WAY-US 250-27.50
WAY County · est $0.2M
Bid dateThursday, May 22—
WAY County · est $0.2M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 13 more items below.
| Item | Quantity | R1Crawford Construction Company INC | R2Craig Edward Susany INC | R3Madex Construction CO | % of bid |
|---|---|---|---|---|---|
| 611E96600 CONDUIT, BORED OR JACKED, 30", 748.06 (0.500) | 104 FT | $955 | $1,100 | $2,101 | 49% |
| 624E10000 MOBILIZATION | 1 LS | $19,500 | $10,000 | $19,382 | 10% |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT, 24" | 77 FT | $230 | $190 | $246 | 9% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $8,700 | $25,000 | $12,190 | 4% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $7,000 | $50,000 | $6,739 | 3% |
| 602E20000 CONCRETE MASONRY | 1.2 CY | $5,400 | $5,000 | $5,370 | 3% |
| 203E20000 EMBANKMENT | 44 CY | $100 | $100 |
| Item | Quantity | R1Crawford Construction Company INC | R2Craig Edward Susany INC | R3Madex Construction CO |
|---|---|---|---|---|
| 202E75000 FENCE REMOVED | 109 FT | $11.00 | $10.00 | $17.37 |
| 202E98100 REMOVAL MISC.: FENCE POST | 1 EACH | $120 | $100 | $579 |
| 203E10000 EXCAVATION | 8 CY | $185 | $100 | $57.89 |
| 623E50000 PRECONSTRUCTION SURVEY MONUMENT VERIFICATION AND R | 1 LS | $851 | $7,500 | $2,895 |
| 623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND | 1 LS | $851 | $2,500 | $2,895 |
| 601E32100 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $90.15 |
| 2% |
| 670E00530 SLOPE EROSION PROTECTION MAT, TYPE C | 154 SY | $26.00 | $10.00 | $9.26 | 2% |
| 601E11000 RIPRAP, TYPE D | 4 SY | $980 | $500 | $953 | 2% |
| 623E38500 MONUMENT ASSEMBLY, TYPE C | 2 EACH | $1,800 | $2,000 | $2,227 | 2% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 2 SNMT | $1,800 | $1,000 | $1,621 | 2% |
| 202E38201 GUARDRAIL REMOVED FOR REUSE, AS PER PLAN | 100 FT | $33.00 | $200 | $60.04 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,025 | $11,000 | $11,989 | 1% |
| 202E20010 HEADWALL REMOVED | 2 EACH | $1,500 | $1,000 | $1,891 | 1% |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,000 | $7,000 | $3,195 | 1% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,300 | $100 | $2,781 | 1% |
| 659E10000 SEEDING AND MULCHING | 182 SY | $12.40 | $9.00 | $17.37 | 1% |
| 659E00300 TOPSOIL | 20 CY | $111 | $100 | $92.63 | 1% |
| 202E35200 PIPE REMOVED, OVER 24" DIAMETER | 16 FT | $112 | $200 | $395 | 1% |
| 4 CY |
| $430 |
| $400 |
| $291 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $175 | $25.00 | $289 |
| 659E14000 REPAIR SEEDING AND MULCHING | 9 SY | $1.00 | $9.00 | $17.37 |
| 659E15000 INTER-SEEDING | 9 SY | $1.00 | $6.00 | $17.37 |
| 659E20000 COMMERCIAL FERTILIZER | 0.02 TON | $1,200 | $1,000 | $5,790 |
| 659E31000 LIME | 0.04 ACRE | $440 | $600 | $1,158 |
| 659E35000 WATER | 0.98 MGAL | $12.00 | $1.00 | $75.26 |
| 304E20000 AGGREGATE BASE | 2 CY | $840 | $200 | $336 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E96600 CONDUIT, BORED OR JACKED, 30", 748.06 (0.500) | 104 FT | $955 | $99k | 47% |
| 624E10000 MOBILIZATION | 1 LS | $19,500 | $20k | 9% |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT, 24" | 77 FT | $230 | $18k | 8% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $8,700 | $9k | 4% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $7,000 | $7k | 3% |
| 602E20000 CONCRETE MASONRY | 1.2 CY | $5,400 | $6k | 3% |
| 203E20000 EMBANKMENT | 44 CY | $100 | $4k | 2% |
| 670E00530 SLOPE EROSION PROTECTION MAT, TYPE C | 154 SY | $26 | $4k | 2% |
| 601E11000 RIPRAP, TYPE D | 4 SY | $980 | $4k | 2% |
| 623E38500 MONUMENT ASSEMBLY, TYPE C | 2 EACH | $1,800 | $4k | 2% |