Gea-SR 44-00.00
Geauga County · est $0.8M
Bid dateThursday, February 27—
Geauga County · est $0.8M
Bid tab · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20 items by low bid’s extended amount · 28 more items below.
| Item | Quantity | R1Ronyak Paving INC | R2Karvo Companies INC | R3Shelly Company | % of bid |
|---|---|---|---|---|---|
| 424E14001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B | 448 (1562 CY | $234 | $240 | $215 | 49% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A | — | $1.20 | $0.85 | $1.25 | 9% |
| 624E10000 MOBILIZATION | 1 LS | $42,554 | $40,000 | $20,000 | 6% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 400 SY | $105 | $68.00 | $95.00 | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $40,000 | $26,000 | $74,725 | 5% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 186 CY | $115 | $98.00 | $100 | 3% |
| 646E10010 EDGE LINE, 6" | 5.83 MILE | $3,295 | $2,600 |
| Item | Quantity | R1Ronyak Paving INC | R2Karvo Companies INC | R3Shelly Company |
|---|---|---|---|---|
| 209E60201 LINEAR GRADING, AS PER PLAN | 291 STA | $5.00 | $35.00 | $25.00 |
| 623E39501 MONUMENT ASSEMBLY ADJUSTED TO GRADE, AS PER PLAN | 4 EACH | $1,150 | $1,000 | $1,000 |
| 623E39601 MONUMENT ASSEMBLY RECONSTRUCTED TO GRADE, AS PER P | 1 EACH | $1,400 | $1,350 | $1,200 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 |
| 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE | 1 EACH | $1,950 | $1,250 | $2,000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $2,600 |
| 3% |
| 423E00250 CRACK SEALING, TYPE IV | 597 SY | $30.00 | $107 | $107 | 2% |
| 441E70101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), AS | 25 CY | $650 | $540 | $380 | 2% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 160 HOUR | $85.00 | $100 | $100 | 2% |
| 441E70500 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449) | — | $280 | $500 | $300 | 1% |
| 646E10200 CENTER LINE | 2.95 MILE | $3,615 | $3,750 | $3,750 | 1% |
| 621E00100 RPM | 235 EACH | $45.00 | $39.00 | $45.00 | 1% |
| 407E20000 NON-TRACKING TACK COAT | 5,264 GAL | $2.00 | $2.75 | $2.75 | 1% |
| 619E16011 FIELD OFFICE, TYPE B, AS PER PLAN | 6 MNTH | $1,500 | $2,000 | $3,000 | 1% |
| 874E21000 LONGITUDINAL JOINT PREPARATION | 2.6 MILE | $3,450 | $6,000 | $6,650 | 1% |
| 646E10800 ISLAND MARKING | 2,350 SF | $3.75 | $5.00 | $5.00 | 1% |
| 646E50200 REMOVAL OF PAVEMENT MARKING | 2,350 SF | $3.00 | $2.25 | $2.25 | 1% |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $6,950 | $2,000 | $5,000 | 1% |
| 618E43000 RUMBLE STRIPES, CENTER LINE (ASPHALT CONCRETE) | 2.6 MILE | $2,600 | $2,650 | $2,650 | 1% |
| 1,000 LB |
| $5.00 |
| $3.00 |
| $2.00 |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 378 LB | $3.45 | $1.05 | $5.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 235 EACH | $3.00 | $2.00 | $7.00 |
| 646E10300 CHANNELIZING LINE, 8" | 80 FT | $1.50 | $1.75 | $1.75 |
| 646E10400 STOP LINE | 203 FT | $12.00 | $10.00 | $10.00 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 369 FT | $9.00 | $10.00 | $10.00 |
| 646E20300 LANE ARROW | 4 EACH | $165 | $150 | $150 |
| 690E98400 SPECIAL - INVENTORY EXISTING PAVEMENT MARKINGS | 1 LS | $600 | $250 | $250 |
| 614E12460 WORK ZONE MARKING SIGN | 10 EACH | $85.00 | $75.00 | $75.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $122 | $200 | $120 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 4 SNMT | $900 | $800 | $800 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 5.9 MILE | $1,020 | $1,000 | $1,000 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 2.95 MILE | $895 | $1,000 | $1,000 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 5.83 MILE | $665 | $650 | $650 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 5.83 MILE | $630 | $650 | $650 |
| 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 642 PAIN | 80 FT | $0.60 | $0.65 | $0.65 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 80 FT | $0.57 | $0.65 | $0.65 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 203 FT | $3.00 | $3.00 | $3.00 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 203 FT | $3.00 | $3.00 | $3.00 |
| 614E30200 WORK ZONE ARROW, CLASS I, 642 PAINT | 4 EACH | $40.00 | $50.00 | $50.00 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 4 EACH | $40.00 | $50.00 | $50.00 |
| 630E97800 SIGNING, MISC.: ADDITIONAL SIGNS, GROUND MOUNTED, | 300 SF | $22.50 | $22.50 | $22.50 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,080 | $5,000 | $5,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 424E14001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B | 448 (1562 CY | $234 | $366k | 46% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A | — | $1.2 | $70k | 9% |
| 624E10000 MOBILIZATION | 1 LS | $42,554 | $43k | 5% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 400 SY | $105 | $42k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $40,000 | $40k | 5% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 186 CY | $115 | $21k | 3% |
| 646E10010 EDGE LINE, 6" | 5.83 MILE | $3,295 | $19k | 2% |
| 423E00250 CRACK SEALING, TYPE IV | 597 SY | $30 | $18k | 2% |
| 441E70101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), AS | 25 CY | $650 | $16k | 2% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 160 HOUR | $85 | $14k | 2% |