CLA-Old Reid Park Access Road
CLA County · est $0.3M
Bid dateThursday, June 26—
CLA County · est $0.3M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 2 more items below.
| Item | Quantity | R1Fillmore Construction | R2Cox Paving LLC | % of bid |
|---|---|---|---|---|
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 254 CY | $240 | $230 | 24% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (200 CY | $220 | $231 | 17% |
| 253E01001 PAVEMENT REPAIR, AS PER PLAN | 350 SY | $100 | $60.00 | 14% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (90 CY | $216 | $215 | 8% |
| 304E20000 AGGREGATE BASE | 223 CY | $80.00 | $92.00 | 7% |
| 203E10000 EXCAVATION | 366 CY | $40.00 | $75.00 | 6% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN | — | $3.00 | $3.50 | 6% |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 4 EACH | $2,500 | $1,500 | 4% |
| 204E10000 SUBGRADE COMPACTION | 1,420 SY | $5.00 | $3.00 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $5,000 | $10,000 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $4,700 | $12,500 | 2% |
| 411E10001 STABILIZED CRUSHED AGGREGATE, AS PER PLAN | 20 CY | $200 | $230 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,500 | $1,500 | 1% |
| 407E20000 NON-TRACKING TACK COAT | 910 GAL | $3.50 | $4.25 | 1% |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | 1% |
| 653E10001 TOPSOIL FURNISHED AND PLACED, AS PER PLAN, 4" | 35 CY | $80.00 | $150 | 1% |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $2,500 | $1,500 | 1% |
| 638E10800 VALVE BOX ADJUSTED TO GRADE, (WATER) | 2 EACH | $1,000 | $120 | 1% |
| 642E01200 PARKING LOT STALL MARKING, TYPE 1 | 242 FT | $7.00 | $5.00 | 1% |
| 659E00501 SEEDING AND MULCHING, CLASS 1, AS PER PLAN | 300 SY | $5.00 | $6.00 | 1% |
| Item | Quantity | R1Fillmore Construction | R2Cox Paving LLC |
|---|---|---|---|
| 204E45000 PROOF ROLLING | 1 HOUR | $200 | $300 |
| 642E01702 HANDICAP SYMBOL MARKING, TYPE 1 | 1 EACH | $356 | $500 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 254 CY | $240 | $61k | 24% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (200 CY | $220 | $44k | 17% |
| 253E01001 PAVEMENT REPAIR, AS PER PLAN | 350 SY | $100 | $35k | 14% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (90 CY | $216 | $19k | 8% |
| 304E20000 AGGREGATE BASE | 223 CY | $80 | $18k | 7% |
| 203E10000 EXCAVATION | 366 CY | $40 | $15k | 6% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN | — | $3 | $14k | 6% |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 4 EACH | $2,500 | $10k | 4% |
| 204E10000 SUBGRADE COMPACTION | 1,420 SY | $5 | $7k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $5,000 | $5k | 2% |