WOO-/SAN-US 20/US 65-00.00/19.38 Res
WOO County · est $5.0M
Bid dateThursday, October 9—
WOO County · est $5.0M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 45 more items below.
| Item | Quantity | R1Shelly Company | R2Gerken Paving INC | R3Kokosing Construction Company INC | R4Henry W Bergman INC | % of bid |
|---|---|---|---|---|---|---|
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 11,429 CY | $208 | $218 | $225 | $222 | 56% |
| 253E02000 PAVEMENT REPAIR | 4,019 CY | $210 | $213 | $210 | $292 | 20% |
| 897E01011 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A, AS PE | 175,839 SY | $1.62 | $1.62 | $1.50 | $1.40 | 7% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1 3/4" | 59,253 SY | $1.55 | $1.80 | $2.00 | $1.65 | 2% |
| 257E10000 DIAMOND GRINDING PORTLAND CEMENT CONCRETE PAVEMENT | 15,115 SY | $5.75 | $4.54 | $4.54 | $5.50 | 2% |
| 872E10000 VOID REDUCING ASPHALT MEMBRANE (VRAM) | 37,566 FT | $2.25 | $2.50 |
| Item | Quantity | R1Shelly Company | R2Gerken Paving INC | R3Kokosing Construction Company INC | R4Henry W Bergman INC |
|---|---|---|---|---|---|
| 202E38000 GUARDRAIL REMOVED | 1,900 FT | $2.00 | $2.00 | $2.00 | $2.20 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 8 EACH | $145 | $145 | $250 | $160 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 7 EACH | $95.00 | $95.00 | $250 | $105 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 4 EACH | $65.00 | $65.00 | $250 | $72.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $3.50 |
| $3.30 |
| 2% |
| 624E10000 MOBILIZATION | 1 LS | $80,000 | $135,000 | $250,000 | $100,000 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $70,000 | $170,000 | $273,350 | $100,000 | 2% |
| 621E00100 RPM | 1,233 EACH | $34.50 | $34.50 | $33.75 | $38.00 | 1% |
| 606E15050 GUARDRAIL, TYPE MGS | 2,113 FT | $19.00 | $19.00 | $19.00 | $21.00 | 1% |
| 407E10000 TACK COAT | 19,740 GAL | $2.00 | $2.25 | $2.50 | $4.00 | 1% |
| 809E69100 STOP LINE RADAR DETECTION | 4 EACH | $9,050 | $9,050 | $9,050 | $10,000 | 1% |
| 209E60500 LINEAR GRADING | 8 MILE | $3,500 | $1,750 | $2,400 | $1,500 | 1% |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 29 MILE | $850 | $825 | $750 | $930 | 1% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 9 EACH | $2,420 | $2,420 | $2,375 | $2,620 | 1% |
| 617E10100 COMPACTED AGGREGATE | 240 CY | $90.00 | $100 | $75.00 | $85.00 | 1% |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 22 MILE | $850 | $925 | $750 | $930 | 0% |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 20 SNMT | $850 | $1,500 | $900 | $950 | 0% |
| 659E00300 TOPSOIL | 164 CY | $100 | $46.00 | $100 | $85.00 | 0% |
| 642E00104 EDGE LINE, 6", TYPE 1 | 15 MILE | $850 | $825 | $850 | $930 | 0% |
| 209E15000 RESHAPING UNDER GUARDRAIL |
| 34 STA |
| $35.00 |
| $35.00 |
| $75.00 |
| $38.00 |
| 606E15150 GUARDRAIL, TYPE MGS HALF POST SPACING | 75 FT | $27.20 | $27.20 | $23.00 | $30.00 |
| 606E15250 GUARDRAIL, TYPE MGS QUARTER POST SPACING | 63 FT | $41.40 | $41.40 | $28.00 | $45.00 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 6 EACH | $1,340 | $1,340 | $1,200 | $1,500 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $2,550 | $2,550 | $2,250 | $2,800 |
| 623E39500 MONUMENT ASSEMBLY ADJUSTED TO GRADE | 3 EACH | $950 | $1,125 | $665 | $1,000 |
| 625E31510 PULL BOX REMOVED | 13 EACH | $350 | $830 | $350 | $250 |
| 659E10000 SEEDING AND MULCHING | 1,473 SY | $3.88 | $3.80 | $2.50 | $2.25 |
| 659E14000 REPAIR SEEDING AND MULCHING | 74 SY | $1.80 | $1.80 | $10.00 | $16.00 |
| 659E15000 INTER-SEEDING | 74 SY | $0.10 | $0.10 | $10.00 | $8.00 |
| 659E20000 COMMERCIAL FERTILIZER | 1 TON | $124 | $124 | $1,800 | $880 |
| 659E35000 WATER | 8 MGAL | $1.00 | $1.00 | $15.00 | $11.00 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 618E40200 RUMBLE STRIPS, SHOULDER (CONCRETE) | 1,547 FT | $1.09 | $1.09 | $1.09 | $2.00 |
| 618E40600 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 8 MILE | $875 | $875 | $875 | $1,000 |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 5,548 LB | $1.00 | $2.00 | $0.78 | $2.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 1,233 EACH | $5.30 | $5.30 | $2.30 | $6.00 |
| 626E00116 BARRIER REFLECTOR, TYPE 5, BIDIRECTIONAL | 52 EACH | $13.65 | $13.65 | $13.00 | $15.00 |
| 642E00204 LANE LINE, 6", TYPE 1 | 8 MILE | $550 | $625 | $550 | $600 |
| 642E00300 CENTER LINE, TYPE 1 | 11 MILE | $850 | $925 | $850 | $930 |
| 644E00400 CHANNELIZING LINE, 8" | 1,861 FT | $2.00 | $2.00 | $2.00 | $2.20 |
| 644E00500 STOP LINE | 371 FT | $7.00 | $8.00 | $7.00 | $7.70 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 24 FT | $7.00 | $10.00 | $7.00 | $7.70 |
| 644E01300 LANE ARROW | 78 EACH | $95.00 | $110 | $95.00 | $105 |
| 644E01510 DOTTED LINE, 6" | 926 FT | $1.50 | $2.00 | $1.50 | $2.00 |
| 632E90020 REMOVAL OF MISCELLANEOUS TRAFFIC SIGNAL ITEM: LOOP | 1 EACH | $2,500 | $2,500 | $2,500 | $2,700 |
| 632E90500 SIGNALIZATION, MISC.: UNLASH AND RELASH MESSENGER | 515 FT | $3.00 | $3.00 | $3.00 | $3.30 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 50 HOUR | $65.00 | $98.00 | $130 | $85.00 |
| 614E12460 WORK ZONE MARKING SIGN | 30 EACH | $85.00 | $120 | $105 | $95.00 |
| 614E12484 WORK ZONE INCREASED PENALTIES SIGN | 6 EACH | $200 | $130 | $250 | $220 |
| 614E12500 REPLACEMENT SIGN | 5 EACH | $133 | $130 | $239 | $150 |
| 614E12600 REPLACEMENT DRUM | 5 EACH | $45.00 | $55.00 | $55.00 | $50.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 6 SNMT | $1,000 | $1,400 | $1,350 | $1,100 |
| 614E20000 WORK ZONE LANE LINE, CLASS I, 4" | 16 MILE | $550 | $530 | $450 | $600 |
| 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, 8" | 1,861 FT | $0.50 | $1.00 | $0.35 | $0.60 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 1,861 FT | $0.50 | $1.00 | $0.35 | $0.60 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 371 FT | $3.00 | $3.00 | $2.00 | $3.30 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 371 FT | $3.00 | $3.00 | $2.00 | $3.30 |
| 614E30000 WORK ZONE ARROW, CLASS I | 156 EACH | $35.00 | $60.00 | $30.00 | $38.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,000 | $22,000 | $20,000 | $30,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $11,010 | $11,010 | $5,800 | $15,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 11,429 CY | $208 | $2.38M | 54% |
| 253E02000 PAVEMENT REPAIR | 4,019 CY | $210 | $844k | 19% |
| 897E01011 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A, AS PE | 175,839 SY | $1.62 | $285k | 6% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1 3/4" | 59,253 SY | $1.55 | $92k | 2% |
| 257E10000 DIAMOND GRINDING PORTLAND CEMENT CONCRETE PAVEMENT | 15,115 SY | $5.75 | $87k | 2% |
| 872E10000 VOID REDUCING ASPHALT MEMBRANE (VRAM) | 37,566 FT | $2.25 | $85k | 2% |
| 624E10000 MOBILIZATION | 1 LS | $80,000 | $80k | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $70,000 | $70k | 2% |
| 621E00100 RPM | 1,233 EACH | $34.5 | $43k | 1% |
| 606E15050 GUARDRAIL, TYPE MGS | 2,113 FT | $19 | $40k | 1% |