CLI-Culverts FY26
CLI County · est $0.4M
Bid dateThursday, October 9—
CLI County · est $0.4M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 2 more items below.
| Item | Quantity | R1Madex Construction CO | R2Axis Civil Construction LLC | % of bid |
|---|---|---|---|---|
| 899E10000 CURED-IN-PLACE PIPE LINER, 49" x 33" | 102 FT | $1,100 | $1,050 | 23% |
| 899E10000 CURED-IN-PLACE PIPE LINER, 58" x 36" | 84 FT | $1,158 | $1,390 | 20% |
| 899E10000 CURED-IN-PLACE PIPE LINER, 54" | 42 FT | $1,436 | $1,610 | 13% |
| 624E10000 MOBILIZATION | 1 LS | $50,619 | $50,000 | 11% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $27,331 | $50,000 | 6% |
| 611E96550 FIELD PAVING OF EXISTING PIPE, 92" x 66" CMP | 46 FT | $435 | $380 | 4% |
| 611E97700 CONDUIT, MISC.: CMP REPAIR METHOD A | 125 SF | $116 | $175 | 3% |
| 202E70130 SPECIAL - PIPE CLEANOUT OVER 48" | 186 FT | $71.37 | $300 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,653 | $5,000 | 2% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN, CL | 1 LS | $10,365 | $7,500 | 2% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN, CL | 1 LS | $10,365 | $8,500 | 2% |
| 611E96650 SPECIAL - GROUTING VOIDS AROUND CORRUGATED METAL P | 2 CY | $4,632 | $12,000 | 2% |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER, 58" x | 20 CY | $430 | $275 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $7,563 | $15,000 | 2% |
| 659E00300 TOPSOIL | 86 CY | $86.84 | $65.00 | 2% |
| 602E20000 CONCRETE MASONRY | 2.66 CY | $2,510 | $4,900 | 1% |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | 1% |
| 659E10000 SEEDING AND MULCHING | 775 SY | $5.79 | $6.00 | 1% |
| 623E40520 RIGHT-OF-WAY MONUMENT, TYPE B | 4 EACH | $868 | $400 | 1% |
| 659E20000 COMMERCIAL FERTILIZER | 0.1 TON | $1,158 | $800 | 0% |
| Item | Quantity | R1Madex Construction CO | R2Axis Civil Construction LLC |
|---|---|---|---|
| 659E31000 LIME | 0.16 ACRE | $290 | $500 |
| 659E35000 WATER | 4.2 MGAL | $1.13 | $1.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 899E10000 CURED-IN-PLACE PIPE LINER, 49" x 33" | 102 FT | $1,100 | $112k | 23% |
| 899E10000 CURED-IN-PLACE PIPE LINER, 58" x 36" | 84 FT | $1,158 | $97k | 20% |
| 899E10000 CURED-IN-PLACE PIPE LINER, 54" | 42 FT | $1,436 | $60k | 13% |
| 624E10000 MOBILIZATION | 1 LS | $50,619 | $51k | 11% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $27,331 | $27k | 6% |
| 611E96550 FIELD PAVING OF EXISTING PIPE, 92" x 66" CMP | 46 FT | $434.82 | $20k | 4% |
| 611E97700 CONDUIT, MISC.: CMP REPAIR METHOD A | 125 SF | $115.79 | $14k | 3% |
| 202E70130 SPECIAL - PIPE CLEANOUT OVER 48" | 186 FT | $71.37 | $13k | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,653 | $11k | 2% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN, CL | 1 LS | $10,365 | $10k | 2% |