Figure 0.1 · BRIEFING BID #254007 · ODOT RESULT · awarded Feb 13 ERI-/HUR-SR 113/SR 13-20.18/04.13 ERI County · est $0.5M
Bid date Thursday, February 13 —
Project scope Bid form · ODOT
54 ITEMS Erosion & Landscaping 15% Guardrail & Barrier 13% Structures / Bridge 13% Earthwork 11% Drainage 9% Mobilization & General 9% Other Item Quantity R1 Great Lakes Demolition Company R2 Crawford Construction Company INC % of bid 624E10000 MOBILIZATION 1 LS $60,000 $36,500 14% 611E53400 58" X 91" CONDUIT, TYPE A, 706.04 88 FT $555 $1,400 12% 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) 163 CY $250 $300 10% 201E11000 CLEARING AND GRUBBING 1 LS $31,500 $4,700 8% 611E22200 54" CONDUIT, TYPE A, 706.02, 707.33, 707.02 (0.168 94 FT $325 $600 7% 442E22001 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 80 CY $335 $388 6% 203E20000 EMBANKMENT 708 CY $35.00 $27.00 6% 202E11001 STRUCTURE REMOVED, AS PER PLAN 1 LS $16,500 $15,000 4% 202E11001 STRUCTURE REMOVED, AS PER PLAN 1 LS $16,500 $17,200 4% 606E15050 GUARDRAIL, TYPE MGS 631.25 FT $22.00 $21.00 3% 602E20000 CONCRETE MASONRY 4 CY $3,200 $1,500 3% 614E11000 MAINTAINING TRAFFIC 1 LS $12,500 $5,500 3% 202E23000 PAVEMENT REMOVED 623 SY $20.00 $10.30 3% 304E20000 AGGREGATE BASE 185 CY $65.00 $134 3% 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER 81 CY $130 $140 3% 614E12420 DETOUR SIGNING 1 LS $10,500 $10,450 3% 659E00300 TOPSOIL 204 CY $50.00 $32.00 2% 202E20010 HEADWALL REMOVED 4 EACH $2,500 $620 2% 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING 1 LS $9,500 $8,300 2% 503E11100 COFFERDAMS AND EXCAVATION BRACING 1 LS $8,500 $8,000 2%
Show all 54 line items Item Quantity R1 Great Lakes Demolition Company R2 Crawford Construction Company INC 202E38000 GUARDRAIL REMOVED 462.5 FT $2.00 $13.00 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A 1 EACH $375 $375 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T 5 EACH $100 $500 203E10000 EXCAVATION 71 CY $20.00 $84.00 204E10000 SUBGRADE COMPACTION 690 SY $3.00 $2.20 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 3 EACH $2,650 $2,600 606E26550 ANCHOR ASSEMBLY, MGS TYPE T
Project details
Description ERI-/HUR-SR 113/SR 13-20.18/04.13
Type of work Drainage How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →