TRU-SR 193-00.00
TRU County · est $1.1M
Bid dateThursday, August 28—
TRU County · est $1.1M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 21 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Karvo Companies INC | R3Shelly Company | R4Barbicas Construction Company INC | % of bid |
|---|---|---|---|---|---|---|
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 2,563 CY | $226 | $230 | $255 | $275 | 57% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $85,890 | $79,900 | $95,000 | $58,000 | 8% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A (T=1 1 | 73,784 SY | $1.00 | $2.00 | $2.80 | $3.00 | 7% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 600 SY | $82.00 | $50.00 | $105 | $27.00 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $105,000 | $40,000 | $100,000 | 4% |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 17 EACH | $1,600 | $1,600 |
| Item | Quantity | R1Shelly & Sands INC | R2Karvo Companies INC | R3Shelly Company | R4Barbicas Construction Company INC |
|---|---|---|---|---|---|
| 202E32000 CURB REMOVED | 42 FT | $25.00 | $60.00 | $20.00 | $17.00 |
| 202E32500 CURB AND GUTTER REMOVED | 68 FT | $50.00 | $50.00 | $30.00 | $25.00 |
| 608E10000 4" CONCRETE WALK | 187 SF | $12.50 | $15.00 | $22.00 | $20.00 |
| 690E91000 SPECIAL - AS-BUILT CONSTRUCTION PLANS | 1 LS | $2,200 | $500 | $10,000 | $100 |
| 832E30000 EROSION CONTROL |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $1,600 |
| $1,700 |
| 3% |
| 407E20000 NON-TRACKING TACK COAT @0.09 GAL/SY | 6,641 GAL | $3.05 | $2.35 | $2.50 | $3.50 | 2% |
| 608E52000 CURB RAMP | 818 SF | $24.50 | $15.00 | $27.00 | $20.00 | 2% |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $3,200 | $3,200 | $3,200 | $1,800 | 2% |
| 621E00100 RPM | 533 EACH | $34.60 | $34.60 | $36.95 | $45.50 | 2% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 150 HOUR | $90.00 | $110 | $120 | $80.00 | 1% |
| 646E10200 CENTER LINE | 3 MILE | $3,350 | $3,350 | $3,695 | $3,350 | 1% |
| 202E30000 WALK REMOVED | 915 SF | $10.00 | $6.00 | $10.00 | $10.00 | 1% |
| 623E39501 MONUMENT ASSEMBLY ADJUSTED TO GRADE, AS PER PLAN | 7 EACH | $1,200 | $1,200 | $1,200 | $1,500 | 1% |
| 646E10110 LANE LINE, 6" | 3.94 MILE | $1,800 | $1,800 | $1,999 | $1,800 | 1% |
| 646E20300 LANE ARROW | 38 EACH | $185 | $185 | $155 | $185 | 1% |
| 646E10400 STOP LINE | 544 FT | $12.00 | $12.00 | $12.00 | $12.00 | 1% |
| 646E10310 CHANNELIZING LINE, 12" | 3,360 FT | $1.75 | $1.75 | $1.79 | $1.75 | 1% |
| 646E10520 CROSSWALK LINE, 24" | 480 FT | $12.00 | $12.00 | $12.00 | $12.00 | 1% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $500 | $50.00 | $175 | $280 | 0% |
| 3,000 EACH |
| $1.00 |
| $1.00 |
| $1.00 |
| $1.00 |
| 611E99700 SPECIAL - GAS VALVE BOX ADJUSTED TO GRADE | 4 EACH | $100 | $1,100 | $1,100 | $200 |
| 609E26000 CURB, TYPE 6 | 3 FT | $100 | $50.00 | $70.00 | $50.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 424 EACH | $5.00 | $1.00 | $6.00 | $10.00 |
| 646E20370 TWO WAY LEFT TURN ARROW | 10 EACH | $200 | $200 | $175 | $200 |
| 646E20504 DOTTED LINE, 6" | 215 FT | $1.25 | $1.25 | $3.00 | $1.25 |
| 614E12460 WORK ZONE MARKING SIGN | 4 EACH | $65.00 | $65.00 | $65.00 | $65.00 |
| 614E20010 WORK ZONE LANE LINE, CLASS I, 6" | 3.94 MILE | $550 | $550 | $750 | $550 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 3.94 MILE | $550 | $550 | $750 | $550 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 3 MILE | $1,200 | $1,200 | $1,500 | $1,200 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 3 MILE | $1,200 | $1,200 | $1,500 | $1,200 |
| 614E23010 WORK ZONE CHANNELIZING LINE, CLASS I, 12" | 3,360 FT | $0.75 | $0.75 | $0.75 | $0.75 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 3,360 FT | $0.75 | $0.75 | $0.75 | $0.75 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 544 FT | $3.50 | $3.50 | $4.00 | $3.50 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 544 FT | $3.50 | $3.50 | $4.00 | $3.50 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,500 | $15,000 | $10,000 | $8,500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,000 | $2,500 | $7,000 | $1,800 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 2,563 CY | $226 | $579k | 55% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $85,890 | $86k | 8% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A (T=1 1 | 73,784 SY | $1 | $74k | 7% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 600 SY | $82 | $49k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 4% |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 17 EACH | $1,600 | $27k | 3% |
| 407E20000 NON-TRACKING TACK COAT @0.09 GAL/SY | 6,641 GAL | $3.05 | $20k | 2% |
| 608E52000 CURB RAMP | 818 SF | $24.5 | $20k | 2% |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $3,200 | $19k | 2% |
| 621E00100 RPM | 533 EACH | $34.6 | $18k | 2% |