ERI-SR 2-15.89
ERI County · est $6.3M
Bid dateThursday, May 22—
ERI County · est $6.3M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 68 more items below.
| Item | Quantity | R1Gerken Paving INC | R2Erie Blacktop INC | R3Kokosing Construction Company INC | R4Karvo Companies INC | % of bid |
|---|---|---|---|---|---|---|
| 442E10300 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 7,891 CY | $216 | $240 | $255 | $250 | 30% |
| 255E15000 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 8,690 SY | $154 | $164 | $154 | $175 | 24% |
| 442E22400 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 804 CY | $610 | $345 | $500 | $300 | 9% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $490,000 | $385,000 | $358,097 | $393,000 | 9% |
| 624E10000 MOBILIZATION | 1 LS | $250,000 | $310,000 | $315,000 | $286,203 | 4% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.50 INCH) | 189,380 SY | $1.30 | $1.20 | $1.40 |
| Item | Quantity | R1Gerken Paving INC | R2Erie Blacktop INC | R3Kokosing Construction Company INC | R4Karvo Companies INC |
|---|---|---|---|---|---|
| 202E38000 GUARDRAIL REMOVED | 4,793.75 FT | $2.00 | $2.10 | $2.00 | $3.50 |
| 202E38200 GUARDRAIL REMOVED FOR REUSE | 200 FT | $3.20 | $3.35 | $3.20 | $250 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 2 EACH | $145 | $152 | $145 | $250 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 7 EACH | $75.00 | $78.75 | $75.00 | $250 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $2.00 |
| 4% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 525 CY | $315 | $250 | $330 | $395 | 3% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 225 CY | $700 | $550 | $835 | $500 | 3% |
| 255E15000 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 945 SY | $154 | $164 | $154 | $200 | 3% |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 43,070 FT | $2.90 | $3.05 | $2.90 | $3.50 | 2% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 3,575 FT | $19.60 | $20.60 | $19.60 | $23.75 | 1% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 760 HOUR | $85.00 | $102 | $100 | $100 | 1% |
| 807E14010 WET REFLECTIVE THERMOPLASTIC PAVEMENT MARKING, EDG | 15.8 MILE | $3,900 | $4,410 | $3,900 | $4,200 | 1% |
| 850E10010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $1,800 | $1,890 | $1,800 | $1,800 | 1% |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 72 SNMT | $647 | $788 | $650 | $750 | 1% |
| 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE | 4,382 SY | $10.00 | $13.65 | $10.00 | $10.00 | 1% |
| 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE | 4,364 SY | $10.00 | $13.65 | $10.00 | $10.00 | 1% |
| 617E10100 COMPACTED AGGREGATE | 1,023 CY | $40.00 | $78.00 | $30.00 | $85.00 | 1% |
| 407E10000 TACK COAT | 17,044 GAL | $2.25 | $2.55 | $2.00 | $2.75 | 1% |
| 619E16020 FIELD OFFICE, TYPE C | 12 MNTH | $2,800 | $3,000 | $2,500 | $3,000 | 1% |
| 202E42050 ANCHOR ASSEMBLY REMOVED, TYPE B | 11 EACH | $110 | $116 | $110 | $250 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 10 EACH | $50.00 | $52.50 | $50.00 | $250 |
| 203E20001 EMBANKMENT, AS PER PLAN | 70 CY | $67.50 | $71.00 | $67.50 | $125 |
| 209E15001 RESHAPING UNDER GUARDRAIL, AS PER PLAN | 55.77 STA | $50.00 | $52.50 | $50.00 | $90.00 |
| 209E60500 LINEAR GRADING | 15.7 MILE | $1,500 | $1,900 | $4,000 | $2,275 |
| 606E13000 GUARDRAIL, TYPE 5 | 162.5 FT | $17.60 | $18.50 | $17.60 | $21.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 1,018.75 FT | $18.00 | $18.90 | $18.00 | $21.00 |
| 606E15150 GUARDRAIL, TYPE MGS HALF POST SPACING | 37.5 FT | $34.00 | $35.70 | $34.00 | $22.50 |
| 606E16500 GUARDRAIL REBUILT, TYPE 5 | 200 FT | $13.20 | $13.90 | $13.20 | $9.50 |
| 606E26000 ANCHOR ASSEMBLY, TYPE B | 5 EACH | $2,100 | $2,205 | $2,100 | $2,350 |
| 606E26050 ANCHOR ASSEMBLY, MGS TYPE B | 6 EACH | $2,520 | $2,650 | $2,520 | $2,350 |
| 606E26100 ANCHOR ASSEMBLY, TYPE E | 1 EACH | $2,330 | $2,450 | $2,330 | $2,475 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 1 EACH | $2,400 | $2,520 | $2,400 | $2,475 |
| 606E26500 ANCHOR ASSEMBLY, TYPE T | 2 EACH | $880 | $924 | $880 | $1,350 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 5 EACH | $1,320 | $1,386 | $1,320 | $1,350 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 6 EACH | $2,525 | $2,652 | $2,525 | $13.00 |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 4 EACH | $540 | $567 | $540 | $13.00 |
| 832E30000 EROSION CONTROL | 2,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 254E01600 PATCHING PLANED SURFACE | 955 SY | $1.50 | $10.00 | $1.25 | $0.50 |
| 407E13900 TACK COAT, 702.13 | 482 GAL | $3.00 | $3.80 | $2.00 | $2.75 |
| 408E10001 PRIME COAT, AS PER PLAN | 7,370 GAL | $4.00 | $4.75 | $4.00 | $4.50 |
| 442E00100 ANTI-SEGREGATION EQUIPMENT | 5,981 CY | $1.00 | $10.00 | $0.50 | $7.00 |
| 618E40600 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 14.35 MILE | $1,485 | $1,260 | $955 | $955 |
| 621E00100 RPM | 551 EACH | $34.00 | $46.75 | $34.00 | $50.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 551 EACH | $5.00 | $5.00 | $5.00 | $1.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, 1 WAY | 66 EACH | $12.90 | $13.55 | $12.90 | $13.00 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 344 FT | $5.75 | $7.35 | $5.75 | $7.00 |
| 644E01360 WRONG WAY ARROW | 6 EACH | $125 | $158 | $125 | $150 |
| 644E40000 SPEED MEASUREMENT MARKING | 30 EACH | $323 | $244 | $275 | $100 |
| 807E12010 WET REFLECTIVE EPOXY PAVEMENT MARKING, EDGE LINE, | 2.88 MILE | $4,200 | $5,250 | $4,200 | $5,000 |
| 807E12110 WET REFLECTIVE EPOXY PAVEMENT MARKING, LANE LINE, | 1.61 MILE | $2,100 | $2,100 | $2,100 | $2,000 |
| 807E12310 WET REFLECTIVE EPOXY PAVEMENT MARKING, CHANNELIZIN | 116 FT | $2.00 | $3.15 | $2.00 | $3.00 |
| 807E14110 WET REFLECTIVE THERMOPLASTIC PAVEMENT MARKING, LAN | 7.08 MILE | $2,000 | $2,310 | $2,000 | $2,200 |
| 807E14310 WET REFLECTIVE THERMOPLASTIC PAVEMENT MARKING, CHA | 2,389 FT | $2.00 | $3.15 | $2.00 | $3.00 |
| 807E14410 WET REFLECTIVE THERMOPLASTIC PAVEMENT MARKING, DOT | 4,578 FT | $1.25 | $2.10 | $1.25 | $2.00 |
| 850E10110 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $1.00 | $1.05 | $1.00 | $1.00 |
| 850E10130 GROOVING FOR 12" RECESSED PAVEMENT MARKING | — | $1.25 | $2.10 | $1.25 | $2.00 |
| 850E20010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $3,500 | $3,885 | $3,500 | $3,700 |
| 850E20130 GROOVING FOR 12" RECESSED PAVEMENT MARKING | — | $2.50 | $3.15 | $2.50 | $3.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $12,946 | $8,925 | $8,500 | $8,500 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 100 CY | $125 | $375 | $100 | $250 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 24 SNMT | $1,070 | $1,000 | $1,000 | $950 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 17.38 MILE | $700 | $525 | $700 | $500 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 37.36 MILE | $700 | $840 | $700 | $800 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 5,010 FT | $0.50 | $1.05 | $0.50 | $1.00 |
| 614E24612 WORK ZONE DOTTED LINE, CLASS III, 6", 642 PAINT | 9,156 FT | $0.50 | $0.55 | $0.50 | $0.50 |
| 900E00100 RAILROAD FLAGGING SERVICES | 10,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 202E98200 REMOVAL MISC.: JOINT SEALER | 92 FT | $15.00 | $13.55 | $15.00 | $15.00 |
| 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE | 888 SY | $10.00 | $13.65 | $10.00 | $10.00 |
| 516E31000 JOINT SEALER | 92 FT | $25.00 | $30.05 | $25.00 | $25.00 |
| 519E12510 SPECIAL - PATCHING CONCRETE BRIDGE DECK - TYPE B | 4 SY | $900 | $1,038 | $900 | $900 |
| 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE | 922 SY | $10.00 | $13.65 | $10.00 | $10.00 |
| 516E31000 JOINT SEALER | 92 FT | $25.00 | $30.05 | $25.00 | $25.00 |
| 519E11100 PATCHING CONCRETE STRUCTURE | 7 SF | $250 | $429 | $250 | $250 |
| 519E12510 SPECIAL - PATCHING CONCRETE BRIDGE DECK - TYPE B | 8 SY | $900 | $1,038 | $900 | $900 |
| 202E98200 REMOVAL MISC.: JOINT SEALER | 114 FT | $15.00 | $13.55 | $15.00 | $15.00 |
| 516E31000 JOINT SEALER | 114 FT | $25.00 | $30.05 | $25.00 | $25.00 |
| 519E12510 SPECIAL - PATCHING CONCRETE BRIDGE DECK - TYPE B | 7 SY | $900 | $1,038 | $900 | $900 |
| 516E31000 JOINT SEALER | 105 FT | $25.00 | $30.05 | $25.00 | $25.00 |
| 519E12510 SPECIAL - PATCHING CONCRETE BRIDGE DECK - TYPE B | 11 SY | $900 | $1,038 | $900 | $900 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $5,000 | $5,200 | $4,282 | $10,000 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $31,000 | $32,000 | $25,000 | $35,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $6,840 | $8,500 | $5,000 | $7,500 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $4,860 | $5,500 | $6,000 | $5,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E10300 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 7,891 CY | $216 | $1.70M | 28% |
| 255E15000 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 8,690 SY | $154 | $1.34M | 22% |
| 442E22400 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 804 CY | $610 | $490k | 8% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $490,000 | $490k | 8% |
| 624E10000 MOBILIZATION | 1 LS | $250,000 | $250k | 4% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.50 INCH) | 189,380 SY | $1.3 | $246k | 4% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 525 CY | $315 | $165k | 3% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 225 CY | $700 | $158k | 3% |
| 255E15000 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 945 SY | $154 | $146k | 2% |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 43,070 FT | $2.9 | $125k | 2% |