FUL-SR 109-16.98 Bridge Replace
FUL County · est $1.3M
Bid dateThursday, August 14—
FUL County · est $1.3M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 40 more items below.
| Item | Quantity | R1Miller Bros Const INC | R2Vernon Nagel INC | R3E S Wagner Company | R4R G Zachrich Construction INC | % of bid |
|---|---|---|---|---|---|---|
| 515E12071 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 11 EACH | $21,681 | $21,700 | $21,000 | $21,764 | 25% |
| 526E25000 REINFORCED CONCRETE APPROACH SLABS (T=15") | 245 SY | $345 | $300 | $350 | $332 | 9% |
| 507E00650 14" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 1,785 FT | $45.10 | $45.00 | $34.00 | $48.00 | 8% |
| 511E31610 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 70 CY | $1,059 | $1,000 | $1,185 | $1,318 | 8% |
| 517E70100 RAILING (THREE STEEL TUBE BRIDGE RAILING) | 146 FT | $458 | $458 | $442 | $442 | 7% |
| 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING | 102 CY | $553 | $525 | $548 |
| Item | Quantity | R1Miller Bros Const INC | R2Vernon Nagel INC | R3E S Wagner Company | R4R G Zachrich Construction INC |
|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $718 | $2,000 | $3,000 | $1,000 |
| 202E23000 PAVEMENT REMOVED | 496 SY | $15.62 | $15.00 | $10.00 | $12.00 |
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 40 FT | $21.13 | $3.00 | $15.00 | $30.00 |
| 202E38000 GUARDRAIL REMOVED | 508 FT | $2.00 | $4.00 | $3.00 | $3.00 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $400 |
| 6% |
| 624E10000 MOBILIZATION | 1 LS | $53,997 | $50,000 | $57,000 | $40,000 | 6% |
| 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN | 1,064 CY | $48.78 | $40.00 | $59.00 | $63.00 | 5% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 25,137 LB | $1.48 | $1.50 | $1.50 | $1.30 | 4% |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 354 CY | $97.64 | $100 | $120 | $102 | 4% |
| 511E44112 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT NOT INCLUD | 43 CY | $776 | $800 | $1,153 | $1,100 | 3% |
| 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 1 LS | $32,902 | $30,000 | $47,300 | $50,000 | 3% |
| 507E00600 14" CAST-IN-PLACE REINFORCED CONCRETE PILES, DRIVE | 1,615 FT | $19.03 | $6.00 | $27.50 | $52.80 | 3% |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 37 CF | $655 | $660 | $655 | $655 | 2% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 45 CY | $300 | $300 | $350 | $375 | 1% |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $13,042 | $82,000 | $10,000 | $16,500 | 1% |
| 526E90010 TYPE A INSTALLATION | 88 FT | $139 | $150 | $187 | $230 | 1% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 30 CY | $390 | $390 | $425 | $400 | 1% |
| 614E12420 DETOUR SIGNING | 1 LS | $11,000 | $11,000 | $11,000 | $14,000 | 1% |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 76 CY | $121 | $100 | $130 | $125 | 1% |
| 3 EACH |
| $145 |
| $145 |
| $250 |
| $250 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 3 EACH | $95.00 | $95.00 | $200 | $200 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 4 EACH | $75.00 | $75.00 | $200 | $200 |
| 204E10000 SUBGRADE COMPACTION | 267 SY | $4.47 | $1.00 | $6.00 | $2.50 |
| 209E60200 LINEAR GRADING | 4 STA | $126 | $40.00 | $2,200 | $2,000 |
| 606E15050 GUARDRAIL, TYPE MGS | 419 FT | $19.00 | $19.00 | $22.00 | $22.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 3 EACH | $2,495 | $2,495 | $2,675 | $2,675 |
| 606E26500 ANCHOR ASSEMBLY, TYPE T | 3 EACH | $920 | $920 | $1,450 | $1,450 |
| 606E32160 BRIDGE TERMINAL ASSEMBLY, TYPE TST | 4 EACH | $1,840 | $1,840 | $2,650 | $2,650 |
| 659E00300 TOPSOIL | 16 CY | $76.79 | $50.00 | $115 | $45.00 |
| 659E10000 SEEDING AND MULCHING | 279 SY | $9.00 | $9.00 | $9.00 | $9.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 14 SY | $12.00 | $12.00 | $12.00 | $12.00 |
| 659E15000 INTER-SEEDING | 14 SY | $5.00 | $5.00 | $5.00 | $5.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.1 TON | $600 | $600 | $600 | $600 |
| 659E35000 WATER | 1 MGAL | $30.00 | $10.00 | $30.00 | $30.00 |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E04900 12" CONDUIT, TYPE D | 72 FT | $63.64 | $40.00 | $45.00 | $80.00 |
| 304E20000 AGGREGATE BASE | 46 CY | $138 | $65.00 | $120 | $80.00 |
| 407E20000 NON-TRACKING TACK COAT | 26 GAL | $1.00 | $1.00 | $1.00 | $4.00 |
| 614E12500 REPLACEMENT SIGN | 3 EACH | $250 | $250 | $250 | $250 |
| 614E18600 PORTABLE CHANGEABLE MESSAGE SIGN | 6 SNMT | $1,150 | $1,150 | $1,800 | $1,150 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 3 EACH | $26.13 | $25.00 | $60.00 | $100 |
| 202E23500 WEARING COURSE REMOVED | 190 SY | $12.25 | $12.25 | $10.00 | $12.00 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 93 SY | $44.30 | $28.00 | $22.00 | $32.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 3 SF | $41.54 | $8.00 | $26.00 | $12.50 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 18 SF | $9.15 | $8.00 | $12.00 | $13.50 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 88 FT | $29.31 | $40.00 | $35.00 | $42.00 |
| 516E41100 1/8" PREFORMED BEARING PAD, TYPE CDP | 22 EACH | $34.54 | $52.00 | $68.00 | $31.00 |
| 516E43100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY ( | 44 EACH | $129 | $120 | $164 | $90.00 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 146 FT | $18.78 | $12.00 | $27.00 | $20.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 152 FT | $6.78 | $14.00 | $9.00 | $12.00 |
| 518E40012 6" NON-PERFORATED CORRUGATED PLASTIC PIPE | 40 FT | $13.16 | $14.00 | $26.00 | $12.00 |
| 523E20000 DYNAMIC LOAD TESTING | 1 EACH | $5,862 | $3,800 | $5,275 | $4,200 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,233 | $12,000 | $5,500 | $17,846 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $4,628 | $3,850 | $3,850 | $5,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $7,290 | $11,000 | $5.00 | $8,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 515E12071 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 11 EACH | $21,681 | $238k | 22% |
| 526E25000 REINFORCED CONCRETE APPROACH SLABS (T=15") | 245 SY | $345.25 | $85k | 8% |
| 507E00650 14" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 1,785 FT | $45.1 | $81k | 7% |
| 511E31610 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 70 CY | $1,059 | $74k | 7% |
| 517E70100 RAILING (THREE STEEL TUBE BRIDGE RAILING) | 146 FT | $458 | $67k | 6% |
| 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING | 102 CY | $552.55 | $56k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $53,997 | $54k | 5% |
| 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN | 1,064 CY | $48.78 | $52k | 5% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 25,137 LB | $1.48 | $37k | 3% |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 354 CY | $97.64 | $35k | 3% |