.35 | $1.35 | $1.35 | $3.00 | $6.00 | $1.35 |
| 659E14000 REPAIR SEEDING AND MULCHING | 230 SY | $3.00 | $1.00 | $1.00 | $1.00 | $2.00 | $1.00 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.62 TON | $1,750 | $1,500 | $1,500 | $1,500 | $760 | $1,500 | $1,500 |
| 659E31000 LIME | 0.95 ACRE | $10.00 | $200 | $200 | $200 | $50.00 | $200 | $200 |
| 659E35000 WATER | 24.9 MGAL | $10.00 | $1.00 | $1.00 | $1.00 | $50.00 | $1.00 | $1.00 |
| 670E00500 SLOPE EROSION PROTECTION | 1,157 SY | $2.00 | $1.95 | $1.95 | $1.95 | $2.00 | $1.95 | $1.95 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $3,000 | $5,570 | $2,785 | $2,500 | $2,785 | $3,000 | $2,785 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $17,500 | $10,200 | $16,320 | $26,750 | $15,120 | $20,000 | $15,505 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $16,500 | $15,009 | $15,009 | $15,000 | $9,864 | $15,000 | $17,500 |
| 601E25000 DUMPED ROCK FILL, TYPE A | 38 CY | $69.79 | $73.41 | $118 | $90.00 | $133 | $160 | $115 |
| 602E20000 CONCRETE MASONRY | 2 CY | $750 | $1,000 | $2,600 | $3,000 | $794 | $1,500 | $1,600 |
| 611E04900 12" CONDUIT, TYPE D | 72 FT | $60.00 | $60.01 | $55.00 | $150 | $64.00 | $75.00 | $86.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T = 1.5") | 813 SY | $8.50 | $15.00 | $5.60 | $15.00 | $15.00 | $15.00 | $15.00 |
| 407E20000 NON-TRACKING TACK COAT | 586 GAL | $4.00 | $3.00 | $5.00 | $5.00 | $5.00 | $3.00 | $3.00 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 114 CY | $265 | $366 | $285 | $410 | $410 | $366 | $366 |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (139 CY | $232 | $295 | $264 | $290 | $139 | $295 | $295 |
| 621E00100 RPM | 13 EACH | $258 | $258 | $169 | $258 | $258 | $169 | $169 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 13 EACH | $15.00 | $14.47 | $23.00 | $28.54 | $18.00 | $20.00 | $85.00 |
| 644E00104 EDGE LINE, 6" | 0.36 MILE | $6,410 | $6,410 | $7,505 | $6,410 | $6,410 | $7,505 | $7,505 |
| 644E00300 CENTER LINE | 0.18 MILE | $8,115 | $8,115 | $5,005 | $8,115 | $8,115 | $5,005 | $5,005 |
| 646E10010 EDGE LINE, 6" | 0.08 MILE | $22,875 | $22,875 | $60,045 | $22,875 | $22,875 | $60,045 | $60,045 |
| 646E10200 CENTER LINE | 0.04 MILE | $30,515 | $30,515 | $40,050 | $30,515 | $30,515 | $40,050 | $40,050 |
| 614E12420 DETOUR SIGNING | 1 LS | $15,000 | $6,562 | $6,835 | $6,562 | $6,562 | $20,000 | $10,000 |
| 202E22900 APPROACH SLAB REMOVED | 98 SY | $45.00 | $25.00 | $51.00 | $100 | $37.00 | $55.00 | $75.00 |
| 202E23500 WEARING COURSE REMOVED | 623 SY | $10.00 | $6.68 | $8.00 | $15.00 | $9.00 | $14.00 | $18.00 |
| 511E33501 SEMI-INTEGRAL DIAPHRAGM GUIDE, AS PER PLAN | 4 EACH | $4,250 | $3,929 | $2,900 | $6,000 | $3,023 | $4,500 | $4,100 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 441 SY | $28.25 | $28.25 | $26.00 | $28.25 | $28.00 | $28.25 | $40.00 |
| 512E33000 TYPE 2 WATERPROOFING | 55 SY | $30.00 | $35.00 | $38.00 | $35.00 | $35.00 | $35.00 | $40.00 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 2,700 EACH | $4.50 | $4.50 | $4.50 | $5.00 | $5.00 | $4.50 | $4.90 |
| 514E10000 FINAL INSPECTION REPAIR | 8 EACH | $150 | $154 | $150 | $1.00 | $159 | $150 | $150 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 4 SF | $10.00 | $20.52 | $30.00 | $50.00 | $13.00 | $30.00 | $45.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 121 SF | $14.00 | $7.83 | $9.00 | $11.00 | $7.00 | $20.00 | $16.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 96 FT | $45.00 | $40.00 | $29.00 | $40.00 | $40.00 | $40.00 | $43.00 |
| 516E44300 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 8 EACH | $4,500 | $4,308 | $4,800 | $4,000 | $5,414 | $5,000 | $4,500 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 278 CY | $90.00 | $77.47 | $121 | $100 | $130 | $115 | $110 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 340 FT | $22.00 | $15.25 | $20.00 | $15.25 | $15.00 | $18.00 | $30.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 240 FT | $20.00 | $9.49 | $6.50 | $15.00 | $5.00 | $10.00 | $10.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 50 FT | $20.00 | $33.34 | $22.00 | $15.00 | $22.00 | $18.00 | $42.00 |
| 524E94903 DRILLED SHAFTS, 48" DIAMETER ABOVE BEDROCK, AS PER | 119 FT | $275 | $215 | $438 | $750 | $601 | $563 | $800 |
| 526E90030 TYPE C INSTALLATION | 86.5 FT | $250 | $271 | $275 | $350 | $268 | $310 | $420 |
| 625E33000 STRUCTURE GROUNDING SYSTEM | 2 EACH | $5,760 | $7,350 | $12,308 | $7,500 | $12,308 | $9,000 | $13,308 |
| 894E10000 THERMAL INTEGRITY PROFILING (TIP) TEST | 6 EACH | $3,000 | $2,311 | $2,175 | $1,725 | $1,940 | $1,000 | $2,350 |
| 516E10010 ARMORLESS PREFORMED JOINT SEAL | 86.5 FT | $55.93 | $68.00 | $52.00 | $68.00 | $68.00 | $70.00 | $57.00 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $3,500 | $12,150 | $3,400 | $15,000 | $6,623 | $5,000 | $10,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $20,000 | $16,400 | $15,800 | $15,000 | $22,500 | $45,000 | $20,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 513E10280 STRUCTURAL STEEL MEMBERS, LEVEL 4 | 315,090 LB | $2.7 | $851k | 21% |
| 524E94805 DRILLED SHAFTS, 42" DIAMETER, INTO BEDROCK, AS PER | 510 FT | $750 | $383k | 9% |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 278 CY | $1,350 | $375k | 9% |
| 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 549 CY | $600 | $329k | 8% |
| 624E10000 MOBILIZATION | 1 LS | $200,000 | $200k | 5% |
| 503E21302 UNCLASSIFIED EXCAVATION, INCLUDING SHALE | 1 LS | $175,000 | $175k | 4% |
| 509E26000 GALVANIZED STEEL REINFORCEMENT | 104,799 LB | $1.65 | $173k | 4% |
| 202E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN | 1 LS | $170,000 | $170k | 4% |
| 517E70100 RAILING (THREE STEEL TUBE BRIDGE RAILING) | 345.72 FT | $420 | $145k | 4% |
| 526E30011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 254 SY | $400 | $102k | 3% |