BRO-US 62-27.42
BRO County · est $1.0M
Bid dateThursday, October 23—
BRO County · est $1.0M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 28 more items below.
| Item | Quantity | R1Fillmore Construction | R2John R Jurgensen Company | R3Alan Stone CO INC | R4Axis Civil Construction LLC | R5Sunesis Construction CO | % of bid |
|---|---|---|---|---|---|---|---|
| 203E20000 EMBANKMENT | 9,700 CY | $30.00 | $25.90 | $40.00 | $32.50 | $51.14 | 33% |
| 611E28000 84" CONDUIT, TYPE A (FOR PIPE ALLOWABLE MATERIALS, | 159 FT | $1,000 | $901 | $400 | $980 | $635 | 18% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 691 CY | $180 | $225 | $240 | $215 | $213 | 14% |
| 614E15000 SPECIAL - CALENDAR DAYS OF CONTRACT TIME FOR OPENI | 4,500 DLR | $10.00 | $35.00 | $40.00 | $45.00 | $40.00 | 5% |
| 304E20000 AGGREGATE BASE | 478 CY | $80.00 | $71.65 | $70.00 | $90.00 | $76.90 | 4% |
| 832E30000 EROSION CONTROL | 33,250 EACH |
| Item | Quantity | R1Fillmore Construction | R2John R Jurgensen Company | R3Alan Stone CO INC | R4Axis Civil Construction LLC | R5Sunesis Construction CO |
|---|---|---|---|---|---|---|
| 202E38000 GUARDRAIL REMOVED | 599 FT | $2.00 | $6.00 | $5.50 | $6.00 | $4.52 |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT (5'-0" SP | 48 FT | $100 | $762 | $230 | $400 | $341 |
| 204E45000 PROOF ROLLING | 2 HOUR | $200 | $228 | $280 | $1,500 | $297 |
| 623E40500 REFERENCE MONUMENT, TYPE A | 4 EACH | $1,500 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $1.00 |
| $1.00 |
| $1.00 |
| $1.00 |
| $1.00 |
| 4% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 100 CY | $300 | $150 | $280 | $220 | $319 | 3% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (131 CY | $200 | $300 | $290 | $265 | $218 | 3% |
| 441E70100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 119 CY | $220 | $350 | $330 | $320 | $262 | 3% |
| 659E00300 TOPSOIL | 776 CY | $20.00 | $40.02 | $30.00 | $38.00 | $13.61 | 2% |
| 602E20000 CONCRETE MASONRY | 8.1 CY | $1,500 | $3,876 | $2,600 | $2,400 | $1,503 | 1% |
| 203E10000 EXCAVATION | 531 CY | $20.00 | $20.13 | $10.00 | $28.50 | $16.38 | 1% |
| 204E10000 SUBGRADE COMPACTION | 2,888 SY | $3.50 | $1.50 | $4.50 | $2.00 | $2.70 | 1% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $10,000 | $16,816 | $16,000 | $40,000 | $20,171 | 1% |
| 253E02000 PAVEMENT REPAIR | 100 CY | $100 | $350 | $270 | $210 | $541 | 1% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $10,000 | $19,236 | $20,000 | $15,000 | $7,792 | 1% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $50,000 | $68,000 | $50,000 | $48,646 | 1% |
| 202E23000 PAVEMENT REMOVED | 1,804 SY | $5.00 | $9.56 | $3.50 | $10.00 | $4.16 | 1% |
| 659E10000 SEEDING AND MULCHING | 5,646 SY | $1.45 | $1.72 | $1.00 | $0.90 | $2.33 | 1% |
| 601E32004 ROCK CHANNEL PROTECTION, TYPE A WITH GEOTEXTILE FA | 51 CY | $160 | $243 | $140 | $128 | $181 | 1% |
| $829 |
| $1,100 |
| $850 |
| $879 |
| 659E20000 COMMERCIAL FERTILIZER | 0.76 TON | $1,400 | $750 | $640 | $1,250 | $750 |
| 659E31000 LIME | 1.17 ACRE | $450 | $75.00 | $920 | $150 | $75.00 |
| 659E35000 WATER | 30 MGAL | $1.00 | $3.00 | $110 | $1.00 | $3.00 |
| 670E00500 SLOPE EROSION PROTECTION | 1,343 SY | $2.00 | $2.25 | $2.00 | $2.50 | $2.25 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $3,500 | $2,855 | $3,300 | $2,500 | $2,855 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $2,500 | $2,910 | $6,100 | $9,550 | $2,140 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $7,500 | $10,469 | $13,000 | $12,500 | $10,436 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $7,500 | $8,497 | $500 | $16,000 | $68,222 |
| 503E21100 UNCLASSIFIED EXCAVATION | 15 CY | $100 | $104 | $100 | $300 | $29.12 |
| 605E31100 AGGREGATE DRAINS | 345 FT | $10.00 | $39.08 | $30.00 | $21.00 | $10.70 |
| 611E01400 6" CONDUIT, TYPE E | 50 FT | $50.00 | $49.39 | $9.00 | $25.00 | $14.48 |
| 611E01500 6" CONDUIT, TYPE F | 50 FT | $50.00 | $49.39 | $15.00 | $25.00 | $14.48 |
| 407E10000 TACK COAT | 536 GAL | $5.00 | $5.00 | $5.00 | $6.00 | $5.12 |
| 617E10100 COMPACTED AGGREGATE | 25 CY | $200 | $264 | $100 | $80.00 | $177 |
| 621E00100 RPM | 9 EACH | $372 | $323 | $370 | $270 | $323 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 9 EACH | $20.00 | $26.19 | $35.00 | $32.00 | $5.00 |
| 644E00104 EDGE LINE, 6" | 0.24 MILE | $16,292 | $14,167 | $16,000 | $9,700 | $14,167 |
| 644E00300 CENTER LINE | 0.12 MILE | $24,092 | $20,950 | $24,000 | $9,700 | $20,950 |
| 614E12420 DETOUR SIGNING | 1 LS | $6,550 | $6,550 | $7,500 | $6,550 | $7,842 |
| 616E10000 WATER | 31 MGAL | $1.00 | $100 | $110 | $1.00 | $15.77 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $7,500 | $5,791 | $10,000 | $15,000 | $8,371 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $7,500 | $5,061 | $25,000 | $15,000 | $10,190 |
| 623E50000 PRECONSTRUCTION SURVEY MONUMENT VERIFICATION AND R | 1 LS | $5,000 | $2,221 | $2,000 | $800 | $800 |
| 623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND | 1 LS | $5,000 | $2,221 | $2,000 | $800 | $800 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 203E20000 EMBANKMENT | 9,700 CY | $30 | $291k | 30% |
| 611E28000 84" CONDUIT, TYPE A (FOR PIPE ALLOWABLE MATERIALS, | 159 FT | $1,000 | $159k | 16% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 691 CY | $180 | $124k | 13% |
| 614E15000 SPECIAL - CALENDAR DAYS OF CONTRACT TIME FOR OPENI | 4,500 DLR | $10 | $45k | 5% |
| 304E20000 AGGREGATE BASE | 478 CY | $80 | $38k | 4% |
| 832E30000 EROSION CONTROL | 33,250 EACH | $1 | $33k | 3% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 100 CY | $300 | $30k | 3% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (131 CY | $200 | $26k | 3% |
| 441E70100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 119 CY | $220 | $26k | 3% |
| 659E00300 TOPSOIL | 776 CY | $20 | $16k | 2% |