LAK-E 305th St. Resurface
LAK County · est $2.8M
Bid dateThursday, December 4—
LAK County · est $2.8M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 46 more items below.
| Item | Quantity | R1Great Lakes Crushing LTD | R2C A Agresta Construction CO | R3Perk Company INC | R4Geauga Highway CO | R5Ronyak Paving INC | % of bid |
|---|---|---|---|---|---|---|---|
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (1705 CY | $225 | $200 | $202 | $225 | $225 | 17% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 1,220 CY | $250 | $220 | $221 | $245 | $270 | 14% |
| 452E10051 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS, | 1,621 SY | $135 | $120 | $130 | $110 | $123 | 10% |
| 690E12030 SPECIAL - PAVEMENT REINFORCING FABRIC WITH TACK CO | 34,648 SY | $6.00 | $5.55 | $5.55 | $6.25 | $5.55 | 9% |
| 255E16001 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 750 SY | $150 | $180 | $255 | $140 | $225 | 5% |
| Item | Quantity | R1Great Lakes Crushing LTD | R2C A Agresta Construction CO | R3Perk Company INC | R4Geauga Highway CO | R5Ronyak Paving INC |
|---|---|---|---|---|---|---|
| 202E23001 PAVEMENT REMOVED, AS PER PLAN | 1,624 SY | $20.00 | $15.00 | $21.00 | $22.50 | $25.00 |
| 202E30001 WALK REMOVED, AS PER PLAN | 6,643 SF | $3.00 | $3.00 | $2.50 | $2.35 | $8.00 |
| 202E32001 CURB REMOVED, AS PER PLAN | 3,582 FT | $5.00 | $18.00 | $2.50 | $14.00 | $12.00 |
| 203E10000 EXCAVATION | 501 CY | $35.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 750 SY |
| $150 |
| $165 |
| $165 |
| $130 |
| $200 |
| 5% |
| 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN | 3,172 FT | $35.00 | $65.00 | $76.00 | $40.00 | $85.00 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $54,440 | $33,500 | $25,000 | $175,000 | 5% |
| 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN | 80 EACH | $1,200 | $1,600 | $1,500 | $1,200 | $1,525 | 4% |
| 608E52001 CURB RAMP, AS PER PLAN | 4,648 SF | $18.00 | $26.00 | $38.75 | $22.50 | $40.00 | 4% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $60,000 | $30,000 | $27,370 | $25,000 | $21,499 | 3% |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 13 EACH | $4,500 | $1,550 | $1,550 | $1,550 | $1,550 | 3% |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 42 EACH | $1,200 | $1,000 | $1,500 | $1,200 | $1,000 | 2% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $50,000 | $162,000 | $60,825 | $518,325 | $179,100 | 2% |
| 304E20000 AGGREGATE BASE | 575 CY | $85.00 | $75.00 | $25.00 | $85.00 | $65.00 | 2% |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 40 EACH | $1,200 | $1,200 | $1,500 | $1,200 | $1,100 | 2% |
| 614E13001 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, AS PER P | 200 CY | $200 | $200 | $50.00 | $110 | $100 | 2% |
| 608E10001 4" CONCRETE WALK, AS PER PLAN | 2,696 SF | $14.00 | $12.00 | $17.00 | $7.00 | $14.00 | 2% |
| 254E01010 PAVEMENT PLANING, PORTLAND CEMENT CONCRETE, T=3" | 3,426 SY | $10.00 | $8.00 | $4.25 | $9.00 | $15.00 | 2% |
| 638E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN | 42 EACH | $800 | $800 | $1,100 | $850 | $1,000 | 2% |
| $35.00 |
| $1.00 |
| $60.00 |
| $45.00 |
| 204E10000 SUBGRADE COMPACTION | 1,783 SY | $2.00 | $2.00 | $2.00 | $2.50 | $2.00 |
| 659E00300 TOPSOIL | 200 CY | $40.00 | $50.00 | $70.00 | $65.00 | $85.00 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 1,810 SY | $5.00 | $10.00 | $8.50 | $4.50 | $10.00 |
| 659E35000 WATER | 10 MGAL | $100 | $20.00 | $100 | $1.00 | $10.00 |
| 832E30000 EROSION CONTROL | 25,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E98635 CATCH BASIN RECONSTRUCTED TO GRADE, AS PER PLAN | 5 EACH | $1,500 | $2,000 | $1,750 | $1,800 | $1,775 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 16,000 LB | $2.00 | $2.00 | $5.00 | $2.50 | $4.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, T=3" | 1,626 SY | $8.00 | $6.00 | $7.45 | $7.00 | $8.00 |
| 254E01600 PATCHING PLANED SURFACE | 70 SY | $50.00 | $30.00 | $1.00 | $1.00 | $30.00 |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 800 FT | $7.50 | $3.00 | $10.00 | $4.00 | $4.00 |
| 407E13900 TACK COAT, 702.13 | 2,096 GAL | $5.00 | $3.40 | $3.89 | $3.00 | $2.00 |
| 407E20000 NON-TRACKING TACK COAT | 3,134 GAL | $5.00 | $3.40 | $3.89 | $3.00 | $2.00 |
| 452E12051 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS, | 163 SY | $150 | $135 | $145 | $125 | $160 |
| 872E10000 VOID REDUCING ASPHALT MEMBRANE (VRAM) | 8,135 FT | $3.50 | $2.50 | $2.50 | $3.00 | $3.30 |
| 638E10901 SERVICE BOX ADJUSTED TO GRADE, AS PER PLAN | 5 EACH | $1,000 | $300 | $10.00 | $850 | $850 |
| 611E99661 MANHOLE RECONSTRUCTED TO GRADE, AS PER PLAN | 5 EACH | $1,500 | $1,500 | $1,750 | $1,800 | $1,875 |
| 644E00200 LANE LINE, 4" | 0.66 MILE | $3,500 | $3,500 | $3,500 | $3,500 | $2,750 |
| 644E00300 CENTER LINE | 2.33 MILE | $6,600 | $7,500 | $7,500 | $7,500 | $5,500 |
| 644E00400 CHANNELIZING LINE, 8" | 607 FT | $2.50 | $1.25 | $1.25 | $1.25 | $2.25 |
| 644E00500 STOP LINE | 576 FT | $9.00 | $10.00 | $10.00 | $10.00 | $7.50 |
| 644E00620 CROSSWALK LINE, 12" | 1,800 FT | $7.00 | $5.00 | $5.00 | $5.00 | $5.50 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 72 FT | $9.00 | $9.00 | $9.00 | $9.00 | $7.50 |
| 644E01100 SCHOOL SYMBOL MARKING, 72" | 2 EACH | $800 | $850 | $850 | $850 | $650 |
| 644E01300 LANE ARROW | 26 EACH | $125 | $105 | $105 | $105 | $100 |
| 644E01370 TWO WAY LEFT TURN ARROW | 18 EACH | $240 | $210 | $210 | $210 | $200 |
| 647E20026 CROSSWALK LINE, 12", TYPE A125 | 1,047 FT | $15.00 | $13.00 | $13.00 | $13.00 | $12.50 |
| 647E20076 CROSSWALK LINE, 24", TYPE A125 | 686 FT | $21.00 | $25.00 | $25.00 | $25.00 | $17.50 |
| 625E31600 PULL BOX, MISC.:PULL BOX REMOVED AND REPLACED TO G | 2 EACH | $500 | $1,100 | $1,100 | $1,100 | $1,800 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $125 | $90.00 | $115 | $95.00 | $125 |
| 614E12421 DETOUR SIGNING, AS PER PLAN | 1 LS | $30,000 | $31,450 | $22,300 | $31,450 | $25,000 |
| 614E12500 REPLACEMENT SIGN | 5 EACH | $200 | $200 | $200 | $200 | $150 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 12 SNMT | $1,100 | $900 | $950 | $900 | $900 |
| 614E20100 WORK ZONE LANE LINE, CLASS I, 4", 642 PAINT | 0.66 MILE | $800 | $900 | $900 | $900 | $650 |
| 614E20550 WORK ZONE LANE LINE, CLASS III, 4", 642 PAINT | 0.66 MILE | $800 | $900 | $900 | $900 | $650 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 2.33 MILE | $1,800 | $1,800 | $1,800 | $1,800 | $1,500 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 2.33 MILE | $1,800 | $1,500 | $1,500 | $1,500 | $1,500 |
| 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 642 PAIN | 607 FT | $1.00 | $1.00 | $0.95 | $0.95 | $0.75 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 607 FT | $1.00 | $1.00 | $0.95 | $0.95 | $0.75 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 576 FT | $6.00 | $5.00 | $5.00 | $5.00 | $4.50 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 576 FT | $6.00 | $5.00 | $5.00 | $5.00 | $4.50 |
| 619E16011 FIELD OFFICE, TYPE B, AS PER PLAN | 8 MNTH | $2,500 | $3,000 | $2,550 | $1,200 | $2,000 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $10,000 | $25,000 | $20,000 | $3,000 | $13,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (1705 CY | $225 | $384k | 14% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 1,220 CY | $250 | $305k | 11% |
| 452E10051 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS, | 1,621 SY | $135 | $219k | 8% |
| 690E12030 SPECIAL - PAVEMENT REINFORCING FABRIC WITH TACK CO | 34,648 SY | $6 | $208k | 8% |
| 255E16001 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 750 SY | $150 | $113k | 4% |
| 255E16001 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 750 SY | $150 | $113k | 4% |
| 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN | 3,172 FT | $35 | $111k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 4% |
| 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN | 80 EACH | $1,200 | $96k | 4% |
| 608E52001 CURB RAMP, AS PER PLAN | 4,648 SF | $18 | $84k | 3% |