BEL-SR 149-02.11
BEL County
Bid dateThursday, July 17—
BEL County
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 11 more items below.
| Item | Quantity | R1Axis Civil Construction LLC | R2Marucci & Gaffney Excavating CO | R3Eclipse CO LLC | R4Turn-key Tunneling INC | R5Stanley Miller Construction Company | R6Ohio-west Virginia Excavating CO | R7S E T INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 611E97400 CONDUIT, MISC.: (96" TUNNEL LINER PLATE STRUCTURE) | 453 FT | $990 | $1,013 | $1,515 | $1,480 | $50.00 | $2,360 | $1,900 | 52% |
| 837E21000 BACKFILL FOR LINER PIPE | 453 FT | $185 | $386 | $522 | $575 | $717 | $291 | $650 | 10% |
| Item | Quantity | R1Axis Civil Construction LLC | R2Marucci & Gaffney Excavating CO | R3Eclipse CO LLC | R4Turn-key Tunneling INC | R5Stanley Miller Construction Company | R6Ohio-west Virginia Excavating CO | R7S E T INC |
|---|---|---|---|---|---|---|---|---|
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 6 FT | $100 | $10.00 | $36.50 | $216 | $25.00 | $411 | $70.00 |
| 202E58100 CATCH BASIN REMOVED | 2 EACH | $1,000 | $10.00 | $251 | $3,240 | $1,000 | $1,250 | $500 |
| 203E10000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 453 FT |
| $150 |
| $155 |
| $215 |
| $240 |
| $1,411 |
| $196 |
| $285 |
| 8% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $40,000 | $76,000 | $70,727 | $24,300 | $65,000 | $73,000 | $110,000 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $20,000 | $56,000 | $55,600 | $90,000 | $29,000 | $40,000 | 5% |
| 601E11000 RIPRAP, TYPE D | 110 SY | $290 | $180 | $245 | $351 | $265 | $394 | $300 | 4% |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $25,000 | $40,000 | $19,854 | $43,200 | $15,000 | $37,700 | $250,000 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $20,000 | $14,500 | $22,555 | $5,400 | $25,000 | $16,300 | $6,000 | 2% |
| 202E70130 SPECIAL - PIPE CLEANOUT OVER 48" | 453 FT | $35.00 | $15.00 | $15.00 | $17.50 | $125 | $114 | $80.00 | 2% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $15,000 | $5,000 | $1,721 | $7,020 | $6,000 | $4,100 | $90,000 | 2% |
| 619E16010 FIELD OFFICE, TYPE B | 5 MNTH | $2,500 | $500 | $890 | $300 | $5,000 | $3,100 | $2,000 | 1% |
| 202E98300 REMOVAL MISC.: RIPRAP REMOVED | 107 SY | $110 | $20.00 | $130 | $270 | $185 | $216 | $225 | 1% |
| 659E00300 TOPSOIL | 262 CY | $40.00 | $15.00 | $94.50 | $108 | $72.00 | $132 | $75.00 | 1% |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $7,500 | $12,000 | $6,563 | $3,240 | $15,000 | $2,000 | $6,000 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,500 | $10,000 | $14,588 | $25,324 | $30,000 | $20,000 | $30,000 | 1% |
| 614E12200 SPECIAL - WORK ZONE GUARDRAIL | 75 FT | $80.00 | $10.00 | $305 | $216 | $75.00 | $94.00 | $85.00 | 1% |
| 611E98470 CATCH BASIN, NO. 2-2B | 1 EACH | $4,500 | $3,000 | $5,841 | $5,184 | $5,000 | $5,000 | $2,000 | 1% |
| 659E10000 SEEDING AND MULCHING | 2,361 SY | $1.50 | $2.00 | $2.00 | $10.80 | $5.00 | $2.00 | $3.00 | 0% |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT (24" DIAM | 24 FT | $140 | $50.00 | $215 | $540 | $150 | $226 | $75.00 | 0% |
| 19 CY |
| $150 |
| $50.00 |
| $108 |
| $54.00 |
| $150 |
| $214 |
| $125 |
| 203E20000 EMBANKMENT | 16 CY | $150 | $50.00 | $125 | $108 | $200 | $132 | $140 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $150 | $5.00 | $125 | $27.00 | $150 | $200 | $200 |
| 659E14000 REPAIR SEEDING AND MULCHING | 118 SY | $1.50 | $0.27 | $2.00 | $22.00 | $3.00 | $2.00 | $5.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.32 TON | $1,250 | $400 | $892 | $2,592 | $800 | $1,600 | $2,000 |
| 659E31000 LIME | 0.49 ACRE | $150 | $10.00 | $156 | $2,052 | $150 | $200 | $6,000 |
| 659E35000 WATER | 13 MGAL | $1.00 | $0.01 | $1.00 | $1.08 | $1.00 | $1.00 | $250 |
| 611E04600 12" CONDUIT, TYPE C | 11 FT | $250 | $200 | $251 | $216 | $50.00 | $192 | $130 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $300 | $50.00 | $350 | $81.00 | $150 | $534 | $450 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E97400 CONDUIT, MISC.: (96" TUNNEL LINER PLATE STRUCTURE) | 453 FT | $990 | $448k | 51% |
| 837E21000 BACKFILL FOR LINER PIPE | 453 FT | $185 | $84k | 10% |
| 611E96560 CONDUIT, WITH FIELD PAVING OF PIPE (96" TUNNEL LIN | 453 FT | $150 | $68k | 8% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $40,000 | $40k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 5% |
| 601E11000 RIPRAP, TYPE D | 110 SY | $290 | $32k | 4% |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $25,000 | $25k | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $20,000 | $20k | 2% |
| 202E70130 SPECIAL - PIPE CLEANOUT OVER 48" | 453 FT | $35 | $16k | 2% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $15,000 | $15k | 2% |