MER-SR 219-13.80
MER County · est $1.5M
Bid dateThursday, December 4—
MER County · est $1.5M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 61 more items below.
| Item | Quantity | R1Brumbaugh Construction INC | R2Eagle Bridge CO | R3Complete General Construction Company | % of bid |
|---|---|---|---|---|---|
| 614E15000 SPECIAL - CALENDAR DAYS OF CONTRACT TIME FOR OPENI | 4,000 DLR | $90.00 | $90.00 | $80.00 | 27% |
| 515E12030 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 30 EACH | $11,000 | $8,900 | $11,500 | 25% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $115,000 | $200,000 | $375,000 | 9% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $110,000 | $200,000 | $175,000 | 8% |
| 517E70100 RAILING (THREE STEEL TUBE BRIDGE RAILING) | 194 FT | $500 | $430 | $455 | 7% |
| 511E31610 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 79 CY | $1,000 | $1,450 | $1,500 | 6% |
| 511E42510 CLASS QC1 CONCRETE, PIER CAP |
| Item | Quantity | R1Brumbaugh Construction INC | R2Eagle Bridge CO | R3Complete General Construction Company |
|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,000 | $1,500 | $6,000 |
| 202E23000 PAVEMENT REMOVED | 27 SY | $50.00 | $50.00 | $40.00 |
| 202E32500 CURB AND GUTTER REMOVED | 62 FT | $10.00 | $12.00 | $15.00 |
| 202E38000 GUARDRAIL REMOVED | 237.5 FT | $10.00 | $2.00 | $2.00 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 1 EACH | $600 | $150 | $350 |
| 202E42050 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 34 CY |
| $1,100 |
| $1,500 |
| $1,600 |
| 3% |
| 509E26000 GALVANIZED STEEL REINFORCEMENT | 14,508 LB | $1.80 | $2.00 | $2.50 | 2% |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 260 SF | $100 | $135 | $200 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $22,249 | $70,000 | $80,000 | 2% |
| 507E71200 SPECIAL - PILE ENCASEMENT | 111 FT | $200 | $165 | $375 | 2% |
| 516E43100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY ( | 120 EACH | $125 | $145 | $230 | 1% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 37 CY | $350 | $343 | $343 | 1% |
| 606E32160 BRIDGE TERMINAL ASSEMBLY, TYPE TST | 4 EACH | $2,800 | $2,350 | $2,425 | 1% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (37 CY | $300 | $290 | $290 | 1% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3" | 561 SY | $18.00 | $17.50 | $20.00 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $10,000 | $6,500 | $20,000 | 1% |
| 441E70100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 27 CY | $360 | $352 | $352 | 1% |
| 832E30000 EROSION CONTROL | 9,400 EACH | $1.00 | $1.00 | $1.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $9,000 | $20,000 | $14,000 | 1% |
| 3 EACH |
| $600 |
| $125 |
| $350 |
| 203E10000 EXCAVATION | 91 CY | $15.00 | $50.00 | $45.00 |
| 203E20000 EMBANKMENT | 43 CY | $15.00 | $50.00 | $50.00 |
| 204E10000 SUBGRADE COMPACTION | 195 SY | $1.25 | $15.00 | $5.00 |
| 606E15051 GUARDRAIL, TYPE MGS, AS PER PLAN | 106.25 FT | $45.00 | $29.00 | $64.00 |
| 606E26050 ANCHOR ASSEMBLY, MGS TYPE B | 1 EACH | $2,700 | $2,450 | $2,580 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 3 EACH | $2,900 | $2,675 | $2,880 |
| 607E35000 FENCE REMOVED AND REBUILT | 12 FT | $80.00 | $150 | $265 |
| 609E14000 CURB, TYPE 2-A | 153 FT | $50.00 | $35.00 | $65.00 |
| 659E00100 SOIL ANALYSIS TEST | 1 EACH | $150 | $100 | $50.00 |
| 659E00300 TOPSOIL | 111 CY | $60.00 | $50.00 | $45.00 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 1,342 SY | $2.50 | $5.00 | $3.85 |
| 659E14000 REPAIR SEEDING AND MULCHING | 67 SY | $2.00 | $2.00 | $10.00 |
| 659E15000 INTER-SEEDING | 67 SY | $2.00 | $2.00 | $5.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.12 TON | $900 | $1,500 | $900 |
| 659E35000 WATER | 7 MGAL | $5.00 | $10.00 | $2.50 |
| 659E40000 MOWING | 3 MSF | $400 | $50.00 | $100 |
| 611E00900 6" CONDUIT, TYPE B, 706.02 | 50 FT | $10.00 | $5.00 | $50.00 |
| 611E01100 6" CONDUIT, TYPE C, 706.02 | 100 FT | $10.00 | $4.00 | $50.00 |
| 611E01400 6" CONDUIT, TYPE E, 707.32 | 50 FT | $10.00 | $4.00 | $40.00 |
| 611E01500 6" CONDUIT, TYPE F, 707.33 | 50 FT | $10.00 | $4.00 | $45.00 |
| 611E01800 8" CONDUIT, TYPE B, 706.02 | 50 FT | $15.00 | $7.00 | $60.00 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 203 FT | $3.00 | $3.00 | $3.00 |
| 304E20000 AGGREGATE BASE | 56 CY | $65.00 | $120 | $126 |
| 407E20000 NON-TRACKING TACK COAT | 114 GAL | $5.00 | $5.50 | $5.50 |
| 626E00102 BARRIER REFLECTOR, TYPE 1, ONE-WAY | 13 EACH | $10.00 | $13.00 | $15.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 37.5 FT | $4.00 | $15.00 | $20.00 |
| 630E80100 SIGN, FLAT SHEET | 1 SF | $900 | $16.00 | $30.00 |
| 630E85101 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, AS | 2 EACH | $150 | $45.00 | $90.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $25.00 | $25.00 | $90.00 |
| 644E00104 EDGE LINE, 6" | 0.06 MILE | $15,000 | $60,835 | $60,835 |
| 644E00300 CENTER LINE | 0.06 MILE | $15,000 | $1,670 | $1,670 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 65 FT | $10.00 | $10.00 | $10.00 |
| 644E30030 REMOVAL OF PAVEMENT MARKING | 0.2 MILE | $1,800 | $12,500 | $12,500 |
| 645E00116 EDGE LINE, 6", TYPE A3 | 0.04 MILE | $35,000 | $168,750 | $168,750 |
| 645E00310 CENTER LINE, TYPE A3 | 0.04 MILE | $35,000 | $2,500 | $2,500 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 24 HOUR | $100 | $75.00 | $95.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $7,500 | $10,000 | $7,000 |
| 202E22900 APPROACH SLAB REMOVED | 133 SY | $50.00 | $50.00 | $55.00 |
| 202E38500 BRIDGE RAILING REMOVED | 182 FT | $10.00 | $15.00 | $15.00 |
| 503E21100 UNCLASSIFIED EXCAVATION | 93 CY | $60.00 | $150 | $150 |
| 507E00201 STEEL PILES HP12X53, FURNISHED, AS PER PLAN | 36 FT | $225 | $350 | $440 |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 4,116 LB | $1.20 | $1.80 | $1.87 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 20 EACH | $25.00 | $40.00 | $35.00 |
| 511E45710 CLASS QC1 CONCRETE, ABUTMENT (WINGWALLS ONLY) | 2 CY | $1,500 | $2,500 | $2,400 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 22 SF | $6.00 | $9.00 | $18.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL (3' WI | 90 FT | $50.00 | $40.00 | $55.00 |
| 516E31011 2" DEEP JOINT SEALER, AS PER PLAN | 80 FT | $8.00 | $20.00 | $28.50 |
| 516E41100 1/8" PREFORMED BEARING PAD, TYPE CDP | 60 EACH | $40.00 | $20.00 | $100 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 24 CY | $80.00 | $135 | $135 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 222 FT | $12.00 | $15.00 | $22.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 100 FT | $12.00 | $12.00 | $12.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 14 FT | $12.00 | $30.00 | $28.00 |
| 844E20001 GALVANIC ANODE PROTECTION, AS PER PLAN | 36 EACH | $55.00 | $55.00 | $50.00 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $1,500 | $2,500 | $15,000 |
| 619E16001 FIELD OFFICE, TYPE A, AS PER PLAN | 8 MNTH | $900 | $2,000 | $2,400 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 614E15000 SPECIAL - CALENDAR DAYS OF CONTRACT TIME FOR OPENI | 4,000 DLR | $90 | $360k | 25% |
| 515E12030 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 30 EACH | $11,000 | $330k | 23% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $115,000 | $115k | 8% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $110,000 | $110k | 8% |
| 517E70100 RAILING (THREE STEEL TUBE BRIDGE RAILING) | 194 FT | $500 | $97k | 7% |
| 511E31610 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 79 CY | $1,000 | $79k | 5% |
| 511E42510 CLASS QC1 CONCRETE, PIER CAP | 34 CY | $1,100 | $37k | 3% |
| 509E26000 GALVANIZED STEEL REINFORCEMENT | 14,508 LB | $1.8 | $26k | 2% |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 260 SF | $100 | $26k | 2% |
| 624E10000 MOBILIZATION | 1 LS | $22,249 | $22k | 2% |