MAD-SR-SR 56-00.00
MAD County · est $1.3M
Bid dateThursday, January 30—
MAD County · est $1.3M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 37 more items below.
| Item | Quantity | R1A & B Asphalt Corporation | R2Shelly Company | R3Shelly & Sands INC | R4Kokosing Construction Company INC | R5Fillmore Construction | % of bid |
|---|---|---|---|---|---|---|---|
| 441E90000 ASPHALT CONCRETE, MISC.: SURFACE COURSE, TYPE 1 | — | $218 | $242 | $215 | $260 | $228 | 30% |
| 441E10101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), AS | 1,600 CY | $193 | $217 | $205 | $215 | $226 | 27% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A, 0.75" | 85,547 SY | $1.25 | $1.19 | $1.10 | $1.25 | $2.00 | 9% |
| 251E01041 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 2,037 SY | $48.50 | $35.00 | $65.00 | $55.00 | $75.00 | 9% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 565 CY | $86.43 | $86.00 | $85.00 | $45.00 | $80.00 | 4% |
| 644E00104 EDGE LINE, 6" |
| Item | Quantity | R1A & B Asphalt Corporation | R2Shelly Company | R3Shelly & Sands INC | R4Kokosing Construction Company INC | R5Fillmore Construction |
|---|---|---|---|---|---|---|
| 203E20001 EMBANKMENT, AS PER PLAN | 26 CY | $202 | $100 | $70.00 | $50.00 | $100 |
| 623E39500 MONUMENT ASSEMBLY ADJUSTED TO GRADE | 2 EACH | $500 | $650 | $2,500 | $1,000 | $1,000 |
| 659E00300 TOPSOIL | 11 CY | $251 | $100 | $50.00 | $100 | $200 |
| 659E10000 SEEDING AND MULCHING | 59 SY | $83.20 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 12.35 MILE |
| $2,500 |
| $2,500 |
| $2,500 |
| $2,500 |
| $2,500 |
| 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $30,363 | $50,000 | $56,000 | $63,563 | $57,500 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $24,052 | $40,000 | $28,500 | $70,000 | $24,300 | 2% |
| 644E00300 CENTER LINE | 6.15 MILE | $3,286 | $3,286 | $3,286 | $3,286 | $3,286 | 2% |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 12.3 MILE | $1,621 | $1,621 | $1,621 | $1,621 | $990 | 2% |
| 407E20000 NON-TRACKING TACK COAT | 7,931 GAL | $2.50 | $3.00 | $3.50 | $2.80 | $3.50 | 2% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 670 FT | $26.00 | $26.00 | $35.00 | $18.00 | $26.00 | 2% |
| 621E00100 RPM | 489 EACH | $34.00 | $34.00 | $34.00 | $34.00 | $40.46 | 1% |
| 251E01041 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 143 SY | $75.00 | $57.00 | $125 | $85.00 | $100 | 1% |
| 617E20000 SHOULDER PREPARATION | 7,376 SY | $1.40 | $1.25 | $4.00 | $0.60 | $3.00 | 1% |
| 251E01041 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 223 SY | $46.00 | $45.00 | $60.00 | $80.00 | $50.00 | 1% |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 12.35 MILE | $806 | $806 | $806 | $806 | $890 | 1% |
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 28 CY | $350 | $425 | $350 | $500 | $248 | 1% |
| 874E21000 LONGITUDINAL JOINT PREPARATION | 6.12 MILE | $1,500 | $2,500 | $950 | $5,000 | $2,500 | 1% |
| 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 1 LS | $8,500 | $9,250 | $8,500 | $4,163 | $8,500 | 1% |
| $30.00 |
| $8.00 |
| $30.00 |
| $2.50 |
| 659E20000 COMMERCIAL FERTILIZER | 0.01 TON | $640 | $1,500 | $5,000 | $1,250 | $1,400 |
| 659E31000 LIME | 0.01 ACRE | $156 | $5.00 | $1,060 | $150 | $450 |
| 659E35000 WATER | 1 MGAL | $1.00 | $20.00 | $1.00 | $1.00 | $100 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.25" | 5,894 SY | $1.25 | $1.19 | $2.00 | $2.20 | $3.00 |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 42 CY | $193 | $450 | $375 | $450 | $246 |
| 617E25000 WATER | 3 MGAL | $11.85 | $700 | $85.00 | $7.50 | $100 |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A, 1.00" | 695 SY | $1.25 | $1.19 | $4.80 | $3.50 | $20.00 |
| 897E01011 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A, AS PE | 1,226 SY | $1.25 | $1.19 | $3.00 | $10.00 | $10.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 489 EACH | $13.45 | $4.50 | $15.00 | $2.00 | $10.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 80 FT | $16.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 56 FT | $24.00 | $15.50 | $15.50 | $15.50 | $15.50 |
| 630E80100 SIGN, FLAT SHEET | 24 SF | $26.00 | $18.00 | $18.00 | $18.00 | $18.00 |
| 644E00400 CHANNELIZING LINE, 8" | 187 FT | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 644E00500 STOP LINE | 48 FT | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 644E01300 LANE ARROW | 2 EACH | $250 | $250 | $250 | $250 | $250 |
| 646E10010 EDGE LINE, 6" | 0.11 MILE | $27,196 | $27,196 | $27,196 | $27,196 | $27,196 |
| 646E10200 CENTER LINE | 0.06 MILE | $49,858 | $49,858 | $49,858 | $49,858 | $49,858 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 16 HOUR | $75.00 | $92.00 | $95.00 | $125 | $125 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,400 | $2,400 | $2,550 | $3,200 | $2,400 |
| 614E12460 WORK ZONE MARKING SIGN | 64 EACH | $100 | $110 | $110 | $110 | $110 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, ONE WAY | 15 EACH | $14.00 | $14.00 | $12.00 | $14.00 | $14.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 15 EACH | $18.00 | $18.00 | $16.00 | $20.00 | $18.00 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 374 FT | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 96 FT | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 509E10001 EPOXY COATED STEEL REINFORCEMENT, AS PER PLAN | 32 LB | $20.00 | $15.00 | $20.00 | $29.71 | $20.00 |
| 517E76300 RAILING, MISC.: REMOVE AND RESET BRIDGE RAILING | 25 FT | $245 | $120 | $50.00 | $128 | $80.00 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 5 FT | $40.00 | $50.00 | $40.00 | $106 | $40.00 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 12 SF | $200 | $500 | $200 | $539 | $200 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 6 EACH | $30.00 | $40.00 | $30.00 | $134 | $30.00 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 4 SY | $72.00 | $150 | $72.00 | $92.48 | $72.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,183 | $5,000 | $5,003 | $5,800 | $6,800 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $3,000 | $10,500 | $2,500 | $3,500 | $2,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E90000 ASPHALT CONCRETE, MISC.: SURFACE COURSE, TYPE 1 | — | $217.5 | $343k | 28% |
| 441E10101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), AS | 1,600 CY | $193.25 | $309k | 25% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A, 0.75" | 85,547 SY | $1.25 | $107k | 9% |
| 251E01041 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 2,037 SY | $48.5 | $99k | 8% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 565 CY | $86.43 | $49k | 4% |
| 644E00104 EDGE LINE, 6" | 12.35 MILE | $2,500 | $31k | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $30,363 | $30k | 2% |
| 624E10000 MOBILIZATION | 1 LS | $24,052 | $24k | 2% |
| 644E00300 CENTER LINE | 6.15 MILE | $3,286 | $20k | 2% |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 12.3 MILE | $1,621 | $20k | 2% |