CUY-IR 480-07.92/VAR Paint
CUY County · est $5.6M
Bid dateThursday, August 28—
CUY County · est $5.6M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 53 more items below.
| Item | Quantity | R1Panther Industrial Painting LLC | R2360 Construction Company INC | R3Euro Paint LLC | R4M & J Construction CO Of Pinellas County | R5Corrosion Resistance LTD | R6Vimas Painting Company INC | R7Apbn INC | R8Elite Contractors INC | R9Legend Painting INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 76,300 SF | $11.00 | $8.00 | $11.25 | $9.00 | $11.15 | $14.00 | $10.00 | $11.00 | $18.00 | 21% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 29,700 SF |
| Item | Quantity | R1Panther Industrial Painting LLC | R2360 Construction Company INC | R3Euro Paint LLC | R4M & J Construction CO Of Pinellas County | R5Corrosion Resistance LTD | R6Vimas Painting Company INC | R7Apbn INC | R8Elite Contractors INC | R9Legend Painting INC |
|---|---|---|---|---|---|---|---|---|---|---|
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $1,000 | $5,000 | $20,000 | $150,000 | $20,000 | $10,000 | $8,000 | $5,000 | $30,000 |
| 832E30000 EROSION CONTROL | 8,000 EACH | $1.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $11.00 |
| $10.00 |
| $10.45 |
| $7.00 |
| $9.00 |
| $16.00 |
| $11.00 |
| $12.00 |
| $18.00 |
| 8% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 21,500 SF | $13.00 | $11.50 | $12.71 | $7.00 | $15.80 | $20.00 | $11.00 | $12.00 | $18.00 | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $250,000 | $325,000 | $231,258 | $620,000 | $295,000 | $380,000 | $500,000 | $400,000 | $1,000,000 | 6% |
| 624E10000 MOBILIZATION | 1 LS | $250,000 | $100,000 | $11,695 | $265,000 | $180,000 | $320,000 | $522,100 | $849,000 | $700,000 | 6% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 22,500 SF | $11.00 | $12.00 | $17.28 | $9.00 | $22.00 | $20.00 | $11.00 | $12.00 | $18.00 | 6% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 22,500 SF | $11.00 | $8.00 | $11.79 | $7.00 | $10.80 | $20.00 | $11.00 | $12.00 | $18.00 | 6% |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 76,300 SF | $2.25 | $5.00 | $2.49 | $4.00 | $2.85 | $3.00 | $5.00 | $3.50 | $8.00 | 4% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 76,300 SF | $2.25 | $3.00 | $2.49 | $5.00 | $3.25 | $3.00 | $5.00 | $3.50 | $8.00 | 4% |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 76,300 SF | $2.25 | $2.00 | $2.49 | $4.00 | $4.15 | $2.50 | $5.00 | $3.50 | $8.00 | 4% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $150,000 | $55,000 | $52,000 | $40,110 | $45,000 | $80,000 | $60,000 | $100,000 | $100,000 | 4% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 4,690 SF | $30.00 | $16.00 | $30.39 | $20.00 | $41.00 | $40.00 | $50.00 | $80.00 | $75.00 | 3% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 11,400 SF | $11.00 | $10.00 | $18.34 | $7.00 | $10.75 | $22.00 | $11.00 | $15.00 | $18.00 | 3% |
| 513E10201 STRUCTURAL STEEL MEMBERS, LEVEL UF, AS PER PLAN | 2,468 LB | $50.00 | $38.10 | $38.10 | $42.78 | $34.60 | $40.00 | $25.00 | $19.60 | $33.50 | 3% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 10,600 SF | $11.00 | $10.00 | $18.43 | $7.00 | $16.40 | $22.00 | $11.00 | $15.00 | $24.00 | 3% |
| 513E10201 STRUCTURAL STEEL MEMBERS, LEVEL UF, AS PER PLAN | 2,767 LB | $40.00 | $36.50 | $36.50 | $40.86 | $33.00 | $35.00 | $25.00 | $18.00 | $38.50 | 3% |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 505 SF | $200 | $335 | $225 | $300 | $330 | $200 | $285 | $400 | $450 | 2% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 500 HOUR | $150 | $95.00 | $95.00 | $168 | $95.00 | $60.00 | $150 | $100 | $150 | 2% |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 29,700 SF | $2.50 | $4.00 | $2.13 | $4.00 | $3.20 | $2.00 | $5.00 | $4.00 | $8.00 | 2% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 29,700 SF | $2.50 | $3.00 | $2.13 | $4.00 | $3.30 | $2.00 | $5.00 | $4.00 | $8.00 | 2% |
| $1.00 |
| $1.00 |
| $1.00 |
| $1.00 |
| $1.00 |
| $1.00 |
| $1.00 |
| $1.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $10,000 | $6,330 | $6,330 | $16,681 | $6,800 | $30,000 | $6,330 | $6,330 | $7,000 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 12 SNMT | $1,000 | $1,207 | $1,207 | $1,388 | $1,000 | $2,000 | $1,200 | $1,207 | $1,300 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 80 MNHR | $200 | $150 | $50.00 | $120 | $115 | $200 | $100 | $100 | $150 |
| 514E10000 FINAL INSPECTION REPAIR | 49 EACH | $300 | $150 | $50.00 | $1,600 | $235 | $200 | $100 | $350 | $500 |
| 630E97700 SIGNING, MISC.: OVERPASS INSTALLATION | 4 EACH | $3,000 | $1,000 | $2,000 | $500 | $250 | $2,000 | $1,000 | $500 | $1,000 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 10,600 SF | $2.25 | $6.00 | $4.01 | $3.00 | $4.85 | $4.00 | $5.00 | $5.00 | $12.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 10,600 SF | $2.25 | $5.00 | $4.01 | $4.00 | $7.15 | $2.00 | $5.00 | $5.00 | $12.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 10,600 SF | $2.25 | $4.00 | $4.01 | $4.00 | $7.25 | $2.00 | $4.00 | $5.00 | $12.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 16 MNHR | $200 | $150 | $50.00 | $120 | $115 | $200 | $100 | $100 | $150 |
| 514E10000 FINAL INSPECTION REPAIR | 11 EACH | $300 | $150 | $50.00 | $1,200 | $235 | $200 | $100 | $350 | $500 |
| 630E97700 SIGNING, MISC.: OVERPASS INSTALLATION | 2 EACH | $3,000 | $1,000 | $2,000 | $500 | $250 | $2,000 | $1,000 | $500 | $1,000 |
| 513E10201 STRUCTURAL STEEL MEMBERS, LEVEL UF, AS PER PLAN | 279 LB | $70.00 | $65.68 | $65.68 | $75.42 | $62.18 | $70.00 | $44.50 | $52.68 | $73.50 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 11,400 SF | $2.50 | $6.00 | $3.59 | $3.00 | $6.25 | $4.00 | $5.00 | $5.00 | $8.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 11,400 SF | $2.50 | $4.00 | $3.59 | $4.00 | $6.00 | $4.00 | $4.00 | $5.00 | $8.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 11,400 SF | $2.50 | $3.00 | $3.59 | $4.00 | $6.00 | $4.00 | $4.00 | $5.00 | $8.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 16 MNHR | $200 | $150 | $50.00 | $120 | $115 | $200 | $100 | $100 | $150 |
| 514E10000 FINAL INSPECTION REPAIR | 11 EACH | $300 | $150 | $50.00 | $1,200 | $235 | $200 | $100 | $350 | $500 |
| 630E97700 SIGNING, MISC.: OVERPASS INSTALLATION | 2 EACH | $3,000 | $1,000 | $2,000 | $500 | $250 | $2,000 | $1,000 | $500 | $1,000 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 21,500 SF | $3.00 | $5.00 | $3.04 | $4.00 | $4.40 | $2.00 | $4.00 | $4.00 | $8.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 21,500 SF | $3.00 | $4.00 | $3.04 | $4.00 | $5.45 | $2.00 | $4.00 | $4.00 | $8.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 21,500 SF | $3.00 | $3.00 | $3.04 | $4.00 | $5.55 | $2.00 | $4.00 | $4.00 | $8.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 22 MNHR | $200 | $150 | $50.00 | $120 | $115 | $200 | $100 | $100 | $150 |
| 514E10000 FINAL INSPECTION REPAIR | 13 EACH | $300 | $150 | $50.00 | $1,300 | $235 | $200 | $100 | $350 | $500 |
| 513E10201 STRUCTURAL STEEL MEMBERS, LEVEL UF, AS PER PLAN | 331 LB | $50.00 | $46.82 | $46.82 | $52.79 | $43.32 | $50.00 | $44.50 | $33.82 | $53.50 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 22,500 SF | $2.50 | $5.00 | $3.80 | $4.00 | $4.25 | $2.00 | $5.00 | $4.00 | $8.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 22,500 SF | $2.50 | $3.00 | $3.80 | $5.00 | $6.25 | $2.00 | $5.00 | $4.00 | $8.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 22,500 SF | $2.50 | $2.00 | $3.80 | $4.00 | $8.10 | $2.00 | $4.00 | $4.00 | $8.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 32 MNHR | $200 | $150 | $50.00 | $120 | $115 | $200 | $100 | $100 | $150 |
| 514E10000 FINAL INSPECTION REPAIR | 20 EACH | $300 | $150 | $50.00 | $1,600 | $235 | $200 | $100 | $350 | $500 |
| 516E46200 BEARING DEVICE, ROCKER | 5 EACH | $3,000 | $2,930 | $2,930 | $4,856 | $2,930 | $4,500 | $3,000 | $830 | $1,000 |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $20,000 | $15,650 | $15,650 | $30,780 | $15,650 | $20,000 | $22,000 | $15,650 | $20,000 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 10 SF | $200 | $1,200 | $924 | $300 | $1,085 | $500 | $500 | $5,000 | $450 |
| 513E10201 STRUCTURAL STEEL MEMBERS, LEVEL UF, AS PER PLAN | 141 LB | $70.00 | $65.95 | $65.95 | $75.74 | $65.95 | $70.00 | $44.50 | $52.95 | $73.50 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 22,500 SF | $2.50 | $5.00 | $2.37 | $4.00 | $3.55 | $2.00 | $5.00 | $4.00 | $8.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 22,500 SF | $2.50 | $3.00 | $2.37 | $4.00 | $4.60 | $2.00 | $5.00 | $4.00 | $8.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 22,500 SF | $2.50 | $2.00 | $2.37 | $4.00 | $4.60 | $2.00 | $4.00 | $4.00 | $8.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 33 MNHR | $200 | $150 | $50.00 | $120 | $115 | $200 | $100 | $100 | $150 |
| 514E10000 FINAL INSPECTION REPAIR | 21 EACH | $300 | $150 | $50.00 | $1,300 | $235 | $200 | $100 | $350 | $500 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 29,700 SF | $2.50 | $2.00 | $2.13 | $4.00 | $3.40 | $2.00 | $5.00 | $4.00 | $8.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 25 MNHR | $200 | $150 | $50.00 | $120 | $115 | $200 | $100 | $100 | $150 |
| 514E10000 FINAL INSPECTION REPAIR | 20 EACH | $300 | $150 | $50.00 | $1,000 | $235 | $200 | $100 | $350 | $500 |
| 530E00200 SPECIAL - STRUCTURES UNDER BRIDGE CLEANING | 1 LS | $8,000 | $15,000 | $50,000 | $6,000 | $6,900 | $5,000 | $20,000 | $30,000 | $20,000 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 4,690 SF | $4.25 | $8.00 | $12.02 | $10.00 | $11.70 | $12.00 | $10.00 | $15.00 | $10.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 4,690 SF | $4.25 | $6.00 | $12.02 | $10.00 | $11.30 | $12.00 | $10.00 | $15.00 | $10.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 4,690 SF | $4.25 | $4.00 | $12.02 | $10.00 | $17.25 | $12.00 | $10.00 | $15.00 | $10.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 9 MNHR | $200 | $150 | $50.00 | $120 | $115 | $200 | $100 | $100 | $150 |
| 514E10000 FINAL INSPECTION REPAIR | 4 EACH | $300 | $150 | $50.00 | $1,600 | $235 | $400 | $100 | $350 | $500 |
| 630E97700 SIGNING, MISC.: OVERPASS INSTALLATION | 1 EACH | $3,000 | $1,000 | $2,000 | $500 | $250 | $2,000 | $1,751 | $500 | $1,000 |
| 619E16021 FIELD OFFICE, TYPE C, AS PER PLAN | 12 MNTH | $100 | $5,000 | $2,000 | $5,000 | $4,000 | $4,000 | $10,000 | $1,500 | $5,000 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $1,000 | $500 | $6,240 | $30,000 | $6,500 | $5,000 | $10,000 | $5,000 | $10,000 |
| 690E98400 SPECIAL - CITY OF CLEVELAND PERMITS | 1 LS | $10,000 | $1,500 | $3,000 | $15,000 | $2,000 | $1,000 | $2,200 | $5,000 | $50,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 76,300 SF | $11 | $839k | 16% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 29,700 SF | $11 | $327k | 6% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 21,500 SF | $13 | $280k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $250,000 | $250k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $250,000 | $250k | 5% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 22,500 SF | $11 | $248k | 5% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 22,500 SF | $11 | $248k | 5% |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 76,300 SF | $2.25 | $172k | 3% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 76,300 SF | $2.25 | $172k | 3% |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 76,300 SF | $2.25 | $172k | 3% |