HOL-SR 3-00.70
HOL County · est $0.4M
Bid dateThursday, December 19—
HOL County · est $0.4M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 39 more items below.
| Item | Quantity | R1R C Construction Company And Son | R2INC Mc Connell Contracting INC | R3Crawford Construction Company INC | % of bid |
|---|---|---|---|---|---|
| 611E94701 6' X 4' CONDUIT, TYPE A, 706.05, AS PER PLAN (DESI | 46 FT | $995 | $2,000 | $2,500 | 15% |
| 900E00100 RAILROAD FLAGGING SERVICES | 27,887 EACH | $1.00 | $1.00 | $1.00 | 9% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $20,000 | $50,000 | $8,000 | 6% |
| 304E20000 AGGREGATE BASE | 130 CY | $150 | $145 | $150 | 6% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 42 CY | $385 | $365 | $800 | 5% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $16,000 | $6,000 | $7,000 | 5% |
| 832E30000 EROSION CONTROL |
| Item | Quantity | R1R C Construction Company And Son | R2INC Mc Connell Contracting INC | R3Crawford Construction Company INC |
|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $3,500 | $750 | $2,300 |
| 202E23000 PAVEMENT REMOVED | 169 SY | $35.00 | $15.00 | $30.00 |
| 202E35200 PIPE REMOVED, OVER 24" DIAMETER | 35 FT | $100 | $500 | $500 |
| 202E38000 GUARDRAIL REMOVED | 234 FT | $5.00 | $5.00 | $15.00 |
| 203E10000 EXCAVATION | 104 CY | $25.00 | $65.00 | $75.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 15,000 EACH |
| $1.00 |
| $1.00 |
| $1.00 |
| 5% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $15,000 | $10,000 | $4,000 | 5% |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $15,000 | $10,000 | $14,000 | 5% |
| 613E41200 LOW STRENGTH MORTAR BACKFILL | 83 CY | $175 | $120 | $200 | 5% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 24 CY | $600 | $1,200 | $1,000 | 5% |
| 614E12420 DETOUR SIGNING | 1 LS | $12,500 | $5,000 | $10,000 | 4% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $12,500 | $5,000 | $10,500 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $12,500 | $23,000 | $67,000 | 4% |
| 606E15050 GUARDRAIL, TYPE MGS | 387.5 FT | $30.00 | $20.00 | $23.00 | 4% |
| 503E21100 UNCLASSIFIED EXCAVATION | 164 CY | $65.00 | $65.00 | $160 | 3% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 2,878 LB | $3.50 | $3.00 | $2.50 | 3% |
| 202E20010 HEADWALL REMOVED | 2 EACH | $4,500 | $1,000 | $740 | 3% |
| 408E10001 PRIME COAT, AS PER PLAN | 85 GAL | $100 | $17.00 | $11.00 | 3% |
| 659E10000 SEEDING AND MULCHING | 755 SY | $10.00 | $1.50 | $4.70 | 2% |
| 203E20000 EMBANKMENT |
| 63 CY |
| $25.00 |
| $65.00 |
| $75.00 |
| 204E10000 SUBGRADE COMPACTION | 166 SY | $2.00 | $10.00 | $5.00 |
| 204E50000 GEOTEXTILE FABRIC | 181 SY | $10.00 | $10.00 | $5.00 |
| 606E25550 ANCHOR ASSEMBLY, MGS TYPE A | 1 EACH | $1,950 | $1,250 | $1,800 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016 OR NCHRP 35 | 1 EACH | $2,900 | $3,100 | $3,200 |
| 601E26001 DUMPED ROCK FILL, TYPE B, AS PER PLAN | 24 CY | $165 | $150 | $131 |
| 601E32110 ROCK CHANNEL PROTECTION, TYPE B WITH AGGREGATE FIL | 27 CY | $165 | $175 | $225 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $25.00 | $50.00 | $28.00 |
| 659E00300 TOPSOIL | 84 CY | $50.00 | $35.00 | $53.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 38 SY | $0.20 | $1.00 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.1 TON | $3,000 | $1,500 | $713 |
| 659E31000 LIME | 0.16 ACRE | $2,200 | $1,000 | $58.00 |
| 659E35000 WATER | 5 MGAL | $1.00 | $1.00 | $1.00 |
| 511E46000 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 10 SY | $600 | $1,500 | $2,100 |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 1 CY | $600 | $2,500 | $2,300 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 49 SY | $75.00 | $15.00 | $51.00 |
| 512E33000 TYPE 2 WATERPROOFING | 54 SY | $40.00 | $65.00 | $75.00 |
| 512E33010 TYPE 3 WATERPROOFING | 45 SY | $65.00 | $145 | $90.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 26 SF | $50.00 | $15.00 | $20.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 11 CY | $175 | $125 | $250 |
| 605E31100 AGGREGATE DRAINS | 16 FT | $25.00 | $75.00 | $30.00 |
| 407E10000 TACK COAT | 29 GAL | $25.00 | $15.00 | $5.50 |
| 441E70100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 6 CY | $575 | $470 | $2,500 |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (8 CY | $575 | $430 | $1,800 |
| 621E00100 RPM | 3 EACH | $1,400 | $1,000 | $2,000 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 3 EACH | $100 | $50.00 | $80.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 6 EACH | $50.00 | $13.00 | $14.00 |
| 646E10010 EDGE LINE, 6" | 0.02 MILE | $132,000 | $70,000 | $153,500 |
| 646E10200 CENTER LINE | 0.01 MILE | $132,000 | $115,000 | $229,500 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 150 CY | $50.00 | $105 | $190 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.02 MILE | $12,500 | $15,000 | $38,900 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 0.04 MILE | $12,500 | $15,000 | $29,200 |
| 616E10000 WATER | 10 MGAL | $1.00 | $1.00 | $2.30 |
| 619E16000 FIELD OFFICE, TYPE A | 5 MNTH | $100 | $200 | $800 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E94701 6' X 4' CONDUIT, TYPE A, 706.05, AS PER PLAN (DESI | 46 FT | $995 | $46k | 11% |
| 900E00100 RAILROAD FLAGGING SERVICES | 27,887 EACH | $1 | $28k | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $20,000 | $20k | 5% |
| 304E20000 AGGREGATE BASE | 130 CY | $150 | $20k | 5% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 42 CY | $385 | $16k | 4% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $16,000 | $16k | 4% |
| 832E30000 EROSION CONTROL | 15,000 EACH | $1 | $15k | 4% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $15,000 | $15k | 4% |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $15,000 | $15k | 4% |
| 613E41200 LOW STRENGTH MORTAR BACKFILL | 83 CY | $175 | $15k | 4% |