BRO-US 50-00.00
BRO County · est $1.5M
Bid dateThursday, August 14—
BRO County · est $1.5M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 4 more items below.
| Item | Quantity | R1Brown County Asphalt INC | R2Shelly Company | R3Brown County Construction CO INC | % of bid |
|---|---|---|---|---|---|
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 3,396 CY | $182 | $177 | $220 | 53% |
| 253E01001 PAVEMENT REPAIR, AS PER PLAN | 1,900 SY | $65.00 | $100 | $109 | 10% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.25" | 97,383 SY | $1.00 | $1.25 | $1.64 | 8% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $55,000 | $115,000 | $28,738 | 5% |
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 1,500 SY | $34.00 | $35.00 | $38.60 | 4% |
| 254E01600 PATCHING PLANED SURFACE | 17,404 SY | $2.50 | $2.50 | $1.17 | 4% |
| 644E00104 EDGE LINE, 6" | 10.42 MILE | $3,735 |
| Item | Quantity | R1Brown County Asphalt INC | R2Shelly Company | R3Brown County Construction CO INC |
|---|---|---|---|---|
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 6 EACH | $300 | $390 | $626 |
| 644E00500 STOP LINE | 104 FT | $4.70 | $4.70 | $10.00 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 24 FT | $5.75 | $5.75 | $5.00 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,000 | $2,000 | $4,917 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $3,735 |
| $3,442 |
| 3% |
| 624E10000 MOBILIZATION | 1 LS | $35,000 | $40,000 | $40,000 | 3% |
| 407E20000 NON-TRACKING TACK COAT | 8,765 GAL | $3.50 | $4.10 | $4.50 | 3% |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 20.82 MILE | $915 | $915 | $827 | 2% |
| 644E00300 CENTER LINE | 5.21 MILE | $2,585 | $2,585 | $4,000 | 1% |
| 621E00100 RPM | 291 EACH | $35.65 | $36.75 | $37.75 | 1% |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 12 EACH | $750 | $1,000 | $913 | 1% |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 10.42 MILE | $645 | $645 | $1,652 | 1% |
| 644E00620 CROSSWALK LINE, 12" | 1,400 FT | $4.30 | $4.30 | $5.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,572 | $4,000 | $4,738 | 0% |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 6 EACH | $750 | $1,000 | $913 | 0% |
| 409E30000 SAWING AND SEALING ASPHALT CONCRETE PAVEMENT JOINT | 88 FT | $35.50 | $35.50 | $68.00 | 0% |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 291 EACH | $10.00 | $24.75 | $11.55 | 0% |
| 614E12460 WORK ZONE MARKING SIGN | 24 EACH | $110 | $90.00 | $115 | 0% |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 3,396 CY | $182.4 | $619k | 52% |
| 253E01001 PAVEMENT REPAIR, AS PER PLAN | 1,900 SY | $65 | $124k | 10% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.25" | 97,383 SY | $1 | $97k | 8% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $55,000 | $55k | 5% |
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 1,500 SY | $34 | $51k | 4% |
| 254E01600 PATCHING PLANED SURFACE | 17,404 SY | $2.5 | $44k | 4% |
| 644E00104 EDGE LINE, 6" | 10.42 MILE | $3,735 | $39k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $35,000 | $35k | 3% |
| 407E20000 NON-TRACKING TACK COAT | 8,765 GAL | $3.5 | $31k | 3% |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 20.82 MILE | $915 | $19k | 2% |