GEA-SR 528-10.71/14.87
GEA County · est $0.6M
Bid dateThursday, March 27—
GEA County · est $0.6M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 49 more items below.
| Item | Quantity | R1Northeast Ohio Trenching Service INC | R2Bog Construction INC | R3Shook Company LLC | R4Madex Construction CO | % of bid |
|---|---|---|---|---|---|---|
| 614E11300 SPECIAL - WORK ZONE TRAFFIC SIGNAL | 1 EACH | $55,000 | $45,000 | $44,000 | $57,895 | 12% |
| 611E19200 42" CONDUIT, TYPE A, 706.02, OR 48" TYPE A, 707.33 | 90 FT | $525 | $450 | $650 | $487 | 10% |
| 832E30000 EROSION CONTROL | 44,036 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 10% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 99 CY | $420 | $528 | $475 | $521 | 9% |
| 441E70101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), AS | 37 CY | $1,075 | $638 | $600 | $631 | 9% |
| 441E70801 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 449 (38 CY | $915 | $533 |
| Item | Quantity | R1Northeast Ohio Trenching Service INC | R2Bog Construction INC | R3Shook Company LLC | R4Madex Construction CO |
|---|---|---|---|---|---|
| 202E20010 HEADWALL REMOVED | 4 EACH | $500 | $500 | $1,500 | $916 |
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 4 FT | $35.00 | $300 | $50.00 | $100 |
| 202E35200 PIPE REMOVED, OVER 24" DIAMETER | 140 FT | $50.00 | $65.00 | $20.00 | $85.30 |
| 202E38000 GUARDRAIL REMOVED | 272 FT | $5.00 | $3.00 | $5.00 | $2.89 |
| 202E42206 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $465 |
| $521 |
| 8% |
| 611E19200 42" CONDUIT, TYPE A, 706.02, 707.33, 707.65 | 51 FT | $575 | $500 | $600 | $449 | 6% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 565 FT | $47.00 | $30.00 | $50.00 | $64.38 | 6% |
| 602E20000 CONCRETE MASONRY | 17 CY | $1,200 | $1,100 | $3,155 | $2,162 | 4% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 650 FT | $26.00 | $25.00 | $35.00 | $24.08 | 4% |
| 614E12421 DETOUR SIGNING, AS PER PLAN | 1 LS | $15,000 | $9,000 | $6,500 | $17,295 | 3% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 4 EACH | $2,975 | $3,000 | $3,000 | $3,068 | 3% |
| 202E23000 PAVEMENT REMOVED | 427 SY | $25.00 | $40.00 | $35.00 | $27.97 | 2% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 112 HOUR | $90.00 | $40.00 | $85.00 | $104 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $10,000 | $5,500 | $20,000 | $4,582 | 2% |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,500 | $2,500 | $2,500 | $2,895 | 2% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 8 SNMT | $1,250 | $1,300 | $1,000 | $1,048 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $10,000 | $25,000 | $35,000 | $19,958 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $9,000 | $25,000 | $20,000 | $28,526 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $9,000 | $30,000 | $20,000 | $77,297 | 2% |
| 2 EACH |
| $250 |
| $750 |
| $500 |
| $226 |
| 203E10000 EXCAVATION | 103 CY | $35.00 | $50.00 | $110 | $42.33 |
| 203E20000 EMBANKMENT | 26 CY | $55.00 | $150 | $100 | $57.77 |
| 203E35120 GRANULAR MATERIAL, TYPE C | 17 CY | $85.00 | $150 | $65.00 | $186 |
| 204E10000 SUBGRADE COMPACTION | 460 SY | $2.00 | $5.00 | $2.00 | $2.61 |
| 204E45000 PROOF ROLLING | 2 HOUR | $100 | $50.00 | $100 | $226 |
| 204E50000 GEOTEXTILE FABRIC | 98 SY | $10.00 | $10.00 | $5.00 | $7.44 |
| 209E15001 RESHAPING UNDER GUARDRAIL, AS PER PLAN | 10 STA | $75.00 | $100 | $250 | $57.89 |
| 606E15050 GUARDRAIL, TYPE MGS | 79 FT | $25.00 | $25.00 | $30.00 | $23.16 |
| 606E20050 ROUNDED END SECTION | 4 EACH | $100 | $125 | $50.00 | $98.42 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 4 EACH | $1,600 | $1,500 | $1,500 | $1,598 |
| 601E11000 RIPRAP, TYPE D | 8 SY | $135 | $200 | $300 | $1,605 |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 20 CY | $175 | $150 | $200 | $202 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $150 | $50.00 | $25.00 | $289 |
| 659E00300 TOPSOIL | 32 CY | $75.00 | $45.00 | $75.00 | $120 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 284 SY | $1.50 | $18.00 | $10.00 | $8.17 |
| 659E14000 REPAIR SEEDING AND MULCHING | 15 SY | $0.75 | $10.00 | $0.10 | $5.02 |
| 659E15000 INTER-SEEDING | 15 SY | $1.25 | $0.20 | $0.10 | $5.02 |
| 659E20000 COMMERCIAL FERTILIZER | 0.05 TON | $1,100 | $1,000 | $100 | $4,516 |
| 659E31000 LIME | 0.06 ACRE | $1,500 | $100 | $100 | $2,509 |
| 659E35000 WATER | 2 MGAL | $50.00 | $1.00 | $0.10 | $37.63 |
| 611E01100 6" CONDUIT, TYPE C | 4 FT | $15.00 | $150 | $80.00 | $115 |
| 304E20000 AGGREGATE BASE | 78 CY | $92.00 | $220 | $256 | $175 |
| 407E20000 NON-TRACKING TACK COAT | 75 GAL | $35.00 | $17.00 | $15.00 | $17.37 |
| 621E00100 RPM | 15 EACH | $280 | $350 | $300 | $289 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 15 EACH | $25.00 | $50.00 | $50.00 | $57.89 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 15 EACH | $15.00 | $15.00 | $10.00 | $17.37 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.34 MILE | $4,000 | $4,200 | $3,200 | $3,688 |
| 642E00300 CENTER LINE, TYPE 1 | 0.18 MILE | $5,000 | $500 | $5,500 | $6,339 |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $5,000 | $35,000 | $40,000 | $68,845 |
| 614E11630 INCREASED BARRIER DELINEATION | 565 FT | $8.00 | $8.00 | $1.80 | $2.08 |
| 614E12740 WORK ZONE LIGHTING SYSTEM | 1 EACH | $7,500 | $5,000 | $2,000 | $17,368 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL) | 12 EACH | $11.50 | $15.00 | $30.00 | $34.74 |
| 614E13360 OBJECT MARKER, TWO WAY | 12 EACH | $25.00 | $25.00 | $35.00 | $40.53 |
| 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I | 0.2 MILE | $18,000 | $20,000 | $15,600 | $18,063 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 0.35 MILE | $3,750 | $7,000 | $7,000 | $8,105 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 24 FT | $10.00 | $30.00 | $7.50 | $9.26 |
| 614E40051 BUSINESS ENTRANCE SIGN, AS PER PLAN | 2 EACH | $300 | $400 | $200 | $214 |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $5,000 | $10,000 | $5,000 | $7,563 |
| 616E10000 WATER | 1 MGAL | $5.00 | $1.00 | $1.00 | $75.26 |
| 642E30000 REMOVAL OF PAVEMENT MARKING | 1,331 FT | $5.00 | $3.00 | $5.00 | $5.33 |
| 619E16010 FIELD OFFICE, TYPE B | 5 MNTH | $500 | $1,500 | $1,750 | $750 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,500 | $15,000 | $5,000 | $22,158 |
| 623E50000 PRECONSTRUCTION SURVEY MONUMENT VERIFICATION AND R | 1 LS | $1,000 | $5,500 | $1,000 | $7,242 |
| 623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND | 1 LS | $500 | $6,500 | $1,000 | $5,372 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 614E11300 SPECIAL - WORK ZONE TRAFFIC SIGNAL | 1 EACH | $55,000 | $55k | 10% |
| 611E19200 42" CONDUIT, TYPE A, 706.02, OR 48" TYPE A, 707.33 | 90 FT | $525 | $47k | 8% |
| 832E30000 EROSION CONTROL | 44,036 EACH | $1 | $44k | 8% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 99 CY | $420 | $42k | 7% |
| 441E70101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), AS | 37 CY | $1,075 | $40k | 7% |
| 441E70801 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 449 (38 CY | $915 | $35k | 6% |
| 611E19200 42" CONDUIT, TYPE A, 706.02, 707.33, 707.65 | 51 FT | $575 | $29k | 5% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 565 FT | $47 | $27k | 5% |
| 602E20000 CONCRETE MASONRY | 17 CY | $1,200 | $20k | 4% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 650 FT | $26 | $17k | 3% |