LOR-SR 58-00.00
LOR County · est $1.7M
Bid dateThursday, January 11—
LOR County · est $1.7M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 6.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 32 more items below.
| Item | Quantity | R1Kokosing Construction Company INC | R2Erie Blacktop INC | R3Burton Scot Contractors LLC | R4Barbicas Construction Company INC | R5Chagrin Valley Paving INC | % of bid |
|---|---|---|---|---|---|---|---|
| 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 5,945 CY | $144 | $140 | $146 | $150 | $135 | 51% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 1,500 CY | $160 | $190 | $205 | $140 | $150 | 14% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.50 INCH) | 141,527 SY | $1.00 | $1.20 | $1.00 | $1.30 | $1.10 | 8% |
| Item | Quantity | R1Kokosing Construction Company INC | R2Erie Blacktop INC | R3Burton Scot Contractors LLC | R4Barbicas Construction Company INC | R5Chagrin Valley Paving INC |
|---|---|---|---|---|---|---|
| 202E30000 WALK REMOVED | 669 SF | $4.75 | $5.00 | $3.00 | $3.20 | $3.25 |
| 209E60500 LINEAR GRADING | 1.59 MILE | $2,500 | $1,100 | $1,000 | $1,500 | $500 |
| 209E80000 GRADING MAILBOX APPROACHES | 17 EACH | $10.00 | $245 | $150 | $80.00 | $30.00 |
| 608E10000 4" CONCRETE WALK | 73 SF |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $136,100 | $68,000 | $62,125 | $50,000 | $209,000 | 8% |
| 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 512 CY | $110 | $140 | $151 | $150 | $130 | 3% |
| 617E10100 COMPACTED AGGREGATE | 945 CY | $48.00 | $40.00 | $50.00 | $70.00 | $60.00 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40,000 | $40,000 | $45,000 | $120,000 | 2% |
| 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA | 11.62 MILE | $2,500 | $1,100 | $1,200 | $800 | $500 | 2% |
| 408E10001 PRIME COAT, AS PER PLAN | 6,679 GAL | $3.60 | $3.25 | $3.50 | $4.00 | $2.00 | 1% |
| 407E10000 TACK COAT | 7,872 GAL | $1.80 | $2.10 | $2.00 | $2.20 | $2.00 | 1% |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 16.28 MILE | $700 | $840 | $700 | $700 | $700 | 1% |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 15 EACH | $750 | $775 | $600 | $650 | $700 | 1% |
| 407E20000 NON-TRACKING TACK COAT | 3,528 GAL | $2.80 | $2.10 | $3.00 | $3.60 | $2.00 | 1% |
| 621E00100 RPM | 431 EACH | $22.50 | $22.90 | $22.00 | $23.45 | $23.45 | 1% |
| 608E52000 CURB RAMP (TYPE A2) | 596 SF | $16.00 | $19.80 | $20.50 | $15.00 | $15.25 | 1% |
| 253E02000 PAVEMENT REPAIR | 50 CY | $190 | $355 | $315 | $180 | $150 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $8,000 | $8,500 | $16,000 | $50,000 | $12,100 | 0% |
| 642E00094 EDGE LINE, 6" | 13.18 MILE | $600 | $640 | $600 | $600 | $600 | 0% |
| 614E12460 WORK ZONE MARKING SIGN | 97 EACH | $78.50 | $82.50 | $78.50 | $60.00 | $78.50 | 0% |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $6,000 | $4,400 | $5,500 | $40,000 | $10,000 | 0% |
| $16.00 |
| $16.80 |
| $16.25 |
| $10.00 |
| $8.55 |
| 608E53020 DETECTABLE WARNING | 32 SF | $36.00 | $37.80 | $90.00 | $50.00 | $52.50 |
| 623E39500 MONUMENT BOX ADJUSTED TO GRADE | 15 EACH | $300 | $295 | $675 | $350 | $395 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 1 EACH | $550 | $365 | $275 | $150 | $345 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 8 EACH | $500 | $675 | $750 | $450 | $485 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (0.0 TO 1.50 IN | 563 SY | $1.00 | $2.90 | $3.00 | $2.90 | $0.75 |
| 254E01600 PATCHING PLANED SURFACE | 707 SY | $1.50 | $5.00 | $2.00 | $1.15 | $10.00 |
| 442E20101 ASPHALT CONCRETE INTERMEDIATE COURSE, 9.5 MM, TYPE | 12 CY | $198 | $300 | $210 | $200 | $300 |
| 617E20000 SHOULDER PREPARATION | 1,866 SY | $0.40 | $0.90 | $1.40 | $2.00 | $1.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 418 EACH | $2.50 | $7.75 | $8.00 | $3.00 | $1.00 |
| 642E00300 CENTER LINE, TYPE 1 | 8.14 MILE | $600 | $835 | $600 | $600 | $600 |
| 644E00400 CHANNELIZING LINE, 8" | 1,025 FT | $1.30 | $1.05 | $1.30 | $1.30 | $1.30 |
| 644E00500 STOP LINE | 456 FT | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 |
| 644E00600 CROSSWALK LINE | 179 FT | $2.75 | $2.85 | $2.75 | $2.75 | $2.75 |
| 644E00601 CROSSWALK LINE, AS PER PLAN | 1,477 FT | $3.75 | $2.85 | $3.75 | $3.75 | $3.75 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 1,127 FT | $4.30 | $5.80 | $4.30 | $4.30 | $4.30 |
| 644E00900 ISLAND MARKING | 50 SF | $4.30 | $3.70 | $4.30 | $4.30 | $4.30 |
| 644E01000 RAILROAD SYMBOL MARKING | 4 EACH | $475 | $500 | $475 | $500 | $475 |
| 644E01100 SCHOOL SYMBOL MARKING, 72" | 4 EACH | $175 | $575 | $175 | $500 | $175 |
| 644E01200 PARKING LOT STALL MARKING | 380 FT | $1.50 | $1.60 | $1.50 | $1.50 | $1.50 |
| 644E01300 LANE ARROW | 36 EACH | $85.00 | $100 | $85.00 | $85.00 | $85.00 |
| 644E01600 HANDICAP SYMBOL MARKING | 1 EACH | $150 | $185 | $150 | $150 | $150 |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 4 EACH | $1,100 | $1,155 | $1,100 | $1,300 | $1,100 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 80 HOUR | $60.00 | $65.00 | $65.00 | $60.00 | $75.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 25 CY | $110 | $275 | $225 | $150 | $200 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 2,049 FT | $0.40 | $0.95 | $0.40 | $0.40 | $0.40 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 464 FT | $2.50 | $3.70 | $2.50 | $2.50 | $2.50 |
| 619E16010 FIELD OFFICE, TYPE B | 3 MNTH | $1,200 | $1,900 | $1,500 | $600 | $2,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,800 | $5,000 | $4,300 | $500 | $1,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 5,945 CY | $144 | $856k | 49% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 1,500 CY | $160 | $240k | 14% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.50 INCH) | 141,527 SY | $1 | $142k | 8% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $136,100 | $136k | 8% |
| 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 512 CY | $110 | $56k | 3% |
| 617E10100 COMPACTED AGGREGATE | 945 CY | $48 | $45k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 2% |
| 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA | 11.62 MILE | $2,500 | $29k | 2% |
| 408E10001 PRIME COAT, AS PER PLAN | 6,679 GAL | $3.6 | $24k | 1% |
| 407E10000 TACK COAT | 7,872 GAL | $1.8 | $14k | 1% |