WOO-IR 75/IR 475-24.85/00.00 Resurf (PART 1 AND PART 2)
WOO County · est $10M
Bid dateThursday, December 18—
WOO County · est $10M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 61 more items below.
| Item | Quantity | R1Gerken Paving INC | R2Kokosing Construction Company INC | R3Shelly Company | % of bid |
|---|---|---|---|---|---|
| 442E10001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 9,866 CY | $251 | $260 | $350 | 24% |
| 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 10,262 CY | $181 | $202 | $250 | 18% |
| 255E19000 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 2,240 SY | $650 | $650 | $650 | 14% |
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 5,328 CY | $223 | $245 | $300 | 11% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $1,045,000 | $830,000 | $1,400,000 | 10% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3.75" | 129,178 SY | $3.25 | $3.50 | $3.30 | 4% |
| 624E10000 MOBILIZATION |
| Item | Quantity | R1Gerken Paving INC | R2Kokosing Construction Company INC | R3Shelly Company |
|---|---|---|---|---|
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 9 EACH | $160 | $350 | $160 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 9 EACH | $3,525 | $2,650 | $3,525 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3.5" | 5,275 SY | $2.30 | $2.30 | $2.30 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 4.25" | 1,301 SY | $3.35 | $3.75 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1 LS |
| $340,000 |
| $560,000 |
| $1,500,000 |
| 3% |
| 253E02000 PAVEMENT REPAIR | 1,100 CY | $300 | $200 | $300 | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.75" | 195,159 SY | $1.60 | $1.80 | $1.60 | 3% |
| 872E10000 VOID REDUCING ASPHALT MEMBRANE (VRAM) | 88,971 FT | $2.60 | $2.15 | $3.09 | 2% |
| 617E10100 COMPACTED AGGREGATE | 2,326 CY | $83.00 | $40.00 | $110 | 2% |
| 842E10000 CORRECTING ELEVATION OF CONCRETE APPROACH SLABS WI | 18,200 LB | $6.00 | $6.00 | $6.00 | 1% |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 10,080 FT | $9.50 | $9.50 | $9.50 | 1% |
| 407E10000 TACK COAT | 35,695 GAL | $2.50 | $2.50 | $2.85 | 1% |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 81 MILE | $900 | $900 | $900 | 1% |
| 621E00100 RPM | 1,713 EACH | $37.50 | $37.50 | $37.50 | 1% |
| 442E22300 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP | 226 CY | $260 | $340 | $575 | 1% |
| 442E22100 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 193 CY | $300 | $400 | $575 | 1% |
| 209E60500 LINEAR GRADING | 25 MILE | $1,800 | $2,000 | $1,800 | 0% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $43,500 | $45,000 | $40,000 | 0% |
| $3.40 |
| 618E40100 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 126,044 FT | $0.22 | $0.22 | $0.22 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE1.5? | 1,181 SY | $1.60 | $3.50 | $3.40 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 1,713 EACH | $8.00 | $5.00 | $8.00 |
| 626E00116 BARRIER REFLECTOR, TYPE 5, 1WAY | 9 EACH | $15.00 | $15.00 | $20.00 |
| 630E80100 SIGN, FLAT SHEET | 69 SF | $24.00 | $24.00 | $24.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 2 EACH | $40.00 | $40.00 | $40.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $80.00 | $80.00 | $80.00 |
| 630E97900 SIGNING, MISC.: 6"x8" SOLID WOOD POST | 66 FT | $40.00 | $40.00 | $40.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 27 MILE | $750 | $750 | $750 |
| 642E00204 LANE LINE, 6", TYPE 1 | 13 MILE | $650 | $650 | $650 |
| 644E00404 CHANNELIZING LINE, 12" | 15,141 FT | $2.00 | $2.00 | $2.00 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 443 FT | $7.00 | $7.00 | $7.00 |
| 644E00720 CHEVRON MARKING | 1,954 FT | $7.00 | $7.00 | $7.00 |
| 644E01350 LANE REDUCTION ARROW | 5 EACH | $200 | $200 | $200 |
| 644E01510 DOTTED LINE, 6" | 8,330 FT | $1.00 | $1.00 | $1.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 250 HOUR | $110 | $120 | $100 |
| 614E12484 WORK ZONE INCREASED PENALTIES SIGN | 14 EACH | $200 | $200 | $200 |
| 614E12500 REPLACEMENT SIGN | 5 EACH | $192 | $192 | $192 |
| 614E12600 REPLACEMENT DRUM | 5 EACH | $45.00 | $75.00 | $45.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 38 SNMT | $900 | $751 | $925 |
| 614E20110 WORK ZONE LANE LINE, CLASS I, 6", 642 PAINT | 39 MILE | $650 | $650 | $650 |
| 614E23210 WORK ZONE CHANNELIZING LINE, CLASS I, 12", 642 PAI | 29,088 FT | $0.50 | $0.50 | $0.50 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 14,544 FT | $0.50 | $0.50 | $0.50 |
| 614E24202 WORK ZONE DOTTED LINE, CLASS I, 6", 642 PAINT | 11,458 FT | $0.50 | $0.50 | $0.50 |
| 614E24612 WORK ZONE DOTTED LINE, CLASS III, 6", 642 PAINT | 5,729 FT | $0.50 | $0.50 | $0.50 |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 40 SNMT | $700 | $740 | $820 |
| 202E23000 PAVEMENT REMOVED | 225 SY | $39.50 | $100 | $72.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 |
| 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN | 4 EACH | $1,600 | $1,000 | $2,500 |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, V | 4,637 SY | $6.75 | $6.75 | $6.75 |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 56 CY | $340 | $400 | $550 |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 19 CY | $290 | $175 | $180 |
| 407E10000 TACK COAT | 696 GAL | $2.50 | $2.50 | $2.85 |
| 646E10001 EDGE LINE, 4", AS PER PLAN | 0.3 MILE | $3,500 | $3,500 | $3,500 |
| 646E10101 LANE LINE, 4", AS PER PLAN | 0.6 MILE | $2,000 | $2,000 | $2,000 |
| 646E10201 CENTER LINE, AS PER PLAN | 0.3 MILE | $6,000 | $6,000 | $6,000 |
| 646E10301 CHANNELIZING LINE, 8", AS PER PLAN | 1,890 FT | $2.50 | $2.50 | $2.50 |
| 646E10601 TRANSVERSE/DIAGONAL LINE, AS PER PLAN | 148 FT | $12.00 | $12.00 | $12.00 |
| 646E10621 CHEVRON MARKING, AS PER PLAN | 185 FT | $12.00 | $12.00 | $12.00 |
| 530E00200 SPECIAL - STRUCTURES: SURFACE SMOOTHNESS | 1 LS | $9,850 | $10,000 | $27,900 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $110 | $120 | $100 |
| 614E12500 REPLACEMENT SIGN | 2 EACH | $192 | $192 | $192 |
| 614E12600 REPLACEMENT DRUM | 5 EACH | $45.00 | $75.00 | $45.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 6 SNMT | $900 | $1,872 | $1,600 |
| 614E20000 WORK ZONE LANE LINE, CLASS I, 4" | 0.6 MILE | $650 | $650 | $650 |
| 614E20550 WORK ZONE LANE LINE, CLASS III, 4", 642 PAINT | 0.6 MILE | $650 | $650 | $650 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 0.3 MILE | $1,500 | $1,500 | $1,500 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.3 MILE | $1,500 | $1,500 | $1,500 |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 0.3 MILE | $900 | $900 | $900 |
| 614E22350 WORK ZONE EDGE LINE, CLASS III, 4", 642 PAINT | 0.3 MILE | $900 | $900 | $900 |
| 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, 8" | 1,890 FT | $0.50 | $0.50 | $0.50 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 1,890 FT | $0.50 | $0.50 | $0.50 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 16 EACH | $8.00 | $5.00 | $8.00 |
| 108E30000 CPM PROGRESS SCHEDULE SHORT DURATION PROJECTS | 1 LS | $7,500 | $2,500 | $10,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $13,440 | $12,250 | $13,440 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $3,645 | $12,250 | $3,645 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E10001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 9,866 CY | $251 | $2.48M | 23% |
| 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 10,262 CY | $181 | $1.86M | 17% |
| 255E19000 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 2,240 SY | $650 | $1.46M | 13% |
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 5,328 CY | $223 | $1.19M | 11% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $1,045,000 | $1.04M | 10% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3.75" | 129,178 SY | $3.25 | $420k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $340,000 | $340k | 3% |
| 253E02000 PAVEMENT REPAIR | 1,100 CY | $300 | $330k | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.75" | 195,159 SY | $1.6 | $312k | 3% |
| 872E10000 VOID REDUCING ASPHALT MEMBRANE (VRAM) | 88,971 FT | $2.6 | $231k | 2% |