LOR-SR 2-(00.97) (07.42)
LOR County · est $0.9M
Bid dateThursday, August 8—
LOR County · est $0.9M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 19 more items below.
| Item | Quantity | R1Ohio Concrete Maintenance LLC | R2Eius Company | R3Great Lakes Construction CO | R4Perk Company INC | R5Kokosing Construction Company INC | % of bid |
|---|---|---|---|---|---|---|---|
| 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 2,028 SY | $79.30 | $93.58 | $90.00 | $84.00 | $94.00 | 24% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 2,028 SY | $40.00 | $43.13 | $80.00 | $72.00 | $161 | 12% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $60,000 | $168,564 | $190,000 | $165,000 | $121,771 | 9% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 2,580 FT | $16.00 | $30.45 | $25.00 | $29.00 | $16.60 | 6% |
| 896E00012 PORTABLE NON-INTRUSIVE TRAFFIC SENSOR, CLASS II | 17 SNMT | $2,100 | $998 | $950 | $950 | $1,800 | 5% |
| 848E50341 |
| Item | Quantity | R1Ohio Concrete Maintenance LLC | R2Eius Company | R3Great Lakes Construction CO | R4Perk Company INC | R5Kokosing Construction Company INC |
|---|---|---|---|---|---|---|
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.1 MILE | $5,500 | $9,256 | $8,815 | $8,815 | $8,815 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.22 MILE | $5,500 | $9,256 | $8,815 | $8,815 | $8,815 |
| 642E00204 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 609 SY |
| $50.00 |
| $58.50 |
| $28.00 |
| $75.00 |
| $316 |
| 5% |
| 848E50320 EXISTING CONCRETE OVERLAY REMOVED, "2.25" NOMINAL | 2,028 SY | $15.00 | $8.55 | $10.00 | $21.55 | $11.00 | 5% |
| 202E11301 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 15 CY | $2,000 | $2,134 | $2,500 | $2,710 | $2,742 | 5% |
| 511E71100 CONCRETE, MISC.: CLASS QC MS CONCRETE, AS PER PLAN | 15 CY | $2,000 | $3,263 | $1,870 | $5,000 | $1,866 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $30,000 | $13,007 | $70,000 | $27,550 | $67,500 | 5% |
| 848E50200 FULL-DEPTH REPAIR | 14 CY | $2,000 | $3,704 | $500 | $1,000 | $8,580 | 4% |
| 896E00020 PORTABLE CHANGEABLE MESSAGE SIGN | 17 SNMT | $1,300 | $998 | $950 | $950 | $960 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $14,000 | $11,028 | $14,000 | $11,500 | $5,000 | 2% |
| 614E11111 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 120 HOUR | $110 | $80.85 | $86.00 | $100 | $122 | 2% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 20 CY | $500 | $797 | $500 | $100 | $675 | 2% |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 478 SY | $20.00 | $20.51 | $20.00 | $20.00 | $33.00 | 1% |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS, | 3 EACH | $2,800 | $2,310 | $2,200 | $2,200 | $3,400 | 1% |
| 614E11630 INCREASED BARRIER DELINEATION | 3,778 FT | $2.00 | $1.47 | $1.40 | $1.40 | $0.30 | 1% |
| 848E50000 HAND CHIPPING | 61 SY | $120 | $246 | $225 | $200 | $568 | 1% |
| 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY | 19 CY | $350 | $450 | $380 | $400 | $417 | 1% |
| 0.3 MILE |
| $2,200 |
| $5,600 |
| $5,335 |
| $5,335 |
| $5,335 |
| 642E01510 DOTTED LINE, 6", TYPE 1 | 260 FT | $2.50 | $1.58 | $1.50 | $1.50 | $1.50 |
| 642E40001 SPEED MEASUREMENT MARKING, AS PER PLAN | 2 EACH | $150 | $788 | $750 | $750 | $750 |
| 614E12420 DETOUR SIGNING | 1 LS | $5,000 | $2,099 | $1,999 | $5,500 | $6,630 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, 1WAY | 53 EACH | $8.00 | $12.60 | $12.00 | $12.00 | $8.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 53 EACH | $14.00 | $21.00 | $20.00 | $20.00 | $21.50 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 3 SNMT | $1,200 | $945 | $900 | $900 | $879 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 1.66 MILE | $2,200 | $1,885 | $1,795 | $1,795 | $1,795 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 1.19 MILE | $2,200 | $1,885 | $1,795 | $1,795 | $1,795 |
| 614E24612 WORK ZONE DOTTED LINE, CLASS III, 6", 642 PAINT | 4,597 FT | $1.00 | $1.05 | $1.00 | $1.00 | $1.00 |
| 622E41110 PORTABLE BARRIER, ANCHORED | 220 FT | $20.00 | $38.85 | $50.00 | $55.00 | $68.00 |
| 848E50100 TEST SLAB | 1 LS | $2,000 | $3,033 | $2,000 | $3,000 | $4,133 |
| 509E10001 EPOXY COATED STEEL REINFORCEMENT, AS PER PLAN | 144 LB | $5.00 | $13.35 | $9.00 | $5.00 | $10.00 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 70 SY | $25.00 | $25.18 | $20.00 | $46.00 | $29.00 |
| 619E16010 FIELD OFFICE, TYPE B | 2 MNTH | $2,200 | $4,521 | $8,600 | $500 | $3,500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,500 | $4,950 | $500 | $3,500 | $4,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 2,028 SY | $79.3 | $161k | 23% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 2,028 SY | $40 | $81k | 12% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $60,000 | $60k | 9% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 2,580 FT | $16 | $41k | 6% |
| 896E00012 PORTABLE NON-INTRUSIVE TRAFFIC SENSOR, CLASS II | 17 SNMT | $2,100 | $36k | 5% |
| 848E50341 REMOVAL OF DEBONDED OR DETERIORATED EXISTING VARIA | 609 SY | $50 | $30k | 4% |
| 848E50320 EXISTING CONCRETE OVERLAY REMOVED, "2.25" NOMINAL | 2,028 SY | $15 | $30k | 4% |
| 202E11301 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 15 CY | $2,000 | $30k | 4% |
| 511E71100 CONCRETE, MISC.: CLASS QC MS CONCRETE, AS PER PLAN | 15 CY | $2,000 | $30k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $30,000 | $30k | 4% |