PER-SR 13-19.64
PER County · est $1.0M
Bid dateThursday, October 31—
PER County · est $1.0M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 87 more items below.
| Item | Quantity | R1Buds INC | R2Axis Civil Construction LLC | R3Alan Stone CO INC | % of bid |
|---|---|---|---|---|---|
| 611E96491 20' X 9' CONDUIT, TYPE A, 706.05, AS PER PLAN, DES | 84 FT | $3,120 | $3,500 | $3,900 | 32% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 114 CY | $925 | $645 | $800 | 13% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 42 CY | $1,550 | $1,350 | $2,000 | 8% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 292 CY | $220 | $285 | $300 | 8% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 162 CY | $335 | $350 | $350 | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $50,000 | $60,000 | $68,000 | 6% |
| 202E11002 STRUCTURE REMOVED, OVER 20 FOOT SPAN | 1 LS | $30,000 | $40,000 | $47,000 | 4% |
| 304E20000 AGGREGATE BASE | 272 CY | $95.00 | $100 | $100 | 3% |
| 851E10000 PRECAST GRAVITY AND SEMIGRAVITY RETAINING WALL | 315 SF | $77.00 | $95.00 | $80.00 | 3% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 17,017 LB | $1.30 | $2.35 | $2.00 | 3% |
| 622E10160 CONCRETE BARRIER, SINGLE SLOPE, TYPE D | 82 FT | $245 | $285 | $340 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $17,000 | $40,000 | $36,000 | 2% |
| 614E12420 DETOUR SIGNING | 1 LS | $15,000 | $13,750 | $17,000 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $15,000 | $10,000 | $10,000 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.5") | 1,779 SY | $7.25 | $6.50 | $7.00 | 2% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $10,000 | $70,000 | $98,000 | 1% |
| 503E21100 UNCLASSIFIED EXCAVATION | 491 CY | $20.00 | $49.00 | $100 | 1% |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 96 CY | $98.00 | $135 | $120 | 1% |
| 611E99574 MANHOLE, NO. 3 | 2 EACH | $4,200 | $4,800 | $6,100 | 1% |
| 202E23000 PAVEMENT REMOVED | 417 SY | $20.00 | $18.00 | $22.00 | 1% |
| Item | Quantity | R1Buds INC | R2Axis Civil Construction LLC | R3Alan Stone CO INC |
|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,000 | $10,000 | $7,500 |
| 202E23500 WEARING COURSE REMOVED | 319 SY | $20.00 | $10.00 | $1.50 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 57 FT | $20.00 | $32.00 | $25.00 |
| 202E38000 GUARDRAIL REMOVED | 400 FT | $2.50 | $8.00 | $3.00 |
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A | 2 EACH | $350 | $350 | $400 |
| 202E52990 SPECIAL - PARKING BLOCK REMOVED | 1 EACH |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $50.00 |
| $30.00 |
| $45.00 |
| 202E58100 CATCH BASIN REMOVED | 1 EACH | $500 | $1,500 | $460 |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT | 10 FT | $85.00 | $150 | $35.00 |
| 202E98000 REMOVAL MISC.:BUSINESS SIGN REMOVED | 1 LS | $3,500 | $750 | $4,500 |
| 203E10000 EXCAVATION | 154 CY | $30.00 | $40.00 | $40.00 |
| 203E20000 EMBANKMENT | 45 CY | $65.00 | $40.00 | $45.00 |
| 203E35110 GRANULAR MATERIAL, TYPE B | 27 CY | $84.00 | $130 | $200 |
| 204E10000 SUBGRADE COMPACTION | 562 SY | $5.00 | $3.00 | $4.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 75 FT | $35.00 | $28.00 | $40.00 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 225 FT | $22.00 | $34.00 | $25.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 1 EACH | $2,700 | $2,850 | $3,100 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 2 EACH | $1,250 | $1,475 | $1,400 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 1 EACH | $2,700 | $2,500 | $3,100 |
| 622E25000 CONCRETE BARRIER END SECTION, TYPE D | 1 EACH | $6,500 | $9,500 | $11,000 |
| 623E38500 MONUMENT ASSEMBLY, TYPE C | 2 EACH | $1,400 | $2,800 | $2,400 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 6 SY | $585 | $200 | $210 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 4 CY | $125 | $135 | $230 |
| 659E00100 SOIL ANALYSIS TEST | 1 EACH | $50.00 | $125 | $170 |
| 659E00510 SEEDING AND MULCHING, CLASS 2 | 2,500 SY | $1.70 | $1.90 | $2.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 125 SY | $0.05 | $1.80 | $6.50 |
| 659E15000 INTER-SEEDING | 125 SY | $0.05 | $1.80 | $7.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.08 TON | $900 | $900 | $810 |
| 659E31000 LIME | 0.52 ACRE | $200 | $155 | $930 |
| 659E35000 WATER | 14 MGAL | $1.00 | $1.00 | $120 |
| 832E30000 EROSION CONTROL | 2,500 EACH | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 0.4 CY | $2,000 | $3,200 | $2,900 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 136 FT | $20.00 | $25.00 | $25.00 |
| 605E14000 6" BASE PIPE UNDERDRAINS | 53 FT | $25.00 | $25.00 | $45.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 11 FT | $20.00 | $25.00 | $65.00 |
| 611E02000 8" CONDUIT, TYPE C | 10 FT | $20.00 | $30.00 | $210 |
| 611E04400 12" CONDUIT, TYPE B | 32 FT | $85.00 | $125 | $240 |
| 611E07400 18" CONDUIT, TYPE B | 45 FT | $150 | $140 | $300 |
| 611E10400 24" CONDUIT, TYPE B, 706.02 | 16 FT | $358 | $290 | $610 |
| 611E98150 CATCH BASIN, NO. 3 | 1 EACH | $5,300 | $6,500 | $9,700 |
| 611E98470 CATCH BASIN, NO. 2-2B | 1 EACH | $2,000 | $4,200 | $3,200 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 3 EACH | $285 | $450 | $450 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 377 FT | $5.00 | $3.00 | $9.00 |
| 407E10000 TACK COAT | 3 GAL | $2.25 | $10.00 | $4.00 |
| 407E20000 NON-TRACKING TACK COAT | 290 GAL | $3.90 | $6.00 | $5.00 |
| 609E26000 CURB, TYPE 6 | 147 FT | $22.00 | $55.00 | $70.00 |
| 609E72001 CONCRETE MEDIAN, AS PER PLAN (6" DEPTH) | 18 SY | $275 | $175 | $220 |
| 617E10100 COMPACTED AGGREGATE | 15 CY | $120 | $220 | $220 |
| 638E98600 WATER WORK, MISC.:1" WATER SERVICE LINE | 30 FT | $132 | $180 | $10.00 |
| 626E00102 BARRIER REFLECTOR, TYPE 1 (TWO WAY) | 3 EACH | $10.00 | $12.00 | $10.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (TWO WAY) | 16 EACH | $12.00 | $12.00 | $15.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 171 FT | $12.00 | $25.00 | $15.00 |
| 630E80100 SIGN, FLAT SHEET | 93.8 SF | $20.00 | $40.00 | $25.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 20 EACH | $15.00 | $75.00 | $30.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 2 EACH | $75.00 | $600 | $85.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 12 EACH | $15.00 | $75.00 | $30.00 |
| 642E00300 CENTER LINE, TYPE 1 | 0.09 MILE | $2,800 | $2,715 | $27,000 |
| 644E00100 EDGE LINE, 4" | 0.12 MILE | $8,700 | $8,620 | $9,900 |
| 644E00300 CENTER LINE | 0.08 MILE | $15,600 | $15,410 | $18,000 |
| 644E00400 CHANNELIZING LINE, 8" | 75 FT | $3.80 | $3.75 | $4.50 |
| 644E00500 STOP LINE | 49 FT | $10.00 | $9.95 | $10.00 |
| 644E01300 LANE ARROW | 1 EACH | $125 | $125 | $140 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 120 HOUR | $65.00 | $65.00 | $100 |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,100 | $2,500 | $2,300 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 25 CY | $100 | $350 | $430 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL) | 6 EACH | $10.00 | $29.00 | $60.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 6 EACH | $15.00 | $29.00 | $60.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 6 SNMT | $1,250 | $1,610 | $1,700 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 0.05 MILE | $20,000 | $22,250 | $27,000 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 23 FT | $15.00 | $14.00 | $17.00 |
| 614E40051 BUSINESS ENTRANCE SIGN, AS PER PLAN | 3 EACH | $100 | $125 | $140 |
| 616E10000 WATER | 20 MGAL | $0.10 | $1.00 | $0.10 |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 180 FT | $25.00 | $45.00 | $40.00 |
| 851E11000 NATURAL SOIL | 31 CY | $40.00 | $60.00 | $75.00 |
| 851E14000 ON-SITE ASSISTANCE | 2 DAY | $250 | $500 | $580 |
| 851E15000 WALL DRAINAGE SYSTEM | 1 LS | $5,000 | $5,600 | $6,300 |
| 851E15500 PGSRW INSPECTION AND COMPACTION TESTING | 1 LS | $6,000 | $1,000 | $750 |
| 202E22900 APPROACH SLAB REMOVED | 147 SY | $40.00 | $45.00 | $35.00 |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 2 CY | $2,200 | $1,600 | $210 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 154 SY | $28.00 | $36.00 | $40.00 |
| 512E33000 TYPE 2 WATERPROOFING | 217 SY | $18.00 | $22.00 | $30.00 |
| 512E33010 TYPE 3 WATERPROOFING | 224 SY | $35.00 | $44.00 | $40.00 |
| 516E13601 1" PREFORMED EXPANSION JOINT FILLER, AS PER PLAN | 62 SF | $25.00 | $25.00 | $15.00 |
| 518E20000 PREFABRICATED GEOCOMPOSITE DRAIN | 69 SY | $29.00 | $45.00 | $50.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 18 CY | $130 | $180 | $180 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 61 FT | $20.00 | $9.00 | $15.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 9 FT | $20.00 | $9.00 | $95.00 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $8,000 | $10,000 | $12,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E96491 20' X 9' CONDUIT, TYPE A, 706.05, AS PER PLAN, DES | 84 FT | $3,120 | $262k | 25% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 114 CY | $925 | $105k | 10% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 42 CY | $1,550 | $65k | 6% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 292 CY | $220 | $64k | 6% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 162 CY | $335 | $54k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $50,000 | $50k | 5% |
| 202E11002 STRUCTURE REMOVED, OVER 20 FOOT SPAN | 1 LS | $30,000 | $30k | 3% |
| 304E20000 AGGREGATE BASE | 272 CY | $95 | $26k | 3% |
| 851E10000 PRECAST GRAVITY AND SEMIGRAVITY RETAINING WALL | 315 SF | $77 | $24k | 2% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 17,017 LB | $1.3 | $22k | 2% |