| Item | Quantity | R1Kokosing Construction Company INC | R2Melway Paving CO INC | R3Shelly & Sands INC | R4Karvo Companies INC | % of bid |
|---|---|---|---|---|---|---|
| 442E20171 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP | 7,166 CY | $190 | $195 | $191 | $260 | 34% |
| 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 5,121 CY | $210 | $195 | $204 | $260 | 27% |
| 251E01030 PARTIAL DEPTH PAVEMENT REPAIR (442) | 2,376 CY | $210 | $255 | $260 | $200 | 12% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $236,957 | $200,000 | $311,450 | $200,000 | 6% |
| 624E10000 MOBILIZATION | 1 LS | $209,000 | $20,000 | $100,000 | $200,000 | 5% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (3.0") | 146,890 SY | $1.15 | $1.75 | $1.70 |
| Item | Quantity | R1Kokosing Construction Company INC | R2Melway Paving CO INC | R3Shelly & Sands INC | R4Karvo Companies INC |
|---|---|---|---|---|---|
| 202E38000 GUARDRAIL REMOVED | 131.25 FT | $2.40 | $3.00 | $2.40 | $3.00 |
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A | 2 EACH | $295 | $200 | $295 | $200 |
| 209E60500 LINEAR GRADING | 0.04 MILE | $1,400 | $32,000 | $1,800 | $100,000 |
| 209E80000 GRADING MAILBOX APPROACHES | 85 EACH | $10.00 | $50.00 | $80.00 | $50.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $1.75 |
| 4% |
| 253E02000 PAVEMENT REPAIR | 238 CY | $225 | $255 | $290 | $400 | 1% |
| 408E10001 PRIME COAT, AS PER PLAN | 9,856 GAL | $5.00 | $3.80 | $4.00 | $5.00 | 1% |
| 442E22001 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 224 CY | $210 | $195 | $204 | $260 | 1% |
| 617E10100 COMPACTED AGGREGATE | 1,387 CY | $30.00 | $75.00 | $50.00 | $150 | 1% |
| 407E10000 TACK COAT @ 0.09 GAL/SY | 13,296 GAL | $2.90 | $2.50 | $2.15 | $2.25 | 1% |
| 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING | 281 FT | $112 | $145 | $112 | $145 | 1% |
| 621E00100 RPM | 831 EACH | $34.50 | $35.00 | $34.50 | $36.75 | 1% |
| 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA | 20.04 MILE | $1,400 | $400 | $1,800 | $1,500 | 1% |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 30.33 MILE | $900 | $1,000 | $900 | $1,000 | 1% |
| 407E10000 TACK COAT @ 0.06 GAL/SY | 8,840 GAL | $2.90 | $2.50 | $2.15 | $2.25 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $20,000 | $20,000 | $20,000 | $40,000 | 1% |
| 619E16010 FIELD OFFICE, TYPE B | 8 MNTH | $2,500 | $2,200 | $3,000 | $3,000 | 1% |
| 519E12510 SPECIAL - PATCHING CONCRETE BRIDGE DECK, TYPE B | 22.5 SY | $830 | $1,200 | $830 | $830 | 0% |
| 203E20001 EMBANKMENT, AS PER PLAN | 279 CY | $65.00 | $75.00 | $65.00 | $75.00 | 0% |
| 106.25 FT |
| $26.40 |
| $19.00 |
| $26.40 |
| $19.00 |
| 606E17000 RAISING TYPE 5 GUARDRAIL | 1,344 FT | $6.00 | $9.00 | $6.00 | $9.00 |
| 606E17700 REPLACE EXISTING GUARDRAIL BLOCKOUT | 3 EACH | $65.00 | $9.00 | $65.00 | $9.00 |
| 606E26100 ANCHOR ASSEMBLY, TYPE E | 2 EACH | $2,650 | $2,700 | $2,650 | $2,700 |
| 606E27850 ANCHOR ASSEMBLY REBUILT, TYPE E | 11 EACH | $1,320 | $1,300 | $1,320 | $1,300 |
| 606E27900 ANCHOR ASSEMBLY REBUILT, TYPE T | 1 EACH | $940 | $625 | $940 | $625 |
| 623E39501 MONUMENT ASSEMBLY ADJUSTED TO GRADE, AS PER PLAN | 8 EACH | $800 | $600 | $800 | $1,000 |
| 623E39601 MONUMENT ASSEMBLY RECONSTRUCTED TO GRADE, AS PER P | 3 EACH | $1,300 | $1,500 | $2,000 | $2,500 |
| 623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND | 1 LS | $4,000 | $4,150 | $5,000 | $4,150 |
| 832E30000 EROSION CONTROL | 500 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.5") | 512 SY | $8.00 | $1.75 | $1.70 | $5.00 |
| 254E01600 PATCHING PLANED SURFACE | 680 SY | $1.25 | $14.00 | $4.00 | $1.00 |
| 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 25 CY | $210 | $195 | $204 | $500 |
| 617E10100 COMPACTED AGGREGATE (MAILBOXES) | 85 CY | $30.00 | $75.00 | $50.00 | $100 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 831 EACH | $2.00 | $14.00 | $3.00 | $1.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 2 EACH | $14.50 | $13.00 | $14.50 | $13.00 |
| 630E03101 GROUND MOUNTED SUPPORT, NO. 3 POST, AS PER PLAN | 213 FT | $10.00 | $15.00 | $10.00 | $10.00 |
| 630E80100 SIGN, FLAT SHEET | 138 SF | $18.00 | $45.00 | $18.00 | $18.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 20.22 MILE | $795 | $780 | $795 | $795 |
| 642E00300 CENTER LINE, TYPE 1 | 10.11 MILE | $975 | $800 | $975 | $975 |
| 644E00500 STOP LINE | 477 FT | $9.00 | $17.00 | $9.00 | $9.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 100 HOUR | $70.00 | $65.00 | $90.00 | $125 |
| 614E12460 WORK ZONE MARKING SIGN | 71 EACH | $60.00 | $60.00 | $60.00 | $60.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 76 CY | $100 | $275 | $250 | $454 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 1,431 FT | $1.00 | $3.00 | $5.00 | $5.00 |
| 202E98200 REMOVAL MISC.:JOINT SEALER | 70 FT | $12.66 | $29.00 | $12.66 | $12.66 |
| 409E30000 SAWING AND SEALING ASPHALT CONCRETE PAVEMENT JOINT | 60 FT | $25.56 | $42.00 | $25.56 | $25.56 |
| 516E31000 JOINT SEALER | 44 FT | $15.24 | $42.00 | $15.24 | $15.24 |
| 519E12510 SPECIAL - PATCHING CONCRETE BRIDGE DECK, TYPE B | 5.3 SY | $1,068 | $1,450 | $1,068 | $1,068 |
| 202E32000 CURB REMOVED | 2 FT | $170 | $250 | $170 | $170 |
| 509E20001 CONCRETE REINFORCEMENT, REPLACEMENT OF EXISTING CO | 20 LB | $8.17 | $10.00 | $8.17 | $8.17 |
| 511E81100 CONCRETE, MISC.: QC1, CURBING | 8 FT | $171 | $100 | $171 | $171 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 1.2 SY | $148 | $175 | $148 | $148 |
| 517E75601 DEEP BEAM BRIDGE RETROFIT RAILING, AS PER PLAN | 65 FT | $112 | $248 | $112 | $248 |
| 202E38201 GUARDRAIL REMOVED FOR REUSE, AS PER PLAN | 162.5 FT | $14.00 | $8.00 | $14.00 | $8.00 |
| 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING | 112.5 FT | $112 | $131 | $112 | $131 |
| 202E98200 REMOVAL MISC.: JOINT SEALER | 56 FT | $12.66 | $29.00 | $12.66 | $12.66 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 27 SY | $83.40 | $125 | $83.40 | $83.40 |
| 516E31000 JOINT SEALER | 56 FT | $15.24 | $42.00 | $15.24 | $15.24 |
| 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING | 150 FT | $112 | $145 | $112 | $145 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,000 | $10,690 | $12,000 | $5,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E20171 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP | 7,166 CY | $190 | $1.36M | 33% |
| 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 5,121 CY | $210 | $1.08M | 26% |
| 251E01030 PARTIAL DEPTH PAVEMENT REPAIR (442) | 2,376 CY | $210 | $499k | 12% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $236,957 | $237k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $209,000 | $209k | 5% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (3.0") | 146,890 SY | $1.15 | $169k | 4% |
| 253E02000 PAVEMENT REPAIR | 238 CY | $225 | $54k | 1% |
| 408E10001 PRIME COAT, AS PER PLAN | 9,856 GAL | $5 | $49k | 1% |
| 442E22001 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 224 CY | $210 | $47k | 1% |
| 617E10100 COMPACTED AGGREGATE | 1,387 CY | $30 | $42k | 1% |