SCI-Shawnee State ODNR FY26
SCI County
Bid dateThursday, July 17—
SCI County
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 11 more items below.
| Item | Quantity | R1Shelly Company | R2Fillmore Construction | R3Allard Excavation LLC | R4Alan Stone CO INC | R5Scioto Valley Paving LLC | % of bid |
|---|---|---|---|---|---|---|---|
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 600 CY | $217 | $210 | $217 | $300 | $295 | 34% |
| 609E26001 CURB, TYPE 6, AS PER PLAN | 2,220 FT | $31.00 | $50.00 | $28.00 | $33.00 | $36.00 | 18% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.5") | 14,402 SY | $3.30 | $2.00 | $3.30 | $3.00 | $3.95 | 12% |
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 391 SY | $53.50 | $44.00 | $53.50 | $50.00 | $55.00 | 5% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 62 CY | $245 | $220 | $245 | $310 | $300 | 4% |
| 624E10000 MOBILIZATION |
| Item | Quantity | R1Shelly Company | R2Fillmore Construction | R3Allard Excavation LLC | R4Alan Stone CO INC | R5Scioto Valley Paving LLC |
|---|---|---|---|---|---|---|
| 202E52990 SPECIAL - PARKING BLOCK REMOVED | 25 EACH | $16.00 | $20.00 | $38.00 | $20.00 | $20.00 |
| 204E10000 SUBGRADE COMPACTION | 370 SY | $1.90 | $10.00 | $11.00 | $6.00 | $4.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 25 SY | $10.00 | $6.50 | $0.05 | $15.00 | $4.50 |
| 659E20000 COMMERCIAL FERTILIZER | 0.5 TON | $891 | $1,400 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1 LS |
| $14,500 |
| $5,000 |
| $47,000 |
| $10,000 |
| $10,000 |
| 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $12,500 | $7,500 | $10,000 | $5,000 | $5,500 | 3% |
| 202E23000 PAVEMENT REMOVED | 370 SY | $33.50 | $10.00 | $25.00 | $20.00 | $15.00 | 3% |
| 202E32000 CURB REMOVED | 1,775 FT | $5.75 | $10.00 | $5.00 | $7.00 | $2.50 | 3% |
| 659E10000 SEEDING AND MULCHING | 493 SY | $16.25 | $4.25 | $4.00 | $4.00 | $4.50 | 2% |
| 644E01200 PARKING LOT STALL MARKING | 3,000 FT | $2.15 | $2.70 | $2.15 | $4.00 | $2.15 | 2% |
| 203E20000 EMBANKMENT | 50 CY | $120 | $100 | $75.00 | $35.00 | $35.00 | 2% |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 5 EACH | $1,050 | $1,500 | $950 | $570 | $800 | 1% |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 5 EACH | $1,050 | $1,500 | $950 | $580 | $800 | 1% |
| 407E20000 NON-TRACKING TACK COAT | 1,296 GAL | $3.90 | $3.00 | $3.90 | $2.50 | $1.00 | 1% |
| 644E00300 CENTER LINE | 0.31 MILE | $12,500 | $12,450 | $12,500 | $15,500 | $12,500 | 1% |
| 614E18600 PORTABLE CHANGEABLE MESSAGE SIGN | 2 SNMT | $1,650 | $1,500 | $1,400 | $1,600 | $2,500 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,000 | $3,500 | $10,000 | $6,000 | $7,700 | 1% |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 2,220 FT | $1.30 | $4.00 | $3.00 | $1.50 | $12.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,000 | $5,000 | $10,000 | $5,000 | $12,000 | 1% |
| $584 |
| $640 |
| $1,200 |
| 659E31000 LIME | 0.01 ACRE | $155 | $450 | $584 | $910 | $1,200 |
| 659E35000 WATER | 6 MGAL | $1.00 | $10.00 | $1.00 | $110 | $1.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 644E00500 STOP LINE | 36 FT | $12.00 | $10.00 | $12.00 | $12.00 | $12.00 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 80 FT | $2.15 | $3.00 | $2.15 | $3.75 | $2.15 |
| 644E01300 LANE ARROW | 6 EACH | $190 | $125 | $190 | $150 | $190 |
| 644E01600 HANDICAP SYMBOL MARKING | 4 EACH | $225 | $120 | $225 | $150 | $225 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 600 CY | $216.75 | $130k | 33% |
| 609E26001 CURB, TYPE 6, AS PER PLAN | 2,220 FT | $31 | $69k | 18% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.5") | 14,402 SY | $3.3 | $48k | 12% |
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 391 SY | $53.5 | $21k | 5% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 62 CY | $245 | $15k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $14,500 | $15k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $12,500 | $13k | 3% |
| 202E23000 PAVEMENT REMOVED | 370 SY | $33.5 | $12k | 3% |
| 202E32000 CURB REMOVED | 1,775 FT | $5.75 | $10k | 3% |
| 659E10000 SEEDING AND MULCHING | 493 SY | $16.25 | $8k | 2% |