LAK-SR 84/VAR-18.21/VAR
LAK County · est $1.7M
Bid dateThursday, January 29—
Awarded toGEAUGA HIGHWAY CO$1.13M
LAK County · est $1.7M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E70101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), AS | 1,058 CY | $222 | $235k | 21% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (1058 CY | $175 | $185k | 16% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3" | 26,213 SY | $5 | $131k | 12% |
| 255E19001 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 900 SY | $120 | $108k | 10% |
| 608E52000 CURB RAMP | 4,064 SF | $17 | $69k | 6% |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 49 EACH | $1,150 | $56k | 5% |
| 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN | 40 EACH | $1,150 | $46k | 4% |
| 606E15050 GUARDRAIL, TYPE MGS | 1,318 FT | $22 | $29k | 3% |
| 611E99820 SPECIAL - MISCELLANEOUS METAL Section 3 - DRAINAGE - Totals Awd $139,925.00 2 $108,659.55 3 $165,800.00 4 $145,425.00 5 $163,800.00 6 $158,300.00 7 $118,700.00 | 9,500 LB | $2.25 | $21k | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $20,100 | $20k | 2% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 28 more items below.
| Item | Quantity | R1Geauga Highway CO | R2Kokosing Construction Company INC | R3Karvo Companies INC | R4Ronyak Paving INC | R5Phillips Paving LLC | R6Shelly Company | R7Barbicas Construction Company INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 441E70101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), AS | 1,058 CY | $222 | $241 | $230 | $225 | $240 | $240 | $300 | 23% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (1058 CY | $175 | $203 | $220 | $195 | $200 | $205 | $290 | 18% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3" | 26,213 SY | $5.00 | $3.25 | $5.00 | $5.00 | $5.00 | $4.25 | $4.50 | 13% |
| 255E19001 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 900 SY | $120 | $191 | $185 | $350 | $330 | $400 | $220 | 10% |
| 608E52000 CURB RAMP | 4,064 SF | $17.00 | $11.35 | $14.00 | $12.00 | $20.00 | $28.00 | $25.00 | 7% |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 49 EACH | $1,150 | $690 | $1,200 | $825 | $1,100 | $1,200 | $700 | 5% |
| 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN | 40 EACH | $1,150 | $900 | $1,400 | $1,000 | $1,450 | $1,200 | $800 | 4% |
| 606E15050 GUARDRAIL, TYPE MGS | 1,318 FT | $22.00 | $21.00 | $21.00 | $22.00 | $22.00 | $21.00 | $22.00 | 3% |
| 611E99820 SPECIAL - MISCELLANEOUS METAL Section 3 - DRAINAGE - Totals Awd $139,925.00 2 $108,659.55 3 $165,800.00 4 $145,425.00 5 $163,800.00 6 $158,300.00 7 $118,700.00 | 9,500 LB | $2.25 | $2.25 | $3.00 | $5.00 | $3.00 | $4.00 | $4.00 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $20,100 | $106,200 | $110,000 | $170,000 | $175,000 | $182,500 | $200,000 | 2% |
| 609E26000 CURB, TYPE 6 | 702 FT | $26.00 | $27.45 | $45.00 | $30.00 | $50.00 | $60.00 | $45.00 | 2% |
| 632E26501 DETECTOR LOOP, AS PER PLAN Section 7 - TRAFFIC SIGNALS - Totals Awd $16,000.00 2 $14,500.00 3 $14,500.00 4 $14,500.00 5 $14,500.00 6 $14,500.00 7 $14,000.00 | 10 EACH | $1,600 | $1,450 | $1,450 | $1,450 | $1,450 | $1,450 | $1,400 | 2% |
| 623E39501 MONUMENT ASSEMBLY ADJUSTED TO GRADE, AS PER PLAN | 21 EACH | $750 | $500 | $1,300 | $925 | $950 | $1,100 | $600 | 2% |
| 638E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN Section 5 - WATER WORK - Totals Awd $15,600.00 2 $11,998.80 3 $24,000.00 4 $13,200.00 5 $22,800.00 6 $15,480.00 7 $7,200.00 | 24 EACH | $650 | $500 | $1,000 | $550 | $950 | $645 | $300 | 2% |
| 407E20000 NON-TRACKING TACK COAT | 4,202 GAL | $3.50 | $2.25 | $2.53 | $2.00 | $2.00 | $3.00 | $3.10 | 1% |
| 832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $23,000.00 2 $24,537.50 3 $16,550.00 4 $21,200.00 5 $25,700.00 6 $22,700.00 7 $22,100.00 | 14,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 202E30000 WALK REMOVED | 4,125 SF | $3.00 | $1.65 | $6.00 | $2.00 | $7.00 | $10.00 | $3.00 | 1% |
| 611E99661 MANHOLE RECONSTRUCTED TO GRADE, AS PER PLAN | 5 EACH | $1,800 | $1,395 | $2,500 | $1,400 | $2,600 | $1,500 | $1,600 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $8,760 | $5,100 | $16,000 | $11,925 | $35,000 | $10,000 | $20,000 | 1% |
| 646E10510 CROSSWALK LINE, 12" | 1,394 FT | $6.20 | $6.40 | $6.50 | $6.40 | $6.40 | $9.50 | $9.50 | 1% |
| Item | Quantity | R1Geauga Highway CO | R2Kokosing Construction Company INC | R3Karvo Companies INC | R4Ronyak Paving INC | R5Phillips Paving LLC | R6Shelly Company | R7Barbicas Construction Company INC |
|---|---|---|---|---|---|---|---|---|
| 202E32000 CURB REMOVED | 702 FT | $10.00 | $13.75 | $25.00 | $14.00 | $12.00 | $12.00 | $7.00 |
| 202E38000 GUARDRAIL REMOVED | 1,530 FT | $2.30 | $3.00 | $3.00 | $2.30 | $2.30 | $3.00 | $2.30 |
| 202E42206 ANCHOR ASSEMBLY REMOVED | 2 EACH | $125 | $250 | $250 | $125 | $125 | $250 | $125 |
| 202E42207 ANCHOR ASSEMBLY REMOVED, AS PER PLAN | 4 EACH | $325 | $450 | $450 | $325 | $325 | $450 | $325 |
| 606E26100 ANCHOR ASSEMBLY, TYPE E | 3 EACH | $2,120 | $2,550 | $2,550 | $2,120 | $2,120 | $2,550 | $2,120 |
| 606E26500 ANCHOR ASSEMBLY, TYPE T | 3 EACH | $950 | $1,450 | $1,450 | $950 | $950 | $1,450 | $950 |
| 623E39601 MONUMENT ASSEMBLY RECONSTRUCTED TO GRADE, AS PER P Section 1 - ROADWAY - Totals Awd $148,508.00 2 $121,117.05 3 $175,064.00 4 $131,646.00 5 $183,804.00 6 $234,334.00 7 $175,964.00 | 1 EACH | $1,000 | $1,465 | $2,000 | $2,100 | $2,000 | $1,200 | $1,200 |
| 659E00300 TOPSOIL | 60 CY | $80.00 | $145 | $25.00 | $85.00 | $125 | $75.00 | $100 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 1,050 SY | $4.00 | $1.75 | $1.00 | $2.00 | $4.00 | $4.00 | $2.00 |
| 611E98635 CATCH BASIN RECONSTRUCTED TO GRADE, AS PER PLAN | 4 EACH | $1,800 | $2,625 | $2,500 | $2,625 | $2,600 | $1,500 | $1,600 |
| 254E01600 PATCHING PLANED SURFACE | 500 SY | $0.25 | $3.00 | $0.50 | $15.00 | $10.00 | $1.00 | $7.00 |
| 875E10000 LONGITUDINAL JOINT ADHESIVE Section 4 - PAVEMENT - Totals Awd $695,035.20 2 $757,914.65 3 $817,396.06 4 $932,429.00 5 $945,869.00 6 $1,004,371.25 7 $995,854.70 | 1,260 LB | $2.27 | $0.85 | $1.00 | $4.00 | $3.00 | $5.50 | $6.00 |
| 646E10000 EDGE LINE, 4" | 0.86 MILE | $1,860 | $1,860 | $1,860 | $1,860 | $1,860 | $4,250 | $4,250 |
| 646E10200 CENTER LINE | 1.48 MILE | $4,245 | $4,245 | $4,245 | $4,245 | $4,245 | $5,000 | $5,000 |
| 646E10400 STOP LINE | 241 FT | $11.40 | $11.40 | $12.00 | $11.40 | $11.40 | $12.50 | $12.50 |
| 646E20000 RAILROAD SYMBOL MARKING Section 6 - TRAFFIC CONTROL - Totals Awd $19,772.40 2 $20,051.20 3 $20,335.20 4 $20,051.20 5 $20,051.20 6 $27,960.50 7 $27,960.50 | 1 EACH | $500 | $500 | $500 | $500 | $500 | $650 | $650 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $100 | $130 | $125 | $125 | $125 | $120 | $200 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 4.44 MILE | $1,180 | $1,180 | $1,180 | $1,180 | $1,180 | $1,450 | $1,450 |
| 614E22100 WORK ZONE EDGE LINE, CLASS I, 4", 642 PAINT | 2.58 MILE | $725 | $725 | $725 | $725 | $725 | $675 | $675 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 723 FT | $2.50 | $2.50 | $2.50 | $2.50 | $2.50 | $4.00 | $4.00 |
| 614E27050 WORK ZONE CROSSWALK LINE, CLASS I, 12", 642 PAINT | 4,182 FT | $1.75 | $1.75 | $1.75 | $1.75 | $1.75 | $3.00 | $3.00 |
| 614E32200 WORK ZONE RAILROAD SYMBOL MARKING, CLASS I, 642 PA | 3 EACH | $350 | $350 | $350 | $350 | $350 | $250 | $250 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN Section 8 - MAINTENANCE OF TRAFFIC - Totals Awd $26,535.70 2 $27,735.70 3 $27,535.70 4 $30,085.70 5 $30,085.70 6 $34,417.50 7 $38,367.50 | 6 SNMT | $875 | $875 | $875 | $1,300 | $1,300 | $875 | $1,000 |
| 108E30000 CPM PROGRESS SCHEDULE SHORT DURATION PROJECTS | 1 LS | $2,500 | $1,500 | $5,000 | $2,500 | $5,000 | $10,000 | $200 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,000 | $870 | $4,000 | $2,290 | $5,000 | $5,000 | $200 |
| 623E50000 PRECONSTRUCTION SURVEY MONUMENT VERIFICATION AND R | 1 LS | $1,500 | $3,000 | $2,500 | $2,790 | $2,800 | $3,000 | $500 |
| 623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND | 1 LS | $1,500 | $3,000 | $2,500 | $2,790 | $2,800 | $3,000 | $500 |
| 624E10000 MOBILIZATION Section 9 - INCIDENTALS - Totals Awd $41,859.92 2 $182,720.00 3 $264,000.00 4 $263,295.10 5 $330,050.00 6 $253,500.00 7 $371,400.00 | 1 LS | $6,500 | $63,050 | $124,000 | $71,000 | $104,450 | $40,000 | $150,000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →