Skip to content
Figure 0.1 · BRIEFING
BID #260187 · ODOTRESULT · awarded Apr 9

WYA-Carey SRTS Phase 2

WYA County · est $0.3M

Bid dateThursday, April 9
Awarded toSMITH PAVING & EXCAVATING INC$262,073.6
read → connected → answeredcassandri

Project scope

Bid form · ODOT

50ITEMS
  • Drainage16%
  • Curb, Walk & Ramp14%
  • Erosion & Landscaping12%
  • Earthwork10%
  • Mobilization & General8%
  • Removal & Demolition6%
  • Other34%

Top items by winning bid

ItemQtyUnit priceExtended%
608E10001 4" CONCRETE WALK, AS PER PLAN9,758 SF$7$68k26%
452E10011 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P,313 SY$79$25k9%
611E00100 4" CONDUIT, TYPE B615 FT$40$25k9%
624E10000 MOBILIZATION Section 8 - INCIDENTALS - Totals Awd $29,100.00 2 $33,500.00 3 $26,800.00 4 $33,040.00 5 $29,800.00 6 $77,214.161 LS$18,500$19k7%
411E10000 STABILIZED CRUSHED AGGREGATE126 CY$95$12k5%
659E00300 TOPSOIL163 CY$70$11k4%
203E10000 EXCAVATION124 CY$75$9k4%
202E23000 PAVEMENT REMOVED411 SY$20$8k3%
832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $24,641.60 2 $30,044.40 3 $23,920.10 4 $26,839.40 5 $25,979.98 6 $35,383.358,000 EACH$1$8k3%
608E52001 CURB RAMP, AS PER PLAN929 SF$7$7k2%

Per-bidder unit pricing

ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 30 more items below.

Rank 1Smith Paving & Excavating INC$262kRank 2R M H Concrete & Foundations INC$270kRank 3D L Smith Concrete LLC$291kRank 4Fenson Contracting LLC$345kRank 5Crawford Construction Company INC$366kRank 6Madex Construction CO$580k
ItemQuantityR1Smith Paving & Excavating INCR2R M H Concrete & Foundations INCR3D L Smith Concrete LLCR4Fenson Contracting LLCR5Crawford Construction Company INCR6Madex Construction CO
608E10001 4" CONCRETE WALK, AS PER PLAN9,758 SF$7.00$6.50$9.50$7.75$10.70$12.55
452E10011 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P,313 SY$79.00$80.00$95.00$125$144$156
611E00100 4" CONDUIT, TYPE B615 FT$40.00$27.50$20.00$26.00$34.00$68.73
624E10000 MOBILIZATION Section 8 - INCIDENTALS - Totals Awd $29,100.00 2 $33,500.00 3 $26,800.00 4 $33,040.00 5 $29,800.00 6 $77,214.161 LS$18,500$6,500$12,500$10,000$18,400$38,656
411E10000 STABILIZED CRUSHED AGGREGATE126 CY$95.00$75.00$65.00$98.00$153$240
659E00300 TOPSOIL163 CY$70.00$81.00$60.00$78.00$62.00$75.26
203E10000 EXCAVATION124 CY$75.00$70.00$40.00$88.00$93.00$83.02
202E23000 PAVEMENT REMOVED411 SY$20.00$13.50$18.00$32.00$14.50$44.75
832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $24,641.60 2 $30,044.40 3 $23,920.10 4 $26,839.40 5 $25,979.98 6 $35,383.358,000 EACH$1.00$1.00$1.00$1.00$1.00$1.00
608E52001 CURB RAMP, AS PER PLAN929 SF$7.00$16.80$18.00$34.00$27.00$45.16
201E11000 CLEARING AND GRUBBING1 LS$5,800$2,500$2,500$4,500$2,200$3,119
614E11000 MAINTAINING TRAFFIC Section 7 - MAINTENANCE OF TRAFFIC - Totals Awd $5,000.00 2 $4,000.00 3 $3,500.00 4 $25,000.00 5 $4,100.00 6 $10,112.671 LS$5,000$4,000$3,500$25,000$4,100$10,113
623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P1 LS$5,000$17,500$6,000$10,500$4,700$11,579
611E98470 CATCH BASIN, NO. 2-2B1 EACH$4,800$3,500$8,500$2,900$3,600$2,953
609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN94 FT$47.00$45.00$52.00$75.00$90.00$122
659E00500 SEEDING AND MULCHING, CLASS 11,464 SY$2.65$3.95$3.00$4.00$5.00$9.26
441E70700 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2449 (5 CY$650$750$1,200$600$1,000$5,789
103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM1 LS$3,000$3,500$5,500$7,500$3,900$12,505
644E00630 CROSSWALK LINE, 24" Section 6 - TRAFFIC CONTROL - Totals Awd $4,934.00 2 $7,606.00 3 $5,734.00 4 $5,835.00 5 $6,726.20 6 $12,158.45260 FT$11.00$13.00$12.00$12.75$14.00$20.84
609E26001 CURB, TYPE 6, AS PER PLAN77 FT$37.00$35.00$20.00$62.00$100$98.42
Show all 50 line items
ItemQuantityR1Smith Paving & Excavating INCR2R M H Concrete & Foundations INCR3D L Smith Concrete LLCR4Fenson Contracting LLCR5Crawford Construction Company INCR6Madex Construction CO
202E30000 WALK REMOVED37 SF$10.00$2.50$2.00$9.50$10.00$23.01
203E20000 EMBANKMENT8 CY$65.00$78.00$60.00$18.00$140$70.53
690E50350 SPECIAL - MAILBOX REMOVED AND RESET Section 1 - ROADWAY - Totals Awd $99,619.00 2 $97,979.20 3 $125,815.00 4 $137,230.00 5 $152,635.10 6 $198,795.464 EACH$150$375$245$240$490$289
654E11000 COMMERCIAL FERTILIZER0.2 TON$1,500$1,355$1,000$750$708$2,316
659E14000 REPAIR SEEDING AND MULCHING74 SY$5.00$8.90$10.00$1.00$1.00$5.79
659E15000 INTER-SEEDING74 SY$5.00$8.50$10.00$0.50$1.00$1.16
659E31000 LIME0.3 ACRE$500$2,300$200$1.00$780$1,158
659E35000 WATER8.1 MGAL$20.00$100$1.00$1.00$3.75$28.95
202E32000 CURB REMOVED87 FT$15.00$8.50$10.00$15.00$51.00$33.67
202E32500 CURB AND GUTTER REMOVED84 FT$15.00$9.00$10.00$15.00$80.00$40.32
202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER49 FT$35.00$15.00$20.00$13.00$16.00$42.62
611E00101 4" CONDUIT, TYPE B, AS PER PLAN, STORM REPAIR50 FT$30.00$29.00$30.00$17.00$25.00$57.89
611E00901 6" CONDUIT, TYPE B, AS PER PLAN, STORM REPAIR50 FT$35.00$30.00$60.00$19.00$25.00$86.84
611E01801 8" CONDUIT, TYPE B, AS PER PLAN, STORM REPAIR50 FT$40.00$37.00$65.00$23.00$25.00$116
611E03100 10" CONDUIT, TYPE B10 FT$80.00$70.00$100$110$150$232
611E99900 DRAINAGE STRUCTURE, MISC.:STORM CLEANOUT Section 3 - DRAINAGE - Totals Awd $48,797.00 2 $43,468.00 3 $47,668.00 4 $40,456.00 5 $59,061.00 6 $91,448.496 EACH$300$1,400$1,500$415$200$579
304E20000 AGGREGATE BASE23 CY$95.00$89.00$110$235$226$255
407E20000 NON-TRACKING TACK COAT, APPLIED AT 0.06 GAL./S.Y.7 GAL$50.00$8.00$8.00$5.00$15.00$70.53
441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG2 CY$700$1,050$1,450$800$1,000$5,789
441E70500 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449)$700$1,050$1,450$800$1,000$6,368
613E41200 LOW STRENGTH MORTAR BACKFILL Section 4 - PAVEMENT - Totals Awd $47,232.00 2 $47,218.00 3 $54,886.00 4 $66,238.00 5 $81,653.00 6 $146,596.735 CY$250$325$225$465$400$289
638E10800 VALVE BOX ADJUSTED TO GRADE3 EACH$250$400$145$360$375$753
638E11100 METER AND CHAMBER REMOVED AND RESET Section 5 - WATER WORK - Totals Awd $2,750.00 2 $5,950.00 3 $2,560.00 4 $10,080.00 5 $6,125.00 6 $8,047.345 EACH$400$950$425$1,800$1,000$1,158
630E08600 SIGN POST REFLECTOR3 EACH$50.00$79.00$85.00$60.00$60.00$174
630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION11 EACH$75.00$115$85.00$90.00$87.00$174
630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT6 EACH$11.00$215$15.00$14.00$13.00$261
644E00500 STOP LINE33 FT$11.00$13.00$12.00$14.00$23.00$17.37
644E00620 CROSSWALK LINE, 12"134 FT$5.00$7.50$7.00$6.00$8.30$16.21
623E50000 PRECONSTRUCTION SURVEY MONUMENT VERIFICATION AND R1 LS$1,300$3,000$1,000$2,520$1,400$8,684
623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND1 LS$1,300$3,000$1,800$2,520$1,400$5,789

Project details

Description
WYA-Carey SRTS Phase 2
Type of work
Safety

How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →