COL-SR 39/SR 45-13.06/00.37
COL County · est $1.3M
Bid dateThursday, September 25—
COL County · est $1.3M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 25 more items below.
| Item | Quantity | R1Nls Paving, INC | R2Shelly Company | R3Karvo Companies INC | R4Barbicas Construction Company INC | % of bid |
|---|---|---|---|---|---|---|
| 422E11001 AGGREGATE, SINGLE CHIP SEAL, TYPE A, AS PER PLAN | 122,214 SY | $1.50 | $1.60 | $1.50 | $1.50 | 15% |
| 441E10100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG | 667 CY | $250 | $265 | $260 | $350 | 13% |
| 422E25000 EMULSION, CHIP SEAL | 45,218 GAL | $3.55 | $3.15 | $3.00 | $3.55 | 13% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $125,000 | $192,500 | $105,000 | $150,000 | 10% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (536 CY | $230 | $240 | $234 | $350 | 10% |
| 886E11000 FOG SEAL | 18,332 GAL | $3.55 | $3.15 | $3.00 |
| Item | Quantity | R1Nls Paving, INC | R2Shelly Company | R3Karvo Companies INC | R4Barbicas Construction Company INC |
|---|---|---|---|---|---|
| 202E30000 WALK REMOVED | 164 SF | $25.00 | $12.00 | $25.00 | $25.00 |
| 607E98000 FENCE, MISC.: TEMPORARTY ORANGE PLASTIC CONSTRUCTI | 138 FT | $5.00 | $15.00 | $5.00 | $6.50 |
| 608E10000 4" CONCRETE WALK | 16 SF | $110 | $95.00 | $75.00 | $40.00 |
| 608E53021 DETECTABLE WARNING, AS PER PLAN | 164 SF | $45.00 | $80.00 | $25.00 | $80.00 |
| 690E50100 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $3.55 |
| 5% |
| 624E10000 MOBILIZATION | 1 LS | $65,000 | $40,000 | $125,000 | $100,000 | 5% |
| 253E02000 PAVEMENT REPAIR | 100 CY | $600 | $600 | $700 | $300 | 5% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN (2 | 19,464 SY | $3.00 | $3.25 | $5.00 | $7.00 | 5% |
| 621E00100 RPM | 1,228 EACH | $37.00 | $37.00 | $34.00 | $34.50 | 4% |
| 642E30030 REMOVAL OF PAVEMENT MARKING | 24.09 MILE | $1,299 | $1,100 | $1,190 | $1,100 | 2% |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 1,228 EACH | $25.00 | $15.00 | $10.05 | $12.00 | 2% |
| 623E39601 MONUMENT ASSEMBLY RECONSTRUCTED TO GRADE, AS PER P | 11 EACH | $2,300 | $2,000 | $1,700 | $1,200 | 2% |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 27.57 MILE | $895 | $1,150 | $900 | $1,150 | 2% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 40 CY | $590 | $975 | $800 | $300 | 2% |
| 441E70501 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449) | — | $600 | $500 | $381 | $400 | 1% |
| 642E00104 EDGE LINE, 6", TYPE 1 (WHITE) | 16.06 MILE | $917 | $725 | $900 | $725 | 1% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 108 CY | $130 | $100 | $125 | $150 | 1% |
| 202E23500 WEARING COURSE REMOVED | 929 SY | $15.00 | $7.65 | $4.00 | $7.00 | 1% |
| 614E21500 WORK ZONE CENTER LINE, CLASS II, 642 PAINT | 27.57 MILE | $500 | $600 | $725 | $500 | 1% |
| 3 EACH |
| $400 |
| $350 |
| $500 |
| $250 |
| 690E50200 SPECIAL - MAILBOX SUPPORT SYSTEM, DOUBLE | 8 EACH | $400 | $450 | $750 | $300 |
| 659E98000 SEEDING, MISC.: CURB RAMP GRADING | 9 SY | $50.00 | $125 | $10.00 | $100 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 100 FT | $12.00 | $5.00 | $25.00 | $20.00 |
| 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE | 1 EACH | $5,850 | $3,500 | $2,500 | $1,500 |
| 407E20000 NON-TRACKING TACK COAT | 2,661 GAL | $3.25 | $3.00 | $2.45 | $4.00 |
| 408E10001 PRIME COAT, AS PER PLAN | 690 GAL | $4.50 | $6.00 | $8.00 | $6.50 |
| 617E20001 SHOULDER PREPARATION, AS PER PLAN | 1,724 SY | $0.50 | $1.50 | $5.00 | $5.00 |
| 642E00300 CENTER LINE, TYPE 1 | 8.03 MILE | $1,040 | $995 | $1,050 | $995 |
| 642E00500 STOP LINE, TYPE 1 | 17 FT | $15.00 | $5.00 | $9.00 | $5.00 |
| 646E10010 EDGE LINE, 6", TYPE 1 (WHITE) | 2.16 MILE | $3,333 | $3,575 | $2,340 | $3,500 |
| 646E10200 CENTER LINE, TYPE 1 | 1.16 MILE | $3,999 | $3,985 | $4,100 | $4,000 |
| 646E10300 CHANNELIZING LINE, 8" | 205 FT | $1.95 | $2.50 | $2.00 | $2.50 |
| 646E10400 STOP LINE | 58 FT | $15.00 | $12.75 | $12.00 | $12.75 |
| 646E20300 LANE ARROW | 4 EACH | $170 | $175 | $160 | $175 |
| 614E12460 WORK ZONE MARKING SIGN | 57 EACH | $82.00 | $70.00 | $111 | $70.00 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 205 FT | $4.00 | $0.50 | $2.00 | $0.50 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 171 FT | $10.00 | $3.00 | $4.50 | $3.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,000 | $7,500 | $18,000 | $20,000 |
| 619E16010 FIELD OFFICE, TYPE B | 4 MNTH | $2,500 | $2,500 | $3,500 | $2,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 422E11001 AGGREGATE, SINGLE CHIP SEAL, TYPE A, AS PER PLAN | 122,214 SY | $1.5 | $183k | 14% |
| 441E10100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG | 667 CY | $250 | $167k | 12% |
| 422E25000 EMULSION, CHIP SEAL | 45,218 GAL | $3.55 | $161k | 12% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $125,000 | $125k | 9% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (536 CY | $230 | $123k | 9% |
| 886E11000 FOG SEAL | 18,332 GAL | $3.55 | $65k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $65,000 | $65k | 5% |
| 253E02000 PAVEMENT REPAIR | 100 CY | $600 | $60k | 4% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN (2 | 19,464 SY | $3 | $58k | 4% |
| 621E00100 RPM | 1,228 EACH | $37 | $45k | 3% |