GRE-US 35-06.24
GRE County · est $0.1M
Bid dateThursday, January 11—
GRE County · est $0.1M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 33 more items below.
| Item | Quantity | R1R B Jergens Contractors INC | R2Eagle Bridge CO | R3Brumbaugh Construction INC | R4Eclipse CO LLC | R5John R Jurgensen Company | R6Barrett Paving Materials INC | R7Belgray, INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $18,000 | $29,000 | $19,674 | $25,000 | $19,820 | $20,500 | $43,000 | 17% |
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 32 CY | $396 | $293 | $325 | $308 | $318 | $500 | $575 | 12% |
| 302E46000 |
| Item | Quantity | R1R B Jergens Contractors INC | R2Eagle Bridge CO | R3Brumbaugh Construction INC | R4Eclipse CO LLC | R5John R Jurgensen Company | R6Barrett Paving Materials INC | R7Belgray, INC |
|---|---|---|---|---|---|---|---|---|
| 202E38000 GUARDRAIL REMOVED | 135 FT | $6.60 | $6.00 | $7.00 | $2.00 | $6.00 | $30.00 | $10.00 |
| 202E98100 REMOVAL MISC.:WOOD POST | 16 EACH | $22.00 | $20.00 | $21.00 | $25.00 | $20.00 | $20.00 | $20.00 |
| 203E20000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 45 CY |
| $277 |
| $204 |
| $227 |
| $215 |
| $266 |
| $300 |
| $350 |
| 11% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 200 HOUR | $60.50 | $65.00 | $68.00 | $68.50 | $79.77 | $65.00 | $80.00 | 11% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $9,500 | $3,500 | $3,000 | $8,500 | $9,223 | $6,000 | $3,578 | 9% |
| 204E30020 GRANULAR MATERIAL, TYPE C | 130 CY | $42.25 | $50.00 | $46.00 | $56.00 | $51.20 | $60.00 | $100 | 5% |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 59 SY | $81.00 | $100 | $87.00 | $80.50 | $109 | $225 | $145 | 4% |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $4,500 | $3,500 | $3,800 | $2,715 | $7,825 | $9,500 | $22,000 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $4,000 | $4,000 | $13,782 | $4,000 | $4,000 | $14,000 | $4,000 | 4% |
| 203E10000 EXCAVATION | 182 CY | $15.50 | $30.00 | $30.00 | $16.50 | $17.33 | $50.00 | $155 | 3% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 1 EACH | $2,530 | $2,305 | $2,558 | $2,160 | $2,300 | $2,300 | $2,300 | 2% |
| 204E13000 EXCAVATION OF SUBGRADE | 130 CY | $19.00 | $28.00 | $22.00 | $29.00 | $55.11 | $45.00 | $65.00 | 2% |
| 832E30000 EROSION CONTROL | 2,400 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 606E15050 GUARDRAIL, TYPE MGS | 87.5 FT | $27.00 | $24.56 | $28.00 | $39.00 | $24.50 | $24.50 | $25.00 | 2% |
| 666E10021 PRUNING EXISTING TREE, 24 TO 36-INCH DIAMETER, AS | 3 EACH | $750 | $750 | $480 | $948 | $670 | $667 | $900 | 2% |
| 632E90300 SIGNALIZATION, MISC.:STOP BAR RADAR DEDECTION MODI | 1 LS | $2,200 | $2,005 | $2,200 | $13,170 | $2,000 | $2,000 | $2,000 | 2% |
| 304E20000 AGGREGATE BASE | 46 CY | $46.00 | $95.00 | $86.00 | $58.00 | $93.34 | $193 | $190 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE(1.5") (VARIES 1 | 182 SY | $11.50 | $8.54 | $9.50 | $9.00 | $24.23 | $31.00 | $45.00 | 2% |
| 659E10000 SEEDING AND MULCHING | 285 SY | $7.25 | $10.00 | $6.20 | $6.50 | $6.16 | $5.00 | $6.00 | 2% |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $2,000 | $4,000 | $3,500 | $3,424 | $2,000 | $5,000 | $7,350 | 2% |
| 163 CY |
| $10.50 |
| $30.00 |
| $30.00 |
| $14.50 |
| $15.35 |
| $50.00 |
| $55.00 |
| 204E10000 SUBGRADE COMPACTION | 291 SY | $2.50 | $5.00 | $3.00 | $4.00 | $2.71 | $5.00 | $5.00 |
| 204E45000 PROOF ROLLING | 1 HOUR | $950 | $80.00 | $300 | $256 | $199 | $235 | $165 |
| 204E50000 GEOTEXTILE FABRIC | 291 SY | $3.60 | $2.50 | $3.50 | $0.50 | $4.02 | $2.25 | $4.50 |
| 625E31510 PULL BOX REMOVED | 1 EACH | $990 | $501 | $1,700 | $369 | $1,000 | $2,000 | $250 |
| 659E00300 TOPSOIL | 32 CY | $57.50 | $10.00 | $50.00 | $89.00 | $33.93 | $65.00 | $70.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 14 SY | $7.25 | $2.00 | $6.20 | $6.50 | $6.16 | $2.50 | $0.40 |
| 659E20000 COMMERCIAL FERTILIZER | 0.04 TON | $883 | $1,000 | $750 | $791 | $750 | $5,000 | $550 |
| 659E31000 LIME | 0.06 ACRE | $300 | $10.00 | $250 | $264 | $250 | $250 | $400 |
| 659E35000 WATER | 2 MGAL | $12.00 | $10.00 | $25.00 | $1.00 | $4.43 | $10.00 | $75.00 |
| 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1 | 4 SY | $84.50 | $125 | $167 | $122 | $157 | $335 | $260 |
| 605E05100 4" SHALLOW PIPE UNDERDRAINS | 168 FT | $11.50 | $14.00 | $18.00 | $7.50 | $33.91 | $29.00 | $35.00 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 10 FT | $26.00 | $13.00 | $40.00 | $12.50 | $93.14 | $70.00 | $55.00 |
| 611E00410 4" CONDUIT, TYPE F FOR UNDERDRAIN OUTLET | 16 FT | $19.50 | $16.00 | $32.00 | $27.00 | $62.61 | $55.00 | $35.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 20 FT | $26.00 | $10.00 | $42.00 | $28.00 | $54.58 | $34.00 | $50.00 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 2 EACH | $510 | $250 | $259 | $274 | $610 | $350 | $275 |
| 407E10000 TACK COAT | 53 GAL | $4.05 | $3.01 | $3.00 | $3.00 | $2.50 | $2.75 | $2.75 |
| 621E00100 RPM | 8 EACH | $245 | $223 | $247 | $234 | $222 | $222 | $222 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 4 EACH | $11.00 | $10.02 | $11.00 | $8.50 | $10.00 | $10.00 | $10.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 11 FT | $22.00 | $20.05 | $22.00 | $9.50 | $20.00 | $12.50 | $20.00 |
| 630E80100 SIGN, FLAT SHEET | 3 SF | $25.30 | $23.05 | $25.00 | $26.50 | $23.00 | $18.00 | $23.00 |
| 644E00100 EDGE LINE, 4" | 0.04 MILE | $19,455 | $17,731 | $19,700 | $18,638 | $17,690 | $17,690 | $17,690 |
| 644E00300 CENTER LINE | 0.06 MILE | $21,380 | $19,485 | $21,600 | $20,481 | $19,440 | $19,440 | $19,440 |
| 644E00400 CHANNELIZING LINE, 8" | 83 FT | $2.60 | $2.36 | $2.60 | $2.50 | $2.35 | $2.35 | $2.35 |
| 644E00500 STOP LINE | 29 FT | $6.45 | $5.86 | $6.50 | $6.00 | $5.85 | $5.85 | $5.85 |
| 644E01300 LANE ARROW | 2 EACH | $82.50 | $75.18 | $84.40 | $79.00 | $75.00 | $75.00 | $75.00 |
| 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I | 0.06 MILE | $12,100 | $12,000 | $12,335 | $11,589 | $34,520 | $11,000 | $11,000 |
| 614E22200 WORK ZONE EDGE LINE, CLASS I, 4", 740.06, TYPE I | 0.11 MILE | $6,678 | $6,000 | $6,750 | $6,397 | $18,235 | $6,072 | $6,072 |
| 614E24400 WORK ZONE DOTTED LINE, CLASS I, 740.06, TYPE I | 125 FT | $1.90 | $2.00 | $2.00 | $2.00 | $6.16 | $1.75 | $1.75 |
| 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I | 10 FT | $8.80 | $6.00 | $9.00 | $8.50 | $47.17 | $8.00 | $8.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $1,250 | $2,000 | $2,074 | $8,726 | $1,149 | $4,100 | $4,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $18,000 | $18k | 14% |
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 32 CY | $395.5 | $13k | 10% |
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 45 CY | $276.5 | $12k | 10% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 200 HOUR | $60.5 | $12k | 9% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $9,500 | $10k | 7% |
| 204E30020 GRANULAR MATERIAL, TYPE C | 130 CY | $42.25 | $5k | 4% |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 59 SY | $81 | $5k | 4% |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $4,500 | $5k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $4,000 | $4k | 3% |
| 203E10000 EXCAVATION | 182 CY | $15.5 | $3k | 2% |