RIC-SR 314-02.75
RIC County · est $0.5M
Bid dateThursday, January 16—
RIC County · est $0.5M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 46 more items below.
| Item | Quantity | R1Crawford Construction Company INC | R2Bcc Ohio INC | R3Layton Services | R4Adena Corporation | R5Eclipse CO LLC | R6Advanced Excavating & Demolition LLC | R7V3 Construction Group LTD | R8Stanley Miller Construction Company | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|
| 611E53500 63" X 98" CONDUIT, TYPE A, 706.04 | 82 FT | $1,236 | $976 | $1,037 | $1,145 | $843 | $1,150 | $1,300 | $1,760 | 38% |
| 624E10000 MOBILIZATION | 1 LS | $20,170 | $12,176 | $10,000 | $10,936 | $26,000 | $42,000 |
| Item | Quantity | R1Crawford Construction Company INC | R2Bcc Ohio INC | R3Layton Services | R4Adena Corporation | R5Eclipse CO LLC | R6Advanced Excavating & Demolition LLC | R7V3 Construction Group LTD | R8Stanley Miller Construction Company |
|---|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,100 | $6,552 | $2,500 | $14,113 | $18,000 | $10,000 | $9,600 | $5,500 |
| 202E23000 PAVEMENT REMOVED | 233 SY | $12.00 | $8.47 | $16.00 | $14.53 | $12.00 | $20.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $23,261 |
| $52,000 |
| 8% |
| 442E22001 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 36 CY | $464 | $467 | $535 | $1,163 | $550 | $445 | $400 | $907 | 6% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $16,600 | $2,340 | $5,000 | $16,242 | $6,774 | $8,500 | $4,700 | $7,500 | 6% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 15 CY | $812 | $1,152 | $850 | $767 | $937 | $1,000 | $910 | $689 | 5% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 4.5 CY | $2,645 | $1,735 | $3,800 | $2,079 | $3,644 | $2,000 | $3,300 | $1,100 | 4% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) (8.0") | 38 CY | $305 | $378 | $433 | $608 | $540 | $360 | $380 | $849 | 4% |
| 601E32000 ROCK CHANNEL PROTECTION, TYPE A WITH FILTER | 73 CY | $110 | $148 | $220 | $137 | $276 | $105 | $410 | $135 | 3% |
| 203E20000 EMBANKMENT | 265 CY | $26.00 | $23.47 | $15.00 | $9.78 | $30.00 | $25.00 | $44.00 | $109 | 3% |
| 202E11001 STRUCTURE REMOVED, AS PER PLAN | 1 LS | $6,700 | $2,808 | $10,000 | $14,753 | $11,811 | $17,000 | $10,500 | $10,000 | 3% |
| 304E20000 AGGREGATE BASE (6.0") | 40 CY | $160 | $128 | $130 | $109 | $123 | $90.00 | $130 | $155 | 2% |
| 611E10600 24" CONDUIT, TYPE C | 132 FT | $46.00 | $140 | $110 | $99.56 | $126 | $110 | $150 | $50.00 | 2% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 2,498 LB | $2.32 | $2.03 | $4.50 | $2.55 | $2.00 | $6.00 | $5.75 | $2.10 | 2% |
| 203E10000 EXCAVATION | 176 CY | $32.00 | $11.70 | $26.00 | $10.20 | $32.00 | $50.00 | $84.00 | $65.50 | 2% |
| 602E20000 CONCRETE MASONRY | 2.81 CY | $1,940 | $1,561 | $1,700 | $2,501 | $1,189 | $640 | $4,800 | $1,250 | 2% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $5,200 | $4,298 | $15,000 | $12,231 | $24,000 | $12,000 | $10,500 | $13,000 | 2% |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 2 CY | $2,500 | $2,093 | $3,800 | $1,054 | $1,140 | $2,700 | $1,100 | $2,000 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,780 | $4,429 | $10,000 | $5,116 | $9,500 | $10,000 | $5,400 | $10,000 | 2% |
| 659E00300 TOPSOIL | 96 CY | $43.00 | $71.40 | $55.00 | $46.57 | $69.00 | $80.00 | $62.00 | $55.00 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,944 | $3,480 | $10,000 | $6,712 | $6,279 | $8,000 | $5,100 | $14,500 | 1% |
| $34.00 |
| $9.50 |
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 148 FT | $5.00 | $5.85 | $13.00 | $2.21 | $25.00 | $33.00 | $13.00 | $19.50 |
| 202E35200 PIPE REMOVED, OVER 24" DIAMETER | 52 FT | $45.00 | $113 | $27.00 | $6.29 | $36.00 | $95.00 | $57.00 | $55.00 |
| 202E38000 GUARDRAIL REMOVED | 181.25 FT | $7.00 | $7.56 | $16.00 | $6.60 | $8.00 | $7.20 | $15.00 | $5.00 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 3 EACH | $172 | $278 | $700 | $200 | $265 | $265 | $530 | $110 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 1 EACH | $172 | $126 | $700 | $200 | $126 | $120 | $530 | $330 |
| 202E75000 FENCE REMOVED | 252 FT | $11.00 | $3.94 | $8.00 | $7.34 | $4.00 | $3.75 | $10.00 | $9.60 |
| 202E75250 GATE REMOVED | 1 EACH | $217 | $399 | $500 | $99.75 | $395 | $380 | $530 | $330 |
| 202E98100 REMOVAL MISC.: BOULDER | 3 EACH | $172 | $117 | $250 | $33.25 | $77.00 | $200 | $530 | $900 |
| 202E98100 REMOVAL MISC.: WOOD POST | 2 EACH | $100 | $117 | $250 | $99.75 | $115 | $35.00 | $530 | $303 |
| 204E10000 SUBGRADE COMPACTION | 242 SY | $2.00 | $2.34 | $3.00 | $3.29 | $1.00 | $3.50 | $15.00 | $5.00 |
| 607E98200 FENCE, MISC.: TEMPORARY FENCING | 1 LS | $1,000 | $1,872 | $2,400 | $1,310 | $9,900 | $8,650 | $2,600 | $3,000 |
| 623E38500 MONUMENT ASSEMBLY, TYPE C | 2 EACH | $1,733 | $1,816 | $1,700 | $2,013 | $2,035 | $1,800 | $260 | $3,500 |
| 623E50000 PRECONSTRUCTION SURVEY MONUMENT VERIFICATION AND R | 1 LS | $800 | $3,480 | $1,750 | $959 | $3,659 | $3,500 | $260 | $1,500 |
| 623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND | 1 LS | $800 | $3,480 | $1,750 | $959 | $3,659 | $3,000 | $260 | $1,500 |
| 601E11000 RIPRAP, TYPE D | 15 SY | $242 | $2,581 | $250 | $279 | $247 | $370 | $350 | $750 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $50.00 | $275 | $180 | $100 | $105 | $250 | $130 | $150 |
| 659E10000 SEEDING AND MULCHING | 859 SY | $3.50 | $4.15 | $5.00 | $3.53 | $4.00 | $3.95 | $5.50 | $5.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 43 SY | $1.00 | $0.89 | $5.00 | $1.00 | $1.00 | $0.85 | $2.75 | $1.00 |
| 659E15000 INTER-SEEDING | 43 SY | $1.00 | $0.11 | $5.00 | $1.00 | $0.11 | $0.10 | $2.75 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.12 TON | $400 | $578 | $1,500 | $1,066 | $579 | $550 | $890 | $800 |
| 659E31000 LIME | 0.18 ACRE | $120 | $52.50 | $200 | $355 | $53.00 | $50.00 | $160 | $150 |
| 659E35000 WATER | 5 MGAL | $4.50 | $10.50 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 670E00530 SLOPE EROSION PROTECTION MAT, TYPE C | 38 SY | $83.00 | $6.25 | $10.00 | $7.94 | $6.00 | $5.95 | $2.50 | $25.00 |
| 832E30000 EROSION CONTROL | 2,500 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 75 FT | $13.00 | $19.08 | $20.00 | $16.60 | $21.00 | $40.00 | $81.00 | $30.00 |
| 611E07600 18" CONDUIT, TYPE C | 8 FT | $123 | $209 | $190 | $86.96 | $121 | $156 | $180 | $200 |
| 611E98510 CATCH BASIN, NO. 2-3 | 1 EACH | $2,700 | $10,487 | $2,700 | $3,023 | $4,005 | $3,500 | $4,500 | $4,200 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (3.0") | 192 SY | $16.00 | $18.90 | $22.00 | $41.96 | $20.00 | $18.00 | $35.00 | $36.00 |
| 407E10000 TACK COAT | 60 GAL | $7.95 | $15.75 | $18.00 | $11.63 | $2.00 | $15.00 | $22.00 | $4.50 |
| 408E10001 PRIME COAT, AS PER PLAN (0.4 GAL/SY) | 72 GAL | $10.60 | $19.95 | $23.00 | $17.47 | $5.00 | $19.00 | $26.00 | $14.00 |
| 617E10100 COMPACTED AGGREGATE (3.0") | 12 CY | $113 | $128 | $145 | $225 | $184 | $90.00 | $61.00 | $300 |
| 617E10100 COMPACTED AGGREGATE (8.0") | 10 CY | $135 | $128 | $130 | $216 | $184 | $90.00 | $160 | $300 |
| 621E00100 RPM | 3 EACH | $1,060 | $987 | $1,500 | $448 | $1,560 | $585 | $770 | $750 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 3 EACH | $110 | $17.55 | $10.00 | $50.00 | $11.00 | $85.00 | $770 | $100 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $371 | $1,302 | $300 | $180 | $158 | $85.00 | $5,100 | $500 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.15 MILE | $9,950 | $4,200 | $9,500 | $10,001 | $12,143 | $4,000 | $8,700 | $9,194 |
| 642E00300 CENTER LINE, TYPE 1 | 0.08 MILE | $14,170 | $4,200 | $13,000 | $13,327 | $16,185 | $4,000 | $8,700 | $12,258 |
| 614E12420 DETOUR SIGNING | 1 LS | $2,900 | $5,261 | $6,035 | $6,408 | $8,063 | $5,000 | $19,700 | $6,000 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 2 SNMT | $1,000 | $998 | $1,150 | $1,215 | $1,192 | $950 | $1,800 | $3,000 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 21 SY | $96.00 | $39.84 | $100 | $74.54 | $52.00 | $100 | $62.00 | $100 |
| 512E33000 TYPE 2 WATERPROOFING | 116 SY | $30.00 | $31.28 | $40.00 | $26.54 | $26.00 | $30.00 | $29.00 | $35.00 |
| 518E21230 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 1 LS | $1,300 | $2,391 | $2,300 | $1,678 | $2,654 | $4,600 | $8,100 | $4,400 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $1,060 | $2,646 | $3,300 | $7,085 | $6,000 | $14,000 | $15,200 | $5,000 |
| 619E16000 FIELD OFFICE, TYPE A | 2 MNTH | $700 | $3,461 | $5,000 | $400 | $684 | $1,750 | $5,100 | $1,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E53500 63" X 98" CONDUIT, TYPE A, 706.04 | 82 FT | $1,236 | $101k | 31% |
| 624E10000 MOBILIZATION | 1 LS | $20,170 | $20k | 6% |
| 442E22001 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 36 CY | $464 | $17k | 5% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $16,600 | $17k | 5% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 15 CY | $812 | $12k | 4% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 4.5 CY | $2,645 | $12k | 4% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) (8.0") | 38 CY | $305 | $12k | 4% |
| 601E32000 ROCK CHANNEL PROTECTION, TYPE A WITH FILTER | 73 CY | $110 | $8k | 2% |
| 203E20000 EMBANKMENT | 265 CY | $26 | $7k | 2% |
| 202E11001 STRUCTURE REMOVED, AS PER PLAN | 1 LS | $6,700 | $7k | 2% |